{"efta_number": "EFTA00721946", "page_count": 22, "url": "https://epstein-data.com/EFTA00721946", "pdf_url": "https://epstein-data.com/pdf/EFTA00721946.pdf", "pages": [{"efta_number": "EFTA00721946", "page_number": 0, "text_content": "Fancelli\nPANELING\nOctober 26th 2010\nMolyneux Studio\nJuan Pablo Molyneux\n250 Lexington Avenue\nNew York, NY 10022\n(212) 628-0097\nSUBJECT: SAINT JAMES-DESIGNATED PUNCH LIST & PROPOSED NEW WORK\nPlease find below the punch list and documentation provided\n1.\nPunch List Items\n2.\nOutstanding Arrears\n3.\nNew Work\n4.\nNew Work\nAs per September 8th List, with provided Picture Log\nreference and Comments.\nPast Due to remit prior to travel plans\nNew Color Staining - Phase 1\nNew Color Staining - Phase 2\nItems Removed from Punch list as they are New Work\nShutters' Marquetry\n5.\nNew Work\n6.\nNew Work:\n7. New Work\nEscutcheons\nPerforated Panels at the Tilt Top Desks:\nItems Removed from Photo Log as they are not part of Punch List\n8.\nNot in Punch List\n9. Not in Punch List\nAttachments\n10.\nPunch List\n11. Picture Log\n12. Invoice 1098\n13. Invoice 1096\n14. Estimate 2010\n15. Estimate 2013\n16. Estimate 2014\nUpon request\n17.\n18. Panels Perforations\n19.\nUpon request\nColumns seams cracks\nCarver signature on column\nSeptember 8th email copy\nOctober 19, 2010\nOutstanding Arrears Executed work Balance [2009]\nOutstanding Arrears Travel expenses Balance [2009]\nShutters Marquetry and sketches\nNew Color Staining Phase One: Sample definition\nNew Color Staining Phase Two: Labor\nestimate Escutcheons\nPicture for approval of technique used\nestimate New Perforated Panels Installation\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 1 / 22\nEFTA00721946\n", "char_count": 1543}, {"efta_number": "EFTA00721946", "page_number": 1, "text_content": "Fancelli\nPANELING\n1 PUNCH LIST ITEMS\nAS PER SEPTEMBER 8TH LIST, WITH PROVIDED PICTURE LOG REFERENCE AND COMMENTS.\nITEM #\nITEM DESCRIPTION - SEPT 08 PUNCH LIST\nITEM STATUS\nCOMMENTS\n1A\n1. The decorative brass handles on the hardware\nholding the upper bookcases closed are\nOK\nsystematically coming off.\nAddressed and approved in March, 2010\nPhotograph transmitted to manufacturer for\nresponse and action\nPictures\nItem 1 September 8 List:\nPage1-4\n1B\nThe small screw pins holding the handles to the\nrods are not only backing out, but also shearing\noff.\nAddressed and approved in March, 2010\nOK\nPhotograph transmitted to manufacturer for\nresponse and action\nPictures\nItem 1 / September 8 List: Page1-4\n1C\nThese handles require a solution and correction\nusing custom pieces so that they will not continue\nto come off.\nOK\nPictures\nItem 1 / September 8 List: Page1-4\n1D\nin the alternative an additional $50,000 payment\nfor the handles would be acceptable and they will\nbecome Mr. Epstein's issue;\nNO\nnot\nacceptable\nNo Pictures\n2A\nPictures\n2B\n2. The concealed hardware inside the swinging\nbookcases at the entry doors is falling off.\nItem 2 / September 8 List: Page 5 to 14\nThe screws are too short for proper attachment to\nthe wood. .\nAddressed and approved in March, 2010\nPhotograph transmitted to manufacturer for\nresponse and action\nOur client, Molyneux Studio, was charged at cost\nfor the decorative hardware, less than\n$50,000.00 for all decorative hardware including:\nhinges, espagnolettes, pulls & handles ...\nApproved in March, 2010\nOK\nPhotograph transmitted to manufacturer for\nresponse and action\nPictures\n2C\nItem 2/ September 8 List: Page 5-14\nThe keys that operate the locks are breaking\nPictures\nItem 2 / September 8 List: Page 5-14\n2D\nINTENTIONALLY OMITTED - SEE BELOW\nescutcheons at the keyholes are missing\nfrom\nPunch List\nNEW ORDER\nAddressed and approved in March, 2010\nPhotograph transmitted to manufacturer for\nresponse and action\nNot an issue in March, 2010\nPhotograph transmitted to manuf\n... [truncated, 2272 chars — for the full page use /api/corpus/document/EFTA00721946/1 or ?id=EFTA00721946&page=1]", "char_count": 2272}, {"efta_number": "EFTA00721946", "page_number": 2, "text_content": "Fancelli\nPANELING\nITEM #\n3\nITEM DESCRIPTION - SEPT 08 PUNCH LIST\nThe hinges on the swinging bookcase doors are\nmisaligned and require corrective action.