{"efta_number": "EFTA00613672", "page_count": 14, "url": "https://epstein-data.com/EFTA00613672", "pdf_url": "https://epstein-data.com/pdf/EFTA00613672.pdf", "pages": [{"efta_number": "EFTA00613672", "page_number": 0, "text_content": "AGREEMENT BETWEEN\nOWNER AND WALLACE E. CUNNINGHAM, INC.\nAGREEMENT\nmade as of the 2nd day of February in the year of Two Thousand and 15.\nBETWEEN the Owner:\nJeffrey Epstein\nand Wallace E. Cunningham Inc. (WCI):\n1111 West Arbor Drive\nSan Diego, CA 92103\nFor the following Project:\nScope of project to be determined.\nThe Owner and WCI agree as set forth below.\nTERMS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND WCI\nARTICLE 1\nWCI RESPONSIBILITIES\n1.1\nWCI'S SERVICES\n1.1.1 WCI's services consist of those services performed by WCI, WCI's employees and WCI's\nconsultants as enumerated in Articles 2 and 3 of this Agreement and any other services included in\nArticle 12. Wallace Cunningham shall be the project designer and shall perform the services\nenumerated in Article 2.2. Guy West shall be the architect of record and shall oversee WCI's services\nas enumerated in Articles 2 and 3.\n1.1.2 WCI's services shall be performed as expeditiously as is consistent with professional skill and\ncare and the orderly progress of the Work.\nWALLACE E.\n1111 Wee\nEmail:\nCUNNINGHAM,\nINC.\nUSA 2103\nPhone:\nFax:\nWebsite: w w\nWallace Cunnin ham.com\n1\nEFTA00613672\n", "char_count": 1144}, {"efta_number": "EFTA00613672", "page_number": 1, "text_content": "1.1.3 The services covered by the Agreement are subject to the time limitations contained in\nSubparagraph 11.5.1.\nARTICLE 2\nSCOPE OF WCI'S BASIC SERVICES\n2.1\nDEFINITION\n2.1.1 WCI's Basic Services consist of those described under the three phases identified below, and\nany other services identified in Article 12.\n2.2\nDESIGN PHASE\n2.2.1 WCI shall review with the Owner alternative approaches to design and construction of the\nProject.\n2.2.2 Based on the mutually agreed upon program, schedule and construction budget requirements,\nWCI shall prepare, for approval by the Owner, Design Documents consisting of drawings and other\ndocuments appropriate for the Project. See Exhibit 'A' for specific scope of work.\n2.3\nCONSTRUCTION DOCUMENTS PHASE\n2.3.1 Based on the approved Design Documents, WCI shall prepare, for approval by the Owner,\nConstruction Documents consisting of Drawings and Specifications setting forth in detail the\nrequirements for the construction of the Project.\n2.3.2 WCI shall assist the Owner in connection with the Owner's responsibility for filing documents\nrequired for the approval of governmental authorities having jurisdiction over the Project.\n2.3.3 Unless provided in Article 12, WCI, following the Owner's approval of the Construction\nDocuments, shall assist the Owner in obtaining bids or negotiated proposals and assist in awarding and\npreparing contracts for construction.\n2.4\nCONSTRUCTION PHASE\n2.4.1 WCI's responsibility to provide Basic Services for the Construction Phase under this Agreement\ncommences with the award of the Contract for Construction and terminates at the earlier of issuance to\nthe Owner of the final Certificate for Payment or 60 days after the date of Substantial Completion of the\nWork.\n2.4.2 WCI shall provide administration of the Contract for Construction as set forth below and\ndescribed in Exhibit 'A,' current as of the date of this Agreement.\nWALLACE\nE.\nCUNNINGHAM, INC.\n2\n1111 West Arbor Drive San Diego California USA 92103\nEmail:\nPhone\n... [truncated, 2056 chars — for the full page use /api/corpus/document/EFTA00613672/1 or ?id=EFTA00613672&page=1]", "char_count": 2056}, {"efta_number": "EFTA00613672", "page_number": 2, "text_content": "2.4.3 Duties, responsibilities and limitations of authority of WCI shall not be restricted, modified or\nextended without written agreement of the Owner and WCI with consent of the Contractor, which\nconsent shall not be unreasonably withheld.\n2.4.4 WCI shall be a representative of and shall advise and consult with the Owner (1) during\nconstruction until final payment to the Contractor is due and (2) as an Additional Service at the Owner's\ndirection from time to time during the correction period described in the Contract for Construction.