{"efta_number": "EFTA00630367", "page_count": 2, "url": "https://epstein-data.com/EFTA00630367", "pdf_url": "https://epstein-data.com/pdf/EFTA00630367.pdf", "pages": [{"efta_number": "EFTA00630367", "page_number": 0, "text_content": "Punch List - per JE directives and Updates as of March 23, 2012\n1. Rug - arriving in NY 3/21, should be delivered to Tropical in NJ 3/23 with proper rug pad for JE bath and\noriginal 3 guest room rugs - as of 3/23, arrival at Tropical NJ is still pending\n2. Flagpole Bath and Cabana - slipcovers for sofa/cushion on site, piping around arm chairs requested, Sarah\nwill order extra fabric\n3. Five Palms\n- interior stucco - ongoing\n- electrical -ongoing\n- solar estimate 3/9\n- Floor - material ordered 3/23\n- Doors location and fabrication - manufacturer has submitted a quote and shop drawings 3/23\n-Lighting schedule\n- Concrete top section completed\n-Step installation completed\n(coral stone bull nosing on site, require coral stone) modeled after MC\n- Big Slab installation completed (require 4 holes for trees - size required - completed)\n4. Grotto - steps demolished, starting hammer work and excavation, debris placed at dump site\n- determine shelter height - roof for Grotto shed\n5. Heli Garage - completed\n6. Heli Road - saw cutting continues\n7. Hangar -floor sanding in progress - 40'X50' area for slab, 3 foot wall around it - containment for ISO\nfuel tank - bathroom and room divider - subcontractor\n8. Steel Shed - have estimate for building, schedule to be forwarded 3/10\n9. Triangle - needs more dirt - in progress\n10. Entry Tree Lights - confirmed ground lighting\n11. Library Dehumidification - commences week of 12 Mar\n12. Solutions for Generators -drawings complete for bid package\n- generator room sound proofing, need to confirm schedule\n13. Top of hill - CLEAN UP - remove rocks and hydroseed-hydroseeding 3/23\n14. Tree Order - x 7-12ft and 3-15 ft Palms quoted-awaiting JE directive\n-x2 15ft Palms to be placed at entrance area\n15. Tiki - Shields - check with Sarah for date, still pending\n- Dock box in production\n16. Sunken garden berm - continues\n17. Concrete roads at flagpole - per JE build another ramp\n18. Bench placements - continues\n19. Engineering clean up - continues\n20. New vehicles - two more Polaris bikes (800's) - Larry/Brice\n21. Dock decking - discuss pressure treated timber/carpeting\n-investigate having movable sections\n22. Aquarium photos Library-installed\n23. Mgrs Cottage Roof work remains - completion 3/29\n24. Mooring Permit - proceeding with bids to place anchors\n25. Electrical quotes-forwarded to JE\n26. Rationalize Telephone system - Extension list completed, Voice mail set up at\nBeach Office, Kitchen MC, Managers Cottage\n27. Gates - to hide engineering both at top and bottom of hill.\nBill reviewing light weight gates for bottom of hill - JE advises three 8 foot gates - bi-fold design running in\ntrack on the ground\n-require design\nEFTA00630367\n", "char_count": 2698}, {"efta_number": "EFTA00630367", "page_number": 1, "text_content": "28. Engineering service road reshaped - continues\n29. Dock lighting - barn lights for structures on site, awaiting installation\n30. Guest House at Beach 3-sited\n31. Chillax room - furniture piece required for electrical/media equipment\n32. Replacement Transformer Mechanical building - have bid - reviewing shipping - Brice to finalize cost\ncomparisons-refurbishment VS. new\n33. Photos for Chillax bath-installed\n34. Floating Dock - substructure support in place and bolted\n- JE design to handle 2 jet skis\n35. Midnight Express - trailer on site\n36. Sundial-completed\n37. Boats - Midnight - sell existing motors\n38. Sod\nPurchase x 3 Yamaha 300 motors\nPRD -sell\nCalypso - refurbish\n39. Motor court wall extension - in progress\n40. Hydro seeding - as much as possible especially when it rains\nEFTA00630368\n", "char_count": 804}]}