{"efta_number": "EFTA00634508", "page_count": 2, "url": "https://epstein-data.com/EFTA00634508", "pdf_url": "https://epstein-data.com/pdf/EFTA00634508.pdf", "pages": [{"efta_number": "EFTA00634508", "page_number": 0, "text_content": "From: Daphne Wallace\nTo: Jeffrey Epstein <jeevacation@gmail.com>\nCc: ann rodriquez\nSubject: Road Paving Project - December 15, 2014\nDate: Mon, 15 Dec 2014 14:58:12 +0000\nGreetings Mr. Epstein,\nRich Kahn\nBelow, for your review and comments, is a summary of a proposed plan and schedule for the Road\nPaving project:\nBetter Roads can begin the Road Paving project the week of Monday, January 26, 2015. They would\nmobilize their equipment and lighter materials, using Big N or Boyson, spend this first week prepping,\nand begin laying the asphalt the week of February 3rd.\nBig N will be the auxiliary vessel for transportation throughout the work day in the event\nBetter Roads needs an extra load for that day, or if they needed to transport support equipment.\nBetter Roads will coordinate with LSJ on transportation needs.\nPresuming that the scope of the project is still the same, Better Roads estimates transporting 75-80\ntruckloads of asphalt in total for the project. They will need 5-7 truckloads per day. Better Roads has\nplanned a 5 day per week schedule, and will leave Saturdays and Sundays for \"rain days\".\nBoyson can move 2-3 trucks per trip. To catch the high tide, Better Roads will be at Red Hook at 6:30\nam with all 6 loads. Boyson will take the first group (2-3 trucks), turn right around and deliver the\nsecond group, and a third group if needed. Boyson would then come back before the end of the day\nto return the 6 trucks to STT.\nBetter Roads will reserve the trucks for this job only, so that Boyson does not have to make extra runs\nto return empty trucks for other jobs on STT.\nBetter Roads was asked, and they are willing to transport materials and/or supplies back from LSJ on\nreturn trips to St. Thomas.\nThe proposed schedule outlined for your review is as follows:\nEFTA00634508\n", "char_count": 1799}, {"efta_number": "EFTA00634508", "page_number": 1, "text_content": "Week 1: Monday, January 26 to Friday, January 30 - Using Big N and Boyson -\nBetter Roads mobilizes equipment to LSJ, begins prep work on LSJ\nWeek 2: Monday, February 3 to Friday, February 6 - Using Boyson - Better Roads paving (30 loads)\nWeek 3: Monday, February 10 to Friday, February 13 - Boyson - Better Roads (30 loads)\nWeek 4: Monday, February 17 to Friday, February 20 - Boyson - Better Roads (20 loads)\nRespectfully submitted,\nDaphne\nEFTA00634509\n", "char_count": 454}]}