{"efta_number": "EFTA00622171", "page_count": 1, "url": "https://epstein-data.com/EFTA00622171", "pdf_url": "https://epstein-data.com/pdf/EFTA00622171.pdf", "pages": [{"efta_number": "EFTA00622171", "page_number": 0, "text_content": "NES LLC \n1 Generator Service - parts ordered - end of march 2017 completion \n2 Door Finger scanner - jee wants 12inch x 12inch (per sawyers most are designed to go into wood not concrete) \nJEE to meet Sawyers at 71st week of 3/13 \n3 Security System - bid by Security 101 negotiated to 73,333 \nadditional costs carpet / paint / carpentar - estimated 14,000 -> total project cost 87,333 (june 15-30 completion) \nJEE to meet with Vilinsted to pick desk colors at 71st week of 3113 \n4 ADT BurglarAlarrn System - need to obtain 3 bids (ADT, Sawyers & Secrurity 101) \n5 Phone System - last inquiry end of 2016 JEE said pass \n6 Fix Statute / Dresser in Hallway & Armoire in Master - restorer back in NYC March 16th -> end of March 2017 completion \n7 Bentley - May 2017 arrival -> balance due = 240k plus tax (425 cost less 135 Mercedes Trade + 50 deposit) \n8 Pinto -> march 22nd they will begin taking out carpet in DR -> then begin painting \n100k euro paid 1/4/2017 and 300k euro paid 3/6/2017 \nneed final terms: construction proposal was 868,500 euro and decoration proposal (DR, Massage&Mlsc 100K) 649,850 euro \n9 Kitchen Floor? \n10 Massage room bathroom? \n11 Staffing \n12 Francis Derby \n13 Basement Batteries (kicks in before generator fires up) - need to be replaced - 14,400 bid \n14 Christies - selling desk - auction date april 28th (exceptional sale) \n15 Replace Molded Pane Glass windows - Gym (2) & Master bath shower (1) \n16 Steam clean all rugs - 6th floor done / 5th floor - done by stanley / 4th floor (only 1 bedroom done - shampoo and steam) \n17 Curtains throughout the house - dryclean or replace per Dwayne (Jon C butler) \n18 Mervin to take Firesafety course \n19 Gym - program 3-4 remotes into universal remote if possible \n20N Flooring - replace carpet with flooring - cost 10k \n21 Railing off 4th floor guest bedroom needs paint as it is rusting \nPer John Christenson list \n22 Replace broken venetian blinds in 6th floor kitchen \n23 Continue to change halogen and incandescent light bulbs whereever possible to LED \n24 Ion paint walls in back stairway \n25 Finish cleaning exterior glass of skylihgt with muriatic acid and 000 steel wool \n26 Shorten lamp wires in LIR / organize \n27 Cleanup wires In oval office \n28 Organize all storage rooms per Artwork / Furniture /Antiques / Equipment \n29 Photograph and catalog storage items \n30 Update House manuals to reflect current technology \nEFTA00622171\n", "char_count": 2411}]}