\nITEM STATUS\nPictures\nItem 3 / September 8 List: Page15-18\nTechnical\nLimitation\n4\nPictures\nThe connecting hardware at the sliding panels at\nthe picture window is loose or broken\nItem 4 / September 8 List: Page19-20\nOK\n5\nThe wood filler pieces at the perforated frames\naround the sliding panels at windows require open\njoints to be filled so daylight does not shine\nOK\nthrough.\nPictures\nItem 5\nSeptember 8 List: Page 21-22\n6A\nOpen joints in the woodwork,\n6B\nEspecially at the cornice allow the cove lighting to\nshine through and must be filled.\nDesign\nConcept\nPictures\nItem 6 from September 8 List: Page 23 to 37\n7\nPictures\nNumerous carved pieces of wood at the cornice\ntop edge are broken off and require repair and\nreplacement.\nItem 7/September 8 List: Page 38-40\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nOK\nCOMMENTS\nNot an issue in March, 2010\nBookcase used as concealed opening. Technical\nIssue linked to the type of design concept\nordered. We can work on the issue and -\nsomewhat improve it - but a perfect, flush and\neven alignment of swinging bookcases is not\ntechnically possible.\nNew replacement mechanism has been ordered\nIssue will be fixed.\nAddressed and approved in March, 2010\nThe frames around the sliding panels as designed\nwere intended to allow daylight to shine through\nHoles on carved frames can be filled in.\nAddressed and approved in March, 2010\nWe can address the issue but there are\nlimitations to our intervention:\n1. Philosophy of the design concept requested:\nto look like 200 years old woodwork that has\nbeen salvaged from the depth of the sea.\n2. Consequence of humidity damage from on\nsite extended exposure to high humidity\nlevels\n3. Prospective contraction and expansion of\nwood at the sea side location\nAddressed in March, 2010 and app\n... [truncated, 2108 chars — for the full page use /api/corpus/document/EFTA00721946/2 or ?id=EFTA00721946&page=2]", "char_count": 2108}, {"efta_number": "EFTA00721946", "page_number": 3, "text_content": "Fancelli\nPANELING\nITEM #\n8\nITEM DESCRIPTION - SEPT 08 PUNCH LIST\nSeveral cabinet doors require adjustment to fit\nevenly and square within their frames.\nITEM STATUS\nCOMMENTS\nNot an issue in March, 2010\nHinges and Espagnolettes created for the project,\nare replicas of 17 century technology, not\nDesign\nConcept\n&\nallowing for the adjustments that are possible\nwith contemporary devices.\nPictures\nItem 8 / September 8 List: Page 41-46\nTechnical\nIssue\n9\n10\nNo item #\nNo item #\nINTENTIONALLY OMITTED SEE BELOW\nThe perforated panels at the tilt top desk panels\nINTENTIONALLY OMITTED SEE BELOW\nShutters exterior sides\nNot in Punch List INTENTIONALLY OMITTED SEE BELOW\nColumns seams cracks\nNot in Punch List INTENTIONALLY OMITTED SEE BELOW\nCarver signature on column\nNo item # Not in Punch List Color Staining\nREMOVED\nfrom\nPunch List\nNEW ORDER\nREMOVED\nfrom\nPunch List\nNEW ORDER\nREMOVED\nNot In\nPunch List\nREMOVED\nNot In\nPunch List\nAlignment issue can be addressed and somewhat\nimproved - client request for alignment is not a\nfeature of the chosen hardware technically\ncannot be 100% fulfilled\nINTENTIONALLY OMITTED SEE BELOW\nNEW ORDER\nINTENTIONALLY OMITTED SEE BELOW\nNEW ORDER\nINTENTIONALLY OMITTED SEE BELOW\nINTENTIONALLY OMITTED SEE BELOW\nNEW ORDER\nNEW ORDER\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 