\n2.4.5 WCI shall visit the site on a regular basis and as required to become generally familiar with the\nprogress and quality of the Work completed and to determine in general if the Work is being performed\nin accordance with the Contract Documents. However, WCI shall not be required to make exhaustive\nor continuous on-site inspections to check the quality or quantity of the Work. On the basis of on-site\nobservations, WCI shall keep the Owner informed of the progress and quality of the Work, and shall\nendeavor to guard the Owner against defects and deficiencies in the Work. The Owner may agree to\nmore extensive site representation with WCI as Additional Services described in Paragraph 3.2.\n2.4.6 WCI shall not have control over or charge of and shall not be responsible for construction\nmeans, methods, techniques, sequences or procedures, or for safety precautions and programs in\nconnection with the Work, since these are solely the Contractor's responsibility under the Contract for\nConstruction. WCI shall not be responsible for the Contractor's schedules or failure to carry out the\nWork in accordance with the Contract Documents. WCI shall not have control over or charge of acts or\nomissions of the Contractor, Subcontractors, or their agents or employees, or of any other persons\nperforming portions of the Work.\n2.4.7 WCI shall at all times have access to the Work wherever it is in preparation or progress.\n2.4.8 Based on WCI's observation\n... [truncated, 3561 chars — for the full page use /api/corpus/document/EFTA00613672/2 or ?id=EFTA00613672&page=2]", "char_count": 3561}, {"efta_number": "EFTA00613672", "page_number": 3, "text_content": "2.4.11 WCI shall review and approve or take other appropriate action upon Contractor's submittals\nsuch as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for\nconformance with information given and the design concept expressed in the Contract Documents.\nWCI's action shall be taken with such reasonable promptness as to cause no delay. WCI's approval of\na specific item shall not indicate approval of an assembly of which the item is a component.\n2.4.12 Contractor shall prepare a schedule of submittals for review prior to start of construction. All\nsubmittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This\nrequirement shall be made a part of the General Conditions of the Contract for Construction.\n2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting\ndocumentation and data, if authorized or confirmed in writing by the Owner. WCI may authorize minor\nchanges in the Work not involving an adjustment in the Contract Sum or an extension of the Contract\nTime which are not inconsistent with the intention of the Contract Documents.\n2.4.14 WCI shall conduct inspections to determine the dates of Substantial Completion and final\ncompletion and shall issue a final Certificate of Payment.\n2.4.15 WCI shall interpret and decide matters concerning performance of the Owner and Contractor\nunder the requirements of the Contract Documents upon written request of either the Owner or\nContractor. WCI's response to such requests shall be made with reasonable promptness and within\nany time limits agreed upon. When making such interpretations and initial decision, WCI shall\nendeavor to secure faithful performance by both Owner and Contractor, shall not show partiality to\neither, and shall not be liable for results of interpretations or decisions so rendered in good faith.\nARTICLE 3\nADDITIONAL SERVICES\n3.1 Additional Services shall be provided if authorized and confirmed in writing by the Owne\n... [truncated, 3274 chars — for the full page use /api/corpus/document/EFTA00613672/3 or ?id=EFTA00613672&page=3]", "char_count": 3274}, {"efta_number": "EFTA00613672", "page_number": 4, "text_content": "evaluate Contractor's proposals, and provide any other services made necessary by such Change\nOrders and Construction Change Directives. Additional services shall be authorized per Article 3.1 and\ncompensated per Article 11.3.\n4.1\nARTICLE 4\nOWNER'S RESPONSIBILITIES\nThe Owner shall provide full information, including a program, which shall set forth the Owner's\nobjectives, schedule, constraints, budget with reasonable contingencies, and criteria.