{"efta_number": "EFTA00642764", "page_count": 2, "url": "https://epstein-data.com/EFTA00642764", "pdf_url": "https://epstein-data.com/pdf/EFTA00642764.pdf", "pages": [{"efta_number": "EFTA00642764", "page_number": 0, "text_content": "From: \nTo: Jeffrey Epstein <jeevacation@grnail.corn> \nCc: 20/TO Ranch \nSubject: ZDC Project Update \nDate: Fri, 05 Jun 2015 13:52:08 +0000 \nProject Status below for your review \nMovie Room: \nNew equipment install completed, One blown sub woofer, options to be forwarded \nGun Cabinet panels leather inserts completed \nChaises and Chairs ordered, estimated delivery last week of July \nPool/Gym sound system: \nCompleted \nSurge Protection: \n90% Complete \nMain Distribution Pumps: \nNew Skid ordered, estimated delivery, week of the 8th June \nInstall will take 3 days \nPresent status, have one pump running, manual operation only,. \nOutdoor Rugs: \nOrdered, expect delivery, week of the 8th June \nBunkhouse Sofa: \nOrdered, delivery estimated last week of July \nOutside Furniture Lodge: \nPurchasing wood 8th June, completion end of July \nJJ's: \nBunkhouse windows delivered yesterday, work starts today \nLodge Deck Roof, completed \nLV Tennis Court resurface, weather delayed, work started Tues this week \nPainting: \nWorkshop and wash bay interior completed \nPole Barn and Eves of Workshops completed \nPicket Fences RC and LV Fence completed \nBunk House exterior to begin once windows are installed \nChess fountain basin sealed, completed \nRC Bumpers week of the 8 June \nMH and Estancia doors waxing week of the 8 June \nMasterbed room window sills week of the 8 June \nLandscaping: \nNew Sod at Pool Area, complete \nHydroseeder, on sight, hydroseeding MH and LV next week \nPlanter beds MH, anticipate to start clearing 17th June \nLog Cabin Grading, anticipate to start rock collecting etc 15th June \nWorking on new design to include terraces \nNew JD Ride on Mower RC, pickup 8th June \nCottonwood trees RC end of June \nEFTA00642764\n", "char_count": 1718}, {"efta_number": "EFTA00642764", "page_number": 1, "text_content": "Auto: \n5500 Mercedes, Transfer to NM registration today \nAwaiting directing regarding Paint/Rust \nFlat Bed Trailer, purchase today, pickup Monday 8th \nPoolpak: \nNew compressor due today \nTrane to install next week \nHVAC controls \nInvestigating second bid that allows wifi thermostat control. \nWater Development: \nAbandoned Well plugged, plan has been filed with State \nApplication to move Dakota Water Right to Well B has been file, awaiting OSE approval \nCasey Cook is recommending the construction of a irrigation pond. \nThe State need to advise if pond can has to be in the \" Place of Use\" or can be constructed outside this area. \nWe need OSE direction on pond location to confirm estimated cost of final 2 phases of this Project.. \nregards Brice \nBrice Gordon \nStanley, NM \nPh: \nEFTA00642765\n", "char_count": 797}]}