4/22\nEFTA00721949\n", "char_count": 1436}, {"efta_number": "EFTA00721946", "page_number": 4, "text_content": "Fancelli\nPANELING\n2 OUTSTANDING ARREARS PAST DUE TO REMIT PRIOR TO TRAVEL PLANS\nDescription\nTerms of payment\nCurrency\nBalance on Executed approved work\nInvoice\n100%\n\"Work Complement\"\n€22,500.00\n#1098\nprior to departure\nSpring 2009\nInvoice\nTravel expenses\n# 1096 May June 2009\nSee Attachments copies of Invoices\n100%\n$18,618.00\nprior to departure\n3 NEW WORK: OUTSIDE PUNCH LIST\nNEW COLOR STAINING\nPHASE ONE: SAMPLE DEFINITION\nEstimate\nPhase One: Sample definition\nTerms of payment\nCurrency\n# 2013\nRequired Molyneux Studio Designer on site\nwith Finisher for of process and color\napproval\n100% on order\n€1,900.00\nNew Color - Sample Definition\n1 person\n2 days\n€950 / per Day per Person\nSupervision from Fancelli\nfor approval and signature\n1 person\n100% on order\n€2,400.00\n2 days\n€1.200.00 per Day per Person\nCrew - Expenses\n2 person\n2 days\n100% on order\n$1,520.00*\n$380.00 per Day per Person\nAir Fare\n100% on order\n$3,800.00*\n$1,900.00 per Person\n*Note Expenses are estimated for a Low Season Basis\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 5/22\nEFTA00721950\n", "char_count": 1178}, {"efta_number": "EFTA00721946", "page_number": 5, "text_content": "Fancelli\nPANELING\n4\nNEW WORK: OUTSIDE PUNCH LIST\nNEW COLOR STAINING\nPHASE TWO: PROJECTED LABOR STAINING\nEstimate\n# 2014\nFollowing the definition of the staining sample PHASE ONE we will be able to assess the\namount of work necessary to execute the finish expected.\nThe intervention is also likely to require some de-installation of cornices and columns\nPlease find below an \"estimated\" price range / bracket\nNEW COLOR\nLABOR\nNEW COLOR - ESTIMATED LABOR\nTerms of payment\nFROM\nAmount Range\nΤΟ\nProjected New Color - Staining Labor\n€950 / per Day per Person\n4 persons\n80% on order\n20% on\ncompletion\n€19,000.00 €22,800.00\n20 to 24 days\nProjected New Color\nCarpenter Labor\n€950 / per Day per Person\n80% on order\n20% on\n€13,300.00 €39,900.00\n2 persons\ncompletion\n7 days to 21 days\nNEW COLOR - PROJECTED EXPENSES\nNew Color - Expenses Staining Crew\n$380.00 per Day per Person\n4 persons\n20 to 24 days\nStaining Crew Flights\n100% on order\n$30,400.00 $36,480.00\n100% on order\n$7,600.00 $7,600.00\n100% on order\n$5,320.00 $15,960.00\nNEW COLOR - EXPENSES\nNEW COLOR\nSUPERVISION\n$1,900.00\n4 persons\nper Person\nNew Color - Expenses Carpenter Crew\n$380.00 per Day per Person\n2 persons\n7 days to 21 days\nCarpenter Crew Flights\n$1,900.00 per Person\n2 persons\n*air fare can be shared with color\nstaining intervention for carpenters\nNEW COLOR - SUPERVISION & APPROVAL\nNew Color - Supervision from Fancelli\nfor approval and signature\n1 person\n2 days\n€1.200.00 per Day per Person\nAir Fare\n$1,900.00 per Person\n*Note Expenses are estimated for a Low Season Basis\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\n100% on order\n*$3,800.00 *$3,800.00\n100% on order\n€2,400.00 €2,400.00\n100% on order\n$1,900.00 $1,900.00\nSTJ - Resolution Agreement - Oct 2010 Page 6/22\nEFTA00721951\n", "char_count": 1822}, {"efta_number": "EFTA00721946", "page_number": 6, "text_content": "Fancelli\nPANELING\n5\nItem #\n10\nNo\nPictures\nNEW WORK: REMOVED FROM PUNCH LIST\nMARQUETRY\nREMOVED FROM Punch List\nThe exterior sides (the side facing out\nand viewable from the exterior when\nlooking into the windows) of the\nsliding panels are completely\nunfinished and look like mere\nplywood. They are incomplete and\nneed to be completed.\nItem 10 / September 8 List: No Pictures\nNEW ORDER\nOutside the scope of the Purchase\nOrder. Both sides of the sliding panels\nwere to receive leather upholstery.