{"efta_number": "EFTA00621644", "page_count": 6, "url": "https://epstein-data.com/EFTA00621644", "pdf_url": "https://epstein-data.com/pdf/EFTA00621644.pdf", "pages": [{"efta_number": "EFTA00621644", "page_number": 0, "text_content": "LSJ CONSTRUCTION\nSubcontractor Payout\nProject:\nTrade:\nFlagpole Pool #1013\nPlaster\nJuly 18, 2011\nRequisition #1\nSubcontractor Phillip Mark\nInvoice # Requisition #1\nInsurance expiration: May 14, 2012\nPartial\nFinal\nPhase #\n09-200\nOriginal Contract Sum:\nChange Orders Submitted & Approved:\nNew Change Orders:\nTotal Work Contracted to Date:\nTotal Work Completed to Date:\nLess Retainage:\nTotal Payments Made to Date:\n$11,212.12\n$1,899.76\n$0.00\n$13,111.88\n100%\n$13,111.88\n$0.00\nTotal Current Payment Due:\nBalance to Finish including Retainage:\nSales Tax Liability:\na. Subcontractor/Supplier is liable, explain Labor and materials\nb. Non-resident Subcontractor/Supplier Bond Applicable:\nc. Use Tax to be paid by our company:\nd. Shipping\nTotal Outlays for this contract incl. Sales or Use Tax:\nJEE approval attached\nincl.\nInvoice Attached\n$0.00\n$13,111.88 k\n$0.00\n$13,111.88\nYES\nNO\nYES\nNO\nSubmitted Bill\nSigned:\nDate: July 18, 2011\nApproved by: Emad\nSigned:\nDate:\nEmad\n7/26/11\nApproved by: Gary\nSigned:\nG\nDate: July 18, 2011\nApproved by:\nLOCAL CHECK, PLEASE\nSigned:\nDate:\nEFTA00621644\n", "char_count": 1076}, {"efta_number": "EFTA00621644", "page_number": 1, "text_content": "LSJ CONSTRUCTION\nProject Flagpole Pool #1013\nontractor - full legal name: Phillip Mark\nPhase # 09-200\nTrade: Plaster\nInvoice #: Requisition #1\nDate Revised:\nJuly 18, 2011\nInsurance expiration: 5/14/12\nPayment\nPartial\nInvoice/Req#\nDate C/O\nAmount\nRetainage\nDue\nFinal\nX\nPaid\nDate Paid Check#\nBalance\nContract\n07/11/11 Interior plaster\nCO#1\n07/13/11 Shade Structure\n11.212.12\n1.899.76\nCO#2\nCO#3\nCO#4\nCO#5\nRequisition #1\n07/17/11 Final\n13,111.88\n0.00\n13,111.88\nRequisition #2\n0.00\n0.00\nRequisition #3\n0.00\n0.00\nRequisition #4\n0.00\n0.00\nRequisition #5\n0.00\n0.00\nRequisition #6\n0.00\n0.00\n13,111.88\n0.00\n0.00\n0.00\n0.00\n0.00\nTotal\n13,111.88\n0.00\n13,111.88\n0.00\n13,111.88\nContract Amount - Phase\ncontract\nCistern Coatings\nCO#1\nShade Structure\n11.212.12\n1,899.76\nCO#2\nCO#3\nCO#4\nCO#5\nContracted To Date\nBalance of Contract w/Retainage\n13,111.88\n0.00\nEFTA00621645\n", "char_count": 852}, {"efta_number": "EFTA00621644", "page_number": 2, "text_content": "Cellular: (340) 998-3655\nPhone: (340) 777-5820\nPhillip Mark Sub-Contractor\nLICENSED\nGENERAL BUILDER⚫ CISTERN CLEANING ROOFS\nTILING PAINTING SWIMING POOLS FINISH WORK\n7.17.11\nHOSPITAL GROUND\nNo. 171\nST. THOMAS, U.S. V.I. 00802\nLittle 37 James I ShanD101003351 Mecha\nI Have Completed all the Interio\nWalls For the House, Including\nthe Ceiling. the Sq Ft FoR\" INterior\nWalls Including the ceiling is\n2,491.36. at #450 Per Sqft\nFOR Scratch and PlasteR.\nthe To Tal Rice FORE\n#11, 2 11.12\n#11/3\n09-200\nlithe\nECEIVE\nBy.\nJUN 18 2011\nFt\nEFTA00621646\n", "char_count": 541}, {"efta_number": "EFTA00621644", "page_number": 3, "text_content": "Phillip\n3535 sq\n7878\n24.54 se fl\n57 70\n84.86\n121x101\n12221\n250x250\n62500\n434.02\n89x84.\n7476\n51.9\n53x52\n2756\n19.1\n42x27\n3234\n22.45.\n53X26\n1378\n9.56\n100978\nin 701.13 sat\nft\nWalls.\n250 x 119 x4\n360 X 22 X 2 =\n101 x 39-\n826.38\n12.5\n27.35\n30x82-\n17.08\n101x119 =\n83.76\n70x119\n=\n57.84\n178x119x2 =\n294.19\n444x119 =\n366.91\n53x119 =\n43.79\n39x53=\n14.35\n52x119 =\n42.97\n6X82 =\n3.41\nWALLS.\nNt. Pool House Total.\nCeiling\n2,491.36\n4790.23\nsq ft\n701.13 sq.ft.\nAll AwAdam's\n11,211,12\nEFTA00621647\n", "char_count": 479}, {"efta_number": "EFTA00621644", "page_number": 4, "text_content": "Cellular: (340) 998-3655\nPhone: (340) 777-5820\nPhillip Mark Sub-Contractor\nLICENSED\nGENERAL BUILDER CISTERN CLEANING ROOFS\nTILING PAINTING SWIMING POOLS FINISH WORK\n7.18.11\nHOSPITAL GROUND\nNo. 171\nST. THOMAS, U.S. V.I. 00802\nLittle ST James I ShanD IN 100325\nI Have Completed all the\n• Plaster Work onthe\nProject near the Foag Pole\nIN CluDing the Fisher and\nthe Ceiling, the To Tal Salt\nis H 22, 17 sq ft at #450 Per\nsalt FOR Scratch and Plaster\nTO TOL #1,899.76\n#1413\n09-200\n기\nBy\nECEIVE\nUNIS 2011\nEFTA00621648\n", "char_count": 511}, {"efta_number": "EFTA00621644", "page_number": 5, "text_content": "11 PLASTER Phillip MARK\nPERGALA Flag Pole\nCirling\n296 X 149in\nFACIA\n59'x8\"\n24'10\" x 8\"\n13\n7-18-11\n366.29 sqft\n39.33 sqft\n16.55 sqft\nTOTAL\n422.17 sqft\nAll\n189477\nEFTA00621649\n", "char_count": 174}]}