{"efta_number": "EFTA00616397", "page_count": 1, "url": "https://epstein-data.com/EFTA00616397", "pdf_url": "https://epstein-data.com/pdf/EFTA00616397.pdf", "pages": [{"efta_number": "EFTA00616397", "page_number": 0, "text_content": "Subbase Drydock\nParcel #162, Subbase\nSt Thomas USVI 00803\nT\nF\nEstimate\nName / Address\nSteve Rampino/Sun Bowt Ocean Services\nDate\nEstimate #\n6/13/2007\n118\nContact\nтайё\n#500 Deposit\nDescription\nDrydock Haul Out: 70' (reserved for Thursday,\nJuly 5th 2007 through Wednesday, July 11th,\n2007.)\nRoundTrip\nLaydays Dook ang 1ST - ang 4th\nTerms\nProposal\nProject\nBertha Landing C...\nTotal\nQty\nCost\n70\n70\n21.00\n1,470.00\nPressure wash bottom, scrape and sand off marine\n250.00\n1,000.00\n1\n5,300.00\n5,300.00\ngrowth, apply two coats of primer over entire\nbottom, paint two coats of bottom paint with a\nthird coat at the water line. LABOR:\nMaterials: includes epoxy 235 primer, bottom paint,\nand all miscellaneous materials.**\n1\n4,100.00\n4,100.00\n**Does not include zincs.\n**Steve, usually we require a $500 deposit to\nreserve your drydock date, but because you are\nvalued customer, we are waiving the deposit.\nHowever, if for any reason you decide to cancel\nyour drydock haul out, please contact me as soon\nas possible. Thank you!\nSignature\nTotal\n9\n$11,870.00\nEFTA00616397\n", "char_count": 1058}]}