\nWe have designed and submitted a\npricing to Molyneux Studio for\nmarquetry, Pricing below estimate\n#2010\nAlternatively, we can furnish and install\nan oak veneer\nMarquetry for Shutters\nMarquetry for Shutters\nTerms of payment\nCurrency\n50% on order\n30% prior to delivery\n€47,992.00\nProduction Shipping Installation\n20% at completion\nMarquetry for Shutters - Expenses\n2 persons\nEstimate\n5 days\n# 2010\n$380.00 per Day per Person\nAir Fare\n$1,900.00 per Person\n2 persons\n*air fare can be shared with color\nstaining intervention for carpenters\n100% on order\n$3,800.00*\n100% on order\n*$3,800.00*\n*Note Expenses are estimated for a Low Season Basis\n6\nItem #\n2D\nPictures\nNEW WORK: REMOVED FROM PUNCH LIST\nESCUTCHEONS\nREMOVED FROM PUNCH LIST\nand the escutcheons at the keyholes\nare missing\nIntentionally omitted see below\nItem 2 / September 8 List: Page 5-14\nNEW ORDER\nEscutcheons plates are not part of the\ndesign. Existing Brass Key holes filets\nhave been approved\nDesigner to provide escutcheons\ndesign approved by client.\nManufacturer will be contacted for\npricing and schedule\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 7/22\nEFTA00721952\n", "char_count": 1746}, {"efta_number": "EFTA00721946", "page_number": 7, "text_content": "Fancelli\nPANELING\n7\nItem #\n9\nNo\nPictures\nNEW WORK: REMOVED FROM PUNCH LIST\nPERFORATED PANELS AT THE TILT TOP DESKS\nREMOVED FROM PUNCH LIST\nThe perforated panels at the tilt top\ndesk panels are consistently\nunfinished on the right side. The\nperforations on the left side are\nshaped like flower petals, while the\nperforations on the right are simply\ndrilled. The photo of the Escorial\nLibrary and the shop drawings\nindicate the perforated panels are to\nmatch on each side.\nItem 9 / September 8 List No Pictures\nNEW ORDER\nExisting design was approved.\nAs per sent and attached technical\nreport image - the proposed solution\nneeds approval from designer and client\nThe new panels production with\nmatching perforations will be\naccomplished without cost.\nA pricing for on site installation labor\nwill be provided.\n8\nNEW WORK: ILLUSTRATED NOT IN PUNCH LIST\nCOLUMNS SEAMS CRACKS\nItem #\nNot in\nPunch\nList\nREMOVED from Picture Log List\nColumns seams cracks\nPictures\nItem / September 8 List: Page 47 to\n50\nNot in September 8th punch list\no Philosophy of the design concept\nrequested: to look like 200 years\nold woodwork that has been\nsalvaged from the depth of the sea.\no Consequence of humidity damage\nfrom on site extended exposure to\nhigh humidity levels\no Prospective contraction and expansion\nof wood at the sea side location.\nRepair cannot be ancticipated to be\npermanent\n9\nNEW WORK: ILLUSTRATED NOT IN PUNCH LIST\nCARVER SIGNATURE ON COLUMN\nITEM# REMOVED from Picture Log List\nNot in\nPunch\nList\nPictures\nCarver signature on column\nItem / September 8 List: Page 51\nNot in September 8th punch list\nThis is the wood carver original\nsignature, part of the work.\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 8/22\nEFTA00721953\n", "char_count": 1836}, {"efta_number": "EFTA00721946", "page_number": 8, "text_content": "Fancelli\nPANELING\nNOTES BELOW\nExtension of Work Period: any extension will be estimated and payable 100% prior to\nthe extension\nHumidity levels will be checked on site at the time of sample production to\nconfirm that color staining intervention is possible\nApart from Fancelli crew and Fancelli subcontractors, no other work and dust producing\nactivities can be executed as we work on the room.\nNotice of completion will be given 6 days prior to work completion and Work Approval\nmust be received in writing, within 3 days of notice of completion. Work\nApproval will be provided by Molyneux Studio, following the format previouly\nused [March 22nd 2010] [illustrated, referencing punch list itemization, and\napproval comment].\nNot Included: 2 movable scaffoldings required - provided by client.\nNot Included: Client to provide transportation to and from Little St James Monday to\nSaturday\nAs per previous intervention, work schedule Monday to Saturday full day\nIncluded: Material - send on site Shipment of paints, colors, protection equipment\nAll expenses are estimated for a Low Season Basis and will be adjusted to the\nintervention period.\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 9/22\nEFTA00721954\n", "char_count": 1325}, {"efta_number": "EFTA00721946", "page_number": 9, "text_content": "Fancelli\nPANELING\nPUNCH LIST SEPT 8th 2010\nSent from my BlackBerry wireless device\nFrom: Jeffrey Epstein\nDate: Wed, 8 Sep 2010 09:16:48 -0400\nTo: jp\nSubject:\n1. The decorative brass handles on the hardware holding the upper bookcases closed are systematically\ncoming off. The small screw pins holding the handles to the rods are not only backing out, but also\nshearing off. These handles require a solution and correction using custom pieces so that they will not\ncontinue to come off. In the alternative an additional $50,000 payment for the handles would be\nacceptable and they will become Mr. Epsteins issue;\n2. The concealed hardware inside the swinging bookcases at the entry doors is falling off. The screws are\ntoo short for proper attachment to the wood. The keys that operate the locks are breaking and the\nescutcheons at the keyholes are missing.\n3. The hinges on the swinging bookcase doors are misaligned and require corrective action.\n4. The connecting hardware at the sliding panels at the picture window is loose or broken\n5. The wood filler pieces at the perforated frames around the sliding panels at windows require open joints\nto be filled so daylight does not shine through.\n6. Open joints in the woodwork, especially at the cornice allow the cove lighting to shine through and must\nbe filled.\n7. Numerous carved pieces of wood at the cornice top edge are broken off and require repair and\nreplacement.\n8. Several cabinet doors require adjustment to fit evenly and square within their frames.\n9. The perforated panels at the tilt top desk panels are consistently unfinished on the right side. The\nperforations on the left side are shaped like flower petals, while the perforations on the right are simply\ndrilled. The photo of the Escorial Library and the shop drawings indicate the perforated panels are to\nmatch on each side.\n10. The exterior sides (the side facing out and viewable from the exterior when looking into the windows)\nof the sliding panels are completely unfinishe\n... [truncated, 2806 chars — for the full page use /api/corpus/document/EFTA00721946/9 or ?id=EFTA00721946&page=9]", "char_count": 2806}, {"efta_number": "EFTA00721946", "page_number": 10, "text_content": "Fancelli\nPANELING\nPictures document = see attachment\nItem 1 from September 8 List:\nPage 1 to 4\nDecorative Brass hardware Loose or broken\nItem 2 from September 8 List:\nPage 5- to 14\nConcealed hardware at swinging bookcase is falling off\nBreaking keys\nmissing escutcheons\nItem 3 from September 8 List:\nPage 15 to 18 included\nHinges on swinging bookcases are misaligned\nItem 4 from September 8 List:\nPage 19 to 20\nSliding panel rail broken\nItem 5 from September 8 List:\nPage 21 to 22\nLight in the carved shutters frames\nItem 6 from September 8 List:\nPage 23 to 37\nOpen joints in woodwork\n0\nLight come through at cornice\nItem 7 from September 8 List:\nPage 38 to 40\nCornice missing elements\nItem 8 from September 8 List:\nPage 41 - to 46\nAlignment of cabinet doors\nItem 9 from September 8 List:\nPerforations\nNo pictures\nColumns Seams/Cracks/Words Carved In Columns:\nPage 47 to 50\nCARVER SIGNATURE\nNOT in the PUNCH LIST\nPage 51\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 11/22\nEFTA00721956\n", "char_count": 