{"efta_number": "EFTA00621616", "page_count": 14, "url": "https://epstein-data.com/EFTA00621616", "pdf_url": "https://epstein-data.com/pdf/EFTA00621616.pdf", "pages": [{"efta_number": "EFTA00621616", "page_number": 0, "text_content": "TSG\nMAKING EVERY DROP COUNT\nLittle St. James\nSWRO Plant Assessment and Operation and\nMaintenance Proposal\nPrepared for:\nLittle St. James\nPrepared by:\nMark Banzin, Deputy Director of Operations\nTSG Technologies\n2401 NE 18th Terrace, Suite B\nGainesville, FL 32609\nJune 29, 2017\nEFTA00621616\n", "char_count": 289}, {"efta_number": "EFTA00621616", "page_number": 1, "text_content": "TSG\nMAKING EVERY DROP COUNT\nTable of Contents\nPage 2 of 14\nLittle St. James......\n.1\nSWRO Plant Assessment and Operation and Maintenance Proposal....................1\nTable of Contents…........\n..2\nIntroduction.....\n3\nPlant Observations and Recommendations.....\n..3\nIntake Structure ...........\n.................3\nIntake Pumps..................\nPre-Filtration...............\n.................5\nEnergy Recovery Pressure Exchangers and Boost Pump..........\n.............\nHigh Pressure Pump and Motor.\n...............\n.......6\n.............7\nMembranes and Vessels...............\nEMPTY______________.....................................................8\nPost Treatment System..........\n................\n.9\nElectrical, Instrumentation and Controls.............. __________......................................9\nSummary......\nOperation and Maintenance....\nFull Responsibility .......\nWeekly Professional Services.\n12\n...........\n13\n......... 13\n............. 14\nEFTA00621617\n", "char_count": 970}, {"efta_number": "EFTA00621616", "page_number": 2, "text_content": "TSG\nMAKING EVERY DROP COUNT\nPage 3 of 14\nIntroduction\nOn June 20, 2017, TSG conducted an assessment of the present condition of the 90,000 gallon per day\n(gpd) SWRO plant on Little St. James. This plant was designed and installed by TSG in February 2011 and\nhas been operated by Owner's staff since that time. Previously, a 25,000 gpd plant was installed by TSG\nin 2007. The intake screen structure and piping were installed as a part of that original project to\naccommodate the needs of the larger future plant.\nThe following report outlines the observations and recommendations of each subsystem of the SWRO\nplant. We have included two options for operations and maintenance services toward the goal of\nensuring reliable, cost-effective service provided by TSG.\nPlant Observations and Recommendations\nIntake Structure\nObservations\nThe 8-inch diameter intake screen and check valve are located at the seaward end of the property's\ndock in about 10 feet of water. It is reported that the intake screen contains an abundance of marine\ngrowth. The excessive marine growth causes an increase in the suction pressure of the intake pumps,\nwhich in turn can create maintenance issues with the pump seals and makes it more difficult for the\npumps to hold prime during shutdown.\nRecommendations\n• A new intake screen should be procured and installed.\n• The old screen should be removed and cleaned with acid to remove imbedded marine growth.\nThe old screen can then be stored and rotated into service as the new screen becomes fouled.\nThis will allow a clean screen to be rotated into service quickly, with minimal disruptions to\nwater production.\n• The existing 8-inch check valve also needs to be cleaned with acid and reinstalled. Intake Pumps\nand Priming System\nEFTA00621618\n", "char_count": 1771}, {"efta_number": "EFTA00621616", "page_number": 3, "text_content": "TSG\nMAKING EVERY DROP COUNT\nIntake Pumps\nFigure 1: Intake Pumps\nPage 4 of 14\nObservations\nAs noted previously, this system was originally installed in 2007 and expanded in 2011 for the larger\nplant. The expansion consisted of installing new intake pumps, additional basket strainers, a new control\npanel, and repairs to the priming system. The priming system is vital to insuring that the intake pumps\nstart without cavitation, which causes damage to the impellers.\nDuring our visit, it was noted that only two of the four intake pumps were operational, intake pumps A\nand D. Intake pump B had a cracked basket strainer lid, and intake C pump had a cracked flange on the\nsuction side of the pump. Both of these pumps were started in hand and worked. The priming system\nwas also started in hand and worked. The staff reported that the priming pump is not used in normal\noperation because it takes too long to prime the system and they opt to flood the system with a garden\nhose. The intake control panel appears to be in good condition.\nRecommendations\n• Replace Pump B basket strainer lid.\n• Repair Pump C suction header and cracked flange.\nProvide shelf spare of priming pump and mechanical seals for intake pumps.