\n4.2 The Owner shall furnish surveys describing physical characteristics, legal limitations, and utility\nlocations for the site of the Project, a written legal description of the site and the services of\nGeotechnical Engineers or other consultants when such services are requested by WCI and agreed to\nby the Owner.\n4.3\nThe Owner shall furnish structural, mechanical, chemical, air and water pollution tests, tests for\nhazardous materials, and other laboratory and environmental tests, various inspections and reports\nrequired by law or the Contract Documents.\n4.4 The Owner shall furnish all legal, accounting and insurance counseling services as may be\nnecessary at any time for the Project, including auditing services the Owner may require to verify the\nContractor's Applications for Payment or to ascertain how or for what purposes the Contractor has used\nthe money paid by the Owner.\n4.5\nThe foregoing services, information, surveys and reports shall be furnished at the Owner's\nexpense, and WCI shall be entitled to rely upon the accuracy and completeness thereof.\n4.6 Prompt written notice shall be given by the Owner to WCI if the Owner becomes aware of any\nfault or defect in the Project or nonconformance with the Contract Documents.\n4.7\nThe proposed text of certificates or certifications requested of WCI or the Owner's consultants\nshall be submitted to WCI for review and approval at least fourteen (14) days prior to execution.\nARTICLE 5\nCONSTRUCTION COST\n5.1\n5.1.1\nDEFINITION\nThe Construction Cost shall be the total cost or estimated \n... [truncated, 2234 chars — for the full page use /api/corpus/document/EFTA00613672/4 or ?id=EFTA00613672&page=4]", "char_count": 2234}, {"efta_number": "EFTA00613672", "page_number": 5, "text_content": "5.1.2 The Construction Cost shall include the cost at current market rates of labor and materials\nfurnished by the Owner and equipment designed, specified, selected or specially provided for by WCI,\nplus a reasonable allowance for the Contractor's overhead and profit. In addition, a reasonable\nallowance for contingencies shall be included for market conditions at the time of bidding and for\nchanges in the Work during construction.\n5.1.3 Construction Cost does not include the compensation of WCI and the Owner's consultants, the\ncosts of the land, rights-of-way, financing or other costs that are the responsibility of the Owner as\nprovided in Article 4.\n5.2\nRESPONSIBILITY FOR CONSTRUCTION COST\n5.2.1 It is recognized that neither WCI nor the Owner has control over the cost of labor, materials or\nequipment, over the Contractor's methods of determining bid prices, or over competitive bidding market\nor negotiating conditions. Accordingly, WCI cannot and does not warrant or represent that bids or\nnegotiated prices will not vary from any estimate of Construction Cost or evaluation prepared or agreed\nto by WCI.\n5.2.2 No fixed limit of Construction Cost shall be established as a condition of this Agreement by the\nfurnishing, proposal or establishment of a project budget, unless a fixed limit has been agreed upon in\nwriting and signed by the parties hereto. WCI shall endeavor to design a project that meets the\nOwner's programmatic requirements and meets the Owner's budget for the Construction Cost. Fixed\nlimits, if any, shall be increased in the amount of an increase in the Contract Sum occurring after\nexecution of the Contract for Construction.\n6.1\nARTICLE 6\nUSE OF WCI'S DRAWINGS,\nSPECIFICATIONS AND OTHER DOCUMENTS\nThe Drawings, Specifications and other documents prepared by WCI for this Project are\ninstruments of WCI's service for use solely with respect to this Project, and WCI shall be deemed the\nauthor of these documents and shall retain all common law, statutory and other\n... [truncated, 3012 chars — for the full page use /api/corpus/document/EFTA00613672/5 or ?id=EFTA00613672&page=5]", "char_count": 3012}, {"efta_number": "EFTA00613672", "page_number": 6, "text_content": "7.1\nARTICLE 7\nDISPUTE RESOLUTION\nClaims, disputes or other matters in question between the parties to this Agreement arising out\nof or relating to this Agreement or breach thereof shall be subject to mediation. Such mediation, unless\nthe parties agree otherwise, shall be in accordance with the Construction Industry Mediation Rules of\nthe American Arbitration Association currently in effect. The parties shall share the mediator's fee and\nany filing fees equally. The mediation shall be held in the place where the project is located.\nAgreements reached in the mediation shall be enforceable as settlement agreements in any court\nhaving jurisdiction thereof.\n8.1\nARTICLE 8\nTERMINATION, SUSPENSION\nOR ABANDONMENT\nThis agreement may be terminated by either party upon not less than seven (7) days' written\nnotice should the other party fail substantially to perform in accordance with the terms of this\nAgreement through no fault of the party initiating the termination.\n8.2 If the Project is suspended by the Owner for more than thirty (30) consecutive days, WCI shall\nbe compensated for services performed prior to notice of such suspension. When the Project is\nresumed, WCI's compensation shall be equitably adjusted to provide for expenses incurred in the\ninterruption and resumption of WCI's services.\n8.3\nThis Agreement may be terminated by the Owner upon not less than seven (7) days' written\nnotice to WCI in the event that the Project is permanently abandoned. If the Project is abandoned by\nthe Owner for more than ninety (90) consecutive days, WCI may terminate this Agreement by giving\nwritten notice. In the event of permanent abandonment, WCI shall be compensated for services\nperformed prior to termination, together with Reimbursable Expenses then due.\n8.4 Failure of the Owner to make payments to WCI in accordance with this Agreement shall be\nconsidered substantial nonperformance and cause for termination.\n8.5 If the Owner fails to make payment when due to WCI for services and ex\n... [truncated, 2572 chars — for the full page use /api/corpus/document/EFTA00613672/6 or ?id=EFTA00613672&page=6]", "char_count": 2572}, {"efta_number": "EFTA00613672", "page_number": 7, "text_content": "8.6 In the event of termination not the fault of WCI, WCI shall be compensated for services\nperformed prior to termination, together with Reimbursable Expenses then due.\nARTICLE 9\nMISCELLANEOUS PROVISIONS\n9.1 Unless otherwise provided, this Agreement shall be governed by the laws of St. Thomas, British\nVirgin Islands.\n9.2\nCauses of action between the parties to this Agreement pertaining to acts or failures to act shall\nbe deemed to have accrued and the applicable statute of limitations shall commence to run no later\nthan either the date of Substantial Completion for acts or failures to act occurring prior to Substantial\nCompletion, or the date of issuance of the final Certificate for Payment for acts or failures to act\noccurring after Substantial Completion.\n9.3\nThe Owner and WCI waive all rights against each other and against the contractors,\nconsultants, agents and employees of the other for damages, but only to the extent covered by property\ninsurance during construction. The Owner and WCI each shall require similar waivers from their\ncontractors, consultants and agents.\n9.4 The Owner and WCI, respectively, bind themselves, their partners, successors, assigns and\nlegal representatives to the other party to this Agreement and to the partners, successors, assigns and\nlegal representatives of such other party with respect to all covenants of this Agreement. Neither\nOwner nor WCI shall assign this Agreement without the written consent of the other.\n9.5\nThis Agreement represents the entire and integrated agreement between the Owner and WCI\nand supersedes all prior negotiations, representations or agreements, either written or oral. This\nAgreement may be amended only by written instrument signed by both Owner and WCI.\n9.6 In recognition of the relative risks and benefits of the Project to both the Owner and WCI, the\nrisks have been allocated such that the Owner agrees, to the fullest extent permitted by law, to limit the\nliability of WCI to the Owner for any and all cl\n... [truncated, 3062 chars — for the full page use /api/corpus/document/EFTA00613672/7 or ?id=EFTA00613672&page=7]", "char_count": 3062}, {"efta_number": "EFTA00613672", "page_number": 8, "text_content": "contained herein, the Owner agrees that as the Owner's sole and exclusive remedy, any claim,\ndemand, or suit shall be directed and/or asserted only against WCI, a California corporation, and not\nagainst any of WCI's individual employees, officers, or directors.\n9.9 WCI and WCI's consultants shall have no responsibility for the discovery, presence, handling,\nremoval or disposal of or exposure of persons to hazardous materials in any form at the Project site,\nincluding, but not limited to, asbestos, asbestos products, polychlorinated biphenyl (PCB) or other toxic\nsubstances.\n9.10 WCI shall retain the right to photograph the Project for a minimum period of one (1) year after\nconstruction is complete and publish any part or the entire Project in perpetuity.\n10.1 DIRECT PERSONNEL EXPENSE\nARTICLE 10\nPAYMENTS TO WCI\n10.1.1 Direct Personnel Expense is defined as the direct salaries of WCI's personnel engaged on the\nProject and the portion of the cost of their mandatory and customary contributions and benefits related\nthereto, such as employment taxes and other statutory employee benefits, insurance, sick leave,\nholidays, vacations, pensions and similar contributions and benefits.\n10.2 REIMBURSABLE EXPENSES\n10.2.1 Reimbursable Expenses include expenses incurred by WCI in the interest of the Project for:\n1.\n12\nExpense of regional transportation in service of the Project;\n2. Expense of transportation and living expenses in connection with out-of-town travel; air\ntransportation shall be business class service or better;\n3.\n4.\n34567\n6.\n7.\n8.\n9.\nLong-distance communications;\nFees paid for securing approval of authorities having jurisdiction over the Project;\nReproductions, including electronic plotting services;\nPostage and handling of Design Drawings and Outline Specifications;\nExpense of overtime work requiring higher than regular rates, if authorized by the\nOwner;\nProfessional quality renderings and models requested by the Owner;\nExpenses of computer-aided modeling and animate\n... [truncated, 2305 chars — for the full page use /api/corpus/document/EFTA00613672/8 or ?id=EFTA00613672&page=8]", "char_count": 2305}, {"efta_number": "EFTA00613672", "page_number": 9, "text_content": "10.3.2 Subsequent payments for Basic Services shall be made monthly and, where applicable, shall be\nin proportion to services performed within each phase of service.\n10.3.3 If and to the extent that the time initially established in Subparagraph 11.5.1 of this Agreement is\nexceeded or extended through no fault of WCI, compensation for any services rendered during the\nadditional period of time shall be computed in the manner set forth in Subparagraph 11.3.2.\n10.3.4 When compensation is based on a percentage of Construction Cost and any portions of the\nProject are deleted or otherwise not constructed, compensation for those portions of the Project shall\nbe payable to the extent services are performed on those portions, in accordance with the schedule set\nforth in Subparagraph 11.2.2, based on (1) the lowest bona fide bid or negotiated proposal, or (2) if no\nsuch bid or proposal is received, the most recent preliminary estimate of Construction Cost or detailed\nestimate of Construction Cost for such portions of the Project.\n10.4 PAYMENT ON ACCOUNT OF ADDITIONAL SERVICES AND REIMBURSABLE EXPENSES\n10.4.1 Payments on account of WCI's Additional Services and for Reimbursable Expenses shall be\nmade monthly upon presentation of WCI's statement of services rendered or expenses incurred.\n10.5 PAYMENTS WITHHELD\n10.5.1 No deductions shall be made from WCI's compensation on account of sums withheld from\npayments to contractors.\nARTICLE 11\nBASIS OF COMPENSATION\nThe Owner shall compensate WCI as follows:\n11.1 AN INITAL PAYMENT OF Fifteen Thousand Dollars ($15,000) shall be made upon execution of\nthis Agreement and shall be the minimum payment under this Agreement.\n11.2 BASIC COMPENSATION\n11.2.1 FOR BASIC SERVICES, as described in Article 2, and any other services included in Article 12\nas part of Basic Services, Basic Compensation shall be computed as follows:\nCompensation to WCI shall be on a Lump Sum basis. Monthly services shall be billed on\na percentage of completion basis. Lump\n... [truncated, 2202 chars — for the full page use /api/corpus/document/EFTA00613672/9 or ?id=EFTA00613672&page=9]", "char_count": 2202}, {"efta_number": "EFTA00613672", "page_number": 10, "text_content": "11.2.2 Progress payments for Basic Services in each phase shall total the following percentages of the\ntotal Basic Compensation payable:\nSchematic Design Phase:\nDesign Development Phase:\nConstruction Documