{"efta_number": "EFTA00640906", "page_count": 2, "url": "https://epstein-data.com/EFTA00640906", "pdf_url": "https://epstein-data.com/pdf/EFTA00640906.pdf", "pages": [{"efta_number": "EFTA00640906", "page_number": 0, "text_content": "From: Richard Kahn\nTo: \"jeffrey E.\" <jeevacation@gmail.com>\nSubject: Fwd: Update on tower\nDate: Mon, 09 Jun 2014 17:56:24 +0000\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York, NY 10022\ntel\nfax\ncell\nBegin forwarded message:\nFrom: Terrence Rabsatt <|\nSubject: Re: Update on tower\nDate: June 9, 2014 at 10:52:24 AM EDT\nTo: Darren Indyke <|\nCc: Jeanne Brennan\nRichard Kahn <\nGood day,\n>, Cecile deJongh <|\nHope all is well. I wanted to get all info before relaying anything to you. As it stands we can put the tower at\nany height we want. DW only recommends the best possible signal path and then gets it approved from FCC.\nThey however relayed to me that if I choose not to install where recommend, and I get issues with signal\nintegrity it voids my warranty. I gave them the new coordinates and the lowest we can go at either location is\n30ft. I will be charged to go back to FCC for a new license at this height. So I would like for us to finalize the\nlocation so we can do this just once. Please be advised that this changes the layout on LSJ. After going over\nthe path study and doing another walk through with Jermaine. I have decided that the best way to cover the\ndead spots is to turn five palms and the Kit House into a link and install 4 other bridges at those locations. This\ngives us full coverage even at the lower height or changed tower location.\nExtra cost adjustment would be about (4) AP-CPES @ $3,996.00, (4) 802.11 a/n bridges @ $2,516.00, I will\nhowever waive the extra labor cost which brings your total to $26,048.00\nAlso do we have a decision on weather or not we are servicing customers or just ourselves.\nRegards,\nTerrence Rabsatt\n(340)201-1331\nOn Jun 6, 2014, at 10:49 AM, Darren Indyke\nwrote:\nBy they, do you mean Dragon Wave? And did Dragon Wave say when the new studies would be completed?\nIf so, please let me know when. If not, can you get the date of completion from them, please. Thanks.\nEFTA00640906\n", "char_count": 1959}, {"efta_number": "EFTA00640906", "page_number": 1, "text_content": "DARREN K. INDYKE\nDARREN K. INDYKE, PLLC\n575 Lexington Avenue, 4th Floor\nNew York, New York 10022\nTelephone:\nTelecopier:\nMobile:\nemail:\n**\nThe information contained in this communication is confidential, may\nbe attorney-client\nprivileged, and is intended only for the use of the addressee. It is the property of\nDarren K. Indyke, PLLC. Unauthorized use, disclosure or copying of this communication\nor any part thereof is strictly prohibited and may be unlawful. If you have received this\ncommunication in error, please notify us immediately by return e-mail,\nand destroy this\ncommunication and all copies thereof, including all attachments.\nCopyright of Darren K. Indyke, PLLC - 2014 Darren K.\nIndyke, PLLC All rights reserved.\n*******\nOn Jun 5, 2014, at 3:01 PM, Terrence Rabsatt\nwrote:\nGood afternoon sir,\nJust letting you know that I have sent all the gps coordinates to DW and they will do the path study along\nwith giving the lowest height recommend for both locations.\nRegards,\nTerrence Rabsatt\nEFTA00640907\n", "char_count": 1013}]}