\nEFTA00621619\n", "char_count": 1229}, {"efta_number": "EFTA00621616", "page_number": 4, "text_content": "TSG\nMAKING EVERY DROP COUNT\nPre-Filtration\nFigure 2: Media Filters\nPage 5 of 14\nObservations\nThe plant's pre-filtration system consists of three 48-inch diameter mixed media filter vessels that\nprovide removal of fine particulates from the raw seawater. These filters must be monitored and\nbackwashed manually on a regular basis - at least weekly, if the plant sees regular use. At the time of\nour visit, this system appeared to be well maintained and clean.\nThe cartridge filtration consists of one vertical vessel with twelve 40-inch long cartridge elements that\nfurther filter the raw seawater to 5 micron purity. This system appeared to be clean and well\nmaintained. A new Eden Excel cartridge filter housing was on site but not installed. The staff reported\nthat it was a replacement filter housing for the one installed since the installed filter has developed leaks\nin the past. During our visit no indications of leaking was observed on the filter housing.\nRecommendations\n•\nThe media filters should be backwashed on a regular basis, once a week. This will eliminate any\nchanneling that may occur in the filter bed.\nThe cartridge filters should be changed approximately every two to four weeks or when delta\npressure across them exceeds 5-8 psi.\nEFTA00621620\n", "char_count": 1267}, {"efta_number": "EFTA00621616", "page_number": 5, "text_content": "TSG\nMAKING EVERY DROP COUNT\nEnergy Recovery Pressure Exchangers and Boost Pump\nFigure 3: Pressure Exchanger\nnergy\ncovery\nPage 6 of 14\nFigure 4: Boost Pump\nObservations\nThe energy recovery system allows the pressure energy from the reject brine to be transferred directly\nto a portion of the incoming raw seawater. This allows the unit to utilize a smaller high pressure pump\nand therefore use less energy. This system's high and low pressure flows need to be carefully balanced\nfor correct operation of the pressure exchangers. The pressure exchangers depend on a continuous\nsupply of water for lubrication. The grove fitting on the low pressure discharge of Pressure Exchanger A\nappeared to be leaking. The Boost Pump mechanical seal showed signs of salt build up indicating need\nof replacement. Failure of this system will result in the plant not operating.\nRecommendations\n•\nRepair leaking PX.\n•\nReplace the mechanical seal on the boost pump.\nEFTA00621621\n", "char_count": 959}, {"efta_number": "EFTA00621616", "page_number": 6, "text_content": "TSG\nMAKING EVERY DROP COUNT\nPage 7 of 14\nHigh Pressure Pump and Motor\nObservations\nThe high pressure pump is the \"heart\" of any RO plant as it raises the seawater feed pressure to\napproximately 850 psi to allow membrane separation to occur and convert seawater to fresh water.\nThe system consists of a Wheatley 110Q-3L oil-filled positive displacement pump, driven by a 75 hp high\nefficiency motor.\nA new high pressure pump was procured by LSJ and recently installed by TSG. The pump procured was\nnot a direct replacement of the originally installed pump and the following issues should be noted.\n• The new pump material is Nickel Aluminum Bronze (NAB) vs the original Duplex Stainless Steel.\nIn our experience NAB pumps have a lower life cycle than Duplex SS. For this reason we\nexclusively specify stainless steel pumps in our designs.\nThe Gland Nuts, Throat Bushing, and Packings are also constructed of other than Stainless Steel\nand will degrade at an accelerated rate, potentially creating problematic maintenance and pump\nintegrity issues.\nThe replacement pump was of right hand drive orientation whereas the installed unit was of left\nhand drive. The new pump required significant field modification prior to installation because of\nthe improper drive orientation. This entailed the entire disassembly of the power end, flipping\nthe crankshaft 180 degrees, and the reassembly of the pump to precise tolerances prior to\nattempting the change out.\nDuring our plant evaluation it was further discovered that the plungers that were installed on the\nnewly procured pump were of incorrect size, 27/8 inch. The pump original specification called\nfor 2½ inch plungers. The larger plungers caused too much water to be produced which in turn\nover fluxed the membranes. The plungers from the old pump were removed, cleaned and\ninstalled into the new pump along with on the shelf spare packing assemblies.