1105}, {"efta_number": "EFTA00721946", "page_number": 11, "text_content": "Fancelli\nPANELING\nDate:\nSeptember 24, 2009\nInvoice\n1096\nMolyneux Studio\n29 East 69th Street\nNew York, NY 10021\n(212) 628-0097\nLSJ Expenses\nJob Reference:\nWith Receipts\nDear Pascal and Jeremy:\nPlease find below Invoice 1096 with justification receipts of the travel\nexpenses for the period May 18 - June 24, 2009\nReceipts reference is indicated in the Item# column\nCopy of receipts are to be found in PDF attachments\nThank you to let me know if you need further assistance\nBest regards,\nChristian Barthod\nLSJ Installation Expenses\nFrom\nΤο\nMay 18th to\nJune 21st, 2009\nItem\nNature\nDescription\nAmount $\nARCarredo SAS di\nFrancesco Guerazzi\nMay 18-June 21 2009\nInvoice\nArcArredo -2009-Sep-04\nAirfare\nFood\nTransportation\n4 installers, Italy - St. Thomas\nMeals, Groceries and Linens\nCar Rental, gas\nTransportation Tip Driver\n[€ 5,264.24=]\n$ 7,451.00\n$2,661.25\n$ 2,134.00\n$120.00\nJean Pierre Fancelli\nJune 17-24, 2009\nJune 17-21, 2009\nTeresa Travel\nReceipts as pdf\nAirfare\nFood\nParis - USVI\nmeals\n$1,173.00\n$454.00\nDavid Collins\nMay 18th June 21st\nInvoice #51409\nHouse Rental\n6E-1 Estate Nazareth\nSt. Thomas, USVI 00802\n$4,625.00\nTOTAL DUE USD\n$18,618.00\nNote: €= USD 1.41541 at June 1 09\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 12/22\nEFTA00721957\n", "char_count": 1364}, {"efta_number": "EFTA00721946", "page_number": 12, "text_content": "Fancelli\nPANELING\nSeptember 30, 2009\nINVOICE\nMolyneux Studio\n29, East 69th Street\nNew York, NY 10021\n(212) 628-0097\nAttn: Aurélien Gallet:\nEstimate\nWork order\nJob Reference:\nArticle Description\nFacing Panels for vestibule doors adjusted to existing\nembrasure.\nDecorative Hardware Not Included\nWoodwork complements and fillers\nto conceal gaps between woodwork and building\nconstruction discrepancies. see report #10-A pictures\nLarge bay window;\n2 windows;\n2 entrance doors embrasures\nCabinet door replacement with Bamboo grill doors\nDecorative Hardware Not Included\nColor staining and finish of the above\nOn site installation\n1098\n1065 - D\nJpf email 05/09/2009\n8321\nSt. James\ncomplements\nU Qty\nAmount\nEUROS\n1\n1\n1\nTotal production\n€40,000.00\nTRAVEL & LIVING EXPENSES\nEstimated price. Le remboursement des frais de\nvoyage et de séjour engagés pour le personnel devant se\ndéplacer dans la limite du budget de 13000€ que nous\navions calculé ;\nRefund of travel expenses and sojourn - food\naccommodation will be charged AT COST at the end of\nstay estimated €13,000.00\nTOTAL\n€40,000.00\nMr. Molyneux requested to consider the options to Block shutters' cut out to create absolute\ndarkness in the room.\nWork to be performed & to schedule:\n。\nWood work complement - upon approval\n。 Color finish touch up\nColor touch up - and wood work complement can be done after the completion of the large\nwindow bay and parquet floor.\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 13/22\nEFTA00721958\n", "char_count": 1594}, {"efta_number": "EFTA00721946", "page_number": 13, "text_content": "Fancelli\nPANELING\nAs per Jean Pierre Fancelli Email:\nFrom: Jean Pierre PORTABLE1 [mailto:\nSent: Sat 05/09/2009 00:52\nTo: Aurelien Gallet\nSubject: LSJ\nCher Aurelien,\npour faire suite à notre conversation\nje propose à Mr Molyneux un forfait de 40 000€\npour les travaux décrits dans notre dernier devis ;\nLe remboursement des frais de voyage et de séjour engagés pour le personnel devant se\ndéplacer dans la limite du budget de 13000€ que nous avions calculé ;\nj'espère que cette proposition sera agréée par Mr Molyneux, restant à votre disposition,\nveuillez accepter mes meilleures salutations\nJean Pierre Fancelli\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 14 / 22\nEFTA00721959\n", "char_count": 799}, {"efta_number": "EFTA00721946", "page_number": 14, "text_content": "Fancelli\nPANELING\nDate:\nSeptember 27, 2010\nEstimate\nWork order\nMolyneux Studio\n750 Lexington Avenue\nNew York, NY 10022\n(212) 628-0097\nVIA EMAIL Juan Pablo Molyneux\nQty\n2010\nWaiting\nSt. James Office\nJob Reference:\nDescription\nMotifs marquetés sur portes dérobées des bibliotheques, volets coulissants aux deux\nextrémités de l'office, Volets Coulissant sur grande baie\nAmount €\nSuivant dessins proposé17 Septembre 2010\nApprové17 par Molyneux Studio confirmation de Cesar 20 septembre 2010\nEtude des motifs marquetés réalisation de dessins pour répartition des essences\nde bois\n1,200.00 €\nFaçades des portes dérobées et volets coulissants aux deux extrémités de\nl'office\n8\ncoté office et contre face à motifs de damiers en marqueterie en chêne avec fil\nde bois alternés, filet noir de 2mm,plate bande de 5 cm au pourtour de la\ncomposition avec filet noir et filet de bois clair de 4mm. Dim 1739x900\n14,000.00 €\nVolets Coulissant sur grande baie\n2\nface office et contre face même travail à damiers en marquèterie de 1964x1742\navec filet et plate bande\n6,840.00 €\n4\n2 volets latéraux face office et contre face même travail à damiers en\nmarqueterie de 1964x749 avec filet et plate bande\n6,600.00 €\nMarquèterie,\n96\nmotifs marins en marqueterie suivant dessin repartis sur les faces à damiers\n10,272.00 €\nmise en caisse Transport a St. Thomas\n1,380.00 €\nLivraison sur site a St. James a la charge du client\nPose et finition sur place\nTOTAL SOLUTION DE BASE\n8,900.00 €\n47,992.00 €\nOption Moins Value -5,500.00 €\nVariante en moins value: la face et contre face des volets de la baie vitrée\nmarquetés à damiers, contre face des portes dérobées et volets coulissants aux\ndeux extrémités de l'office, en chêne de fil, sans damiers marquetés\nTOTAL SOLUTION en Variante 42 492,00 €\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 15 / 22\nEFTA00721960\n", "char_count": 1954}, {"efta_number": "EFTA00721946", "page_number": 15, "text_content": "Fancelli\nPANELING\nMessage transféré\nDe <cesar@molyneuxstudio.fr>\nDate: 20 septembre 2010 10:40\nObjet Little st james\nA: jeanpierre fancelli <\nJPM Mobile\nM Fancelli,\nM Molyneux me demande de vous dire que M Epstein a aime et approuve le sketch des\nvoles.\nM Epstein a souligne qu'il vous attend avec votre equipe le 23 sur l'ile.\nMerci de nous confirmer votre presence a la date du 23.\nMerci\nCesar\nCe message a été envoyé depuis un terminal BlackBerry de Bouygues Telecom\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 16 / 22\nEFTA00721961\n", "char_count": 656}, {"efta_number": "EFTA00721946", "page_number": 16, "text_content": "Fancelli\nPANELING\nchewe de fil\nblanche\nfilet chène\nваже\nmotif marqueters\nmalin\n+176m\nPRINcipe pou\nmarquettere volt St Jams.\nConditions\n: accord sur présent devis, suivant sketsch approuvé.\nAcompte de 50% a l'acompte\nExécution 4 semaines à partir de la commande\nTransport par avion en caisse bois\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 17/22\nEFTA00721962\n", "char_count": 480}, {"efta_number": "EFTA00721946", "page_number": 17, "text_content": "Fancelli\nPANELING\nDate:\nOctober 26, 2010\nEstimate\nWork order\nMolyneux Studio\n750 Lexington Avenue\nNew York, NY 10022\n(212) 628-0097\nVIA EMAIL Juan Pablo Molyneux\nAs per Designated Punch List & Proposed New Work\nNEW WORK: NEW COLOR STAINING\nItem Description\nRequired: Molyneux Studio Designer on site\nfor approval and signature\nNew Color - Sample Definition\n2013\nWaiting\nSt. James Office\nNEW COLOR -\nJob\nPHASE ONE:\nReference:\nSAMPLE\nDEFINITION\nPHASE ONE: SAMPLE DEFINITION\nTerms of payment\nCurrency\nwith Finisher, for process and color approval\n100% on order\n€1,900.00\n1 person\n2 days\n€950 / per Day per Person\nSupervision from Fancelli\nfor approval and signature\n1 person\n100% on order\n€2,400.00\n2 days\n€1.200.00 per Day per Person\nCrew - Expenses\n2 finisher persons\n2 days\n100% on order\n$1,520.00*\n$380.00 per Day per Person\nAir Fare\n100% on order\n$3,800.00*\n$1,900.00 per Person\nEstimated TOTAL €\nEstimated TOTAL $\n€4,300.00\n$5,320.00\n*Note Expenses are estimated for a Low Season Basis\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 18 / 22\nEFTA00721963\n", "char_count": 1175}, {"efta_number": "EFTA00721946", "page_number": 18, "text_content": "Fancelli\nPANELING\nDate:\nOctober 26, 2010\nMolyneux Studio\n750 Lexington Avenue\nNew York, NY 10022\n(212) 628-0097\nVIA EMAIL Juan Pablo Molyneux\nEstimate\nWork order\nJob\nReference:\n2014\nWaiting\nSt. James Office\nNEW COLOR -\nPHASE TWO: Labor\nESTIMATION\nNEW COLOR STAINING\nPHASE TWO: PROJECTED LABOR STAINING\nFollowing the definition of the staining sample PHASE ONE as defined in Estimate 2013,\nwe will be able to assess the amount of work necessary to execute the finish expected.\nThe intervention is also likely to require some de-installation of cornices and columns\nPlease find below an \"estimated\" price range / bracket\nNEW COLOR - EXPENSES\nNEW COLOR\nLABOR\nNEW COLOR - ESTIMATED LABOR\nTerms of payment\nFROM\nAmount Range\nΤΟ\nProjected New Color - Staining Labor\n4 persons\n€950/per Day per Person\n20 to 24 days\n80% on order\n20% on\ncompletion\n€19,000.00 €22,800.00\nProjected New Color\nCarpenter Labor\n€950 / per Day per Person\n80% on order\n20% on\n€13,300.00 €39,900.00\n2 persons\ncompletion\n7 days to 21 days\nNEW COLOR - PROJECTED EXPENSES\nNew Color - Expenses Staining Crew\n$380.00 per Day per Person\n4 persons\n20 to 24 days\nStaining Crew Flights\n100% on order\n$30,400.00 $36,480.00\n$1,900.00/per Person\n100% on order\n$7,600.00 $7,600.00\n4 persons\nNew Color - Expenses Carpenter Crew\n$380.00 per Day per Person\n100% on order\n$5,320.00 $15,960.00\n2 persons\n7 days to 21 days\nCarpenter Crew Flights\n$1,900.00 per Person\n2 persons\n*air fare can be shared with color\nstaining intervention for carpenters\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\n100% on order\n*$3,800.00 *$3,800.00\nSTJ - Resolution Agreement - Oct 2010 Page 19/22\nEFTA00721964\n", "char_count": 1715}, {"efta_number": "EFTA00721946", "page_number": 19, "text_content": "Fancelli\nPANELING\nNEW COLOR\nSUPERVISION\nNEW COLOR - SUPERVISION & APPROVAL\nNew Color - Supervision from Fancelli\nfor approval and signature\n1 person\n2 days\n€1.200.00 per Day per Person\nAir Fare\n$ 1,900.00 per Person\n*Note Expenses are estimated for a Low Season Basis\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\n100% on order\n€2,400.00\n€2,400.00\n100% on order\n$1,900.00 $1,900.00\nSTJ - Resolution Agreement - Oct 2010 Page 20/22\nEFTA00721965\n", "char_count": 520}, {"efta_number": "EFTA00721946", "page_number": 20, "text_content": "Fancelli\nPANELING\nDESK FLAP DOOR\n*****\n*****\nThe drilled hole left side does not same than the right side.\nTo solve the problem we have to replace all drilled panels with new panels\nall equal.\nWe have to cut the back side of the door that holds the drilled panel (using a\nrotor), then replace that panel and then glue a new oak frame around the\npanel\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nwww.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 21 / 22\nEFTA00721966\n", "char_count": 537}, {"efta_number": "EFTA00721946", "page_number": 21, "text_content": "Fancelli\nPANELING\nPANEL TO CHANGE\nEND\n*\nSIDE TO CUT WITH A ROTOR AND\nTHEN TO GLUE A NEW FRAME\n24 EAST 64TH STREET\nNEW YORK, NY 10021\n212 935 6537 fax 212 935 6538\ninfo@fancelli-paneling.com\nWWW.FANCELLI-PANELING.COM\nSTJ - Resolution Agreement - Oct 2010 Page 22/22\nEFTA00721967\n", "char_count": 278}]}