\nRecommendations\n•\nObtain a charging kit and nitrogen bottle for the Flow Guard high pressure disch\n... [truncated, 2313 chars — for the full page use /api/corpus/document/EFTA00621616/6 or ?id=EFTA00621616&page=6]", "char_count": 2313}, {"efta_number": "EFTA00621616", "page_number": 7, "text_content": "TSG\nMAKING EVERY DROP COUNT\nMembranes and Vessels\nPage 8 of 14\nFigure 5: Vessel Auto-Shims\nFigure 6: High Pressure Couplings\nObservations\nIt was reported that the lead membranes were replaced earlier this year. The current water quality\ncoming off the RO unit is acceptable. The analytical instruments need to be calibrated. There was a\nsignificant difference in the displayed conductivity values on both the HMI and controller versus a hand\nheld grab sample.\nThe installed auto shims are no longer supported by the vessel manufacturer ProTec. The manufacturer\nhighly recommends that these be replaced with \"dummy\" product ports. The auto shims could increase\nthe salt passage due to corrosion and faulty seals resulting in diminished water quality.\nThe high pressure Victaulic couplers and hardware show signs of extensive corrosion. A failure can\nresult in complete failure which can present a severe safety issue.\nRecommendations\n• Conduct regular membrane profiling and probing to detect future problems.\n• Replace corroded Victaulic style couplers and hardware.\n•\nReplace auto shims with dummy product ports.\n•\nClean membranes as needed using in place cleaning system.\n•\nCalibrate analytical instruments.\nEFTA00621623\n", "char_count": 1223}, {"efta_number": "EFTA00621616", "page_number": 8, "text_content": "TSG\nMAKING EVERY DROP COUNT\nPage 9 of 14\nPost Treatment System\nObservations\nThe RO permeate without post treatment is highly aggressive to plumbing systems and hot water\nheaters. TSG installed a post treatment system that consists of a single 48-inch diameter calcium\ncarbonate reactor and chemical injection pumps that provide hardness and alkalinity to the permeate to\nreduce the corrosive nature of RO water. Chlorine is also injected to provide a disinfectant. These\nsystems were found to be acceptable but daily testing using handheld instruments and test kits are\nneeded to establish that correct dosages are applied and that the finished water is acceptable.\nRecommendations\n•\nCalibrate analytical instruments.\nMaintain critical spares for injection pumps, rebuild kits, foot valves, and injectors\nElectrical, Instrumentation and Controls\nFigure 7: Control Panel\nSOLA\nSurge Suppressor\nSTV 25K Series\nLINE\nG\nN/L2\nL/LI\nLLI\nLOAD\nN/L2\nG\nFigure 8: Surge Suppressor\nSITOP\nEFTA00621624\n", "char_count": 986}, {"efta_number": "EFTA00621616", "page_number": 9, "text_content": "TSG\nMAKING EVERY DROP COUNT\nCOOOOOOD\nFigure 9: Power Panel\nFigure 10: Terminal Blocks\n619\n14\nPage 10 of 14\nObservations\nThere is evidence of salt water intrusion in both the main power panel and the main control panel as\nshown in Figures 7 through 10. Although it appears the system is operating correctly long term issues\nmost certainly will arise. Corrosion and salt residue will wick into the individual conductors which will\nresult in electrical issues and plant failure.\nRecommendations\n• Clean as much salt residue and corrosion as possible with contact cleaner\n•\n•\nReplace Sola Surge Suppressor immediately and closely monitor other components for possible\nfailure.\nMaintain critical spares of individual components.\nInstall a Tosibox system which will allow for remote monitoring of the plant and provide a\ngateway if any programming changes need to be made by offsite programmers.\nEFTA00621625\n", "char_count": 903}, {"efta_number": "EFTA00621616", "page_number": 10, "text_content": "TSG\nMAKING EVERY DROP COUNT\n-335\nPage 11 of 14\nFigure 11: HP Tubing Connector\nFigure 12: Pressure Transmitter\nObservations\nIt is imperative that accurate flow and pressure information is monitored, analyzed, and recorded daily.\nThis is the primary indication of the overall operation of the plant. All of the analytical pressure\ntransmitters and gauges were displaying faulty readings and the tubing connectors all showed signs of\ndegradation, corrosion, and leaks. This is causing the displayed values on both the dial gauges and\ntouchscreen to be inaccurate.\nThe local display on the flowmeters corresponded to those on the touchscreen with the exception of the\nboost pump flowmeter which displayed a 5 gallon per minute disparity. This disparity can be attributed\nto the meter's scaling and settings.\nThe conductivity indications on the controllers and HMI did not correspond and were totally different\nthan when tested against a handheld conductivity meter. There was no conductivity calibration solution\nto test the accuracy of the handheld meter.\nRecommendations\n• Replace all high and low pressure connectors and tubing.\n•\nAdjust flowmeter settings to bring both the local and remote displays closer together\n•\nCalibrate all analytical instrumentation with the proper calibration standards\n•\nVerify scaling of all instruments on touchscreen\nEFTA00621626\n", "char_count": 1361}, {"efta_number": "EFTA00621616", "page_number": 11, "text_content": "TSG\nMAKING EVERY DROP COUNT\nPage 12 of 14\nSummary\nThe Little St. James SWRO Plant is now approaching six years old. It is evident that the plant is kept in a\nclean and orderly state however the items discussed here are of critical nature and can potentially result\nin catastrophic failure causing significant down time, poor plant performance and water quality issues.\nThe high pressure couplers and high pressure tubing connectors are a major safety concern and should\nbe addressed immediately.\nMany of these reported items are easily overlooked by untrained operators who have the best\nintentions but lack the training, experience and resources.\nAdditionally, having expert knowledge of the system and its operation would alleviate issues such as the\nprocurement of the improper high pressure pump, which in the long run resulted in a much higher cost\nand shorter life cycle.\nLSJ has made a significant investment in their reverse osmosis system. To protect this investment and\nensure the longest life cycle and long term performance, we highly recommend that the plant be\noperated and maintained on a regular basis by RO water treatment professionals that have the training\nand experience to address the issues that may not be observed by an untrained eye.\nThe subsequent sections outline the two service options that we have tailored specifically for Little St.\nJames.\nEFTA00621627\n", "char_count": 1386}, {"efta_number": "EFTA00621616", "page_number": 12, "text_content": "TSG\nMAKING EVERY DROP COUNT\nPage 13 of 14\nOperation and Maintenance\nFull Responsibility\nTSG proposes to accept full responsibility for the operation and maintenance of the plant for the long\nterm, including all consumables, replacements and repairs, with the exception of the replacement costs\nof the control panels and/or components and membranes.\nTSG has a stringent routine and preventive maintenance schedule that ensures reliability and extends\nthe service life of equipment. We guaranty a 90% water production factor for desalination plants. We\nalso guarantee water quality during the term of the agreement.\nTSG's contracts typically provide for a monthly fixed fee and a production fee. The fixed fee is paid to\ncover all TSG's fixed costs, such as labor, general and administrative expenses, insurance, tools, testing\nequipment and vehicles. The production fee compensates TSG for those items whose costs vary with\nthe operation of the plant, primarily consumables and parts. Under this arrangement, TSG maintains on\nsite and at its cost a complement of spare parts that are necessary to keep the plants on line.\nLabor\nComponent\nConsumables-Water Treatment\nCartridge Filters\nPreventive Maintenance/Repair and Replacement\nGeneral Expenses and Outside Support\nFixed Cost Water Variable Cost $US/1,000 gal\n$9,143\n$1.36\n$0.06\n$1.23\n$2,611\n$11,754\n$2.65\nTotals\nUnit cost at 90% on line factor- US$/1,000 gals\n$7.42\nNOTES:\n1. Shipping for all parts, equipment, chemicals and consumables is FOB to a port of Owner's choice in FL.\n3. Underwater or underground piping is not included, includes I yearly intake screen cleaning.\n2.\nRO membranes are not included.\n4.\nCosts do not include power.\nEFTA00621628\n", "char_count": 1704}, {"efta_number": "EFTA00621616", "page_number": 13, "text_content": "TSG\nMAKING EVERY DROP COUNT\nPage 14 of 14\nWeekly Professional Services\nThe services being proposed consist of TSG providing weekly professional services to supplement your\nown operations staff. Since this is more of a supervisory and consulting role, the actual day to day\nmaintenance of the plant is done by the owners own staff.\nThe weekly assessment visits will consist of a one day visit on site to inspect and assess the plant's\noperation and condition, review operating data as well as the status of the inventory. For this type of\nservice to be successful, it is imperative that the owner's staff perform the recommended maintenance\nprotocols prior to the next weekly visit.\nTSG cannot be held responsible for maintenance items that were not performed. Since TSG has limited\ncontrol of the daily operation of the plant, these services do not include or guarantee any online factor,\nwater quality, parts, consumables, or additional labor required for maintenance.\nItem\n1 Weekly Professional Services\nDescription\nPrice (US$)\n$5,200/month\nIf additional services are required, the prices for additional services requested by Owner will be as follows:\nItem\nDescription\n1\nVisits that are scheduled more than a week in advance\nPrice (US$)\n$1,500/day\n2\nVisits that are not scheduled or less than 48 hours' notice\n$2,000/day\nEFTA00621629\n", "char_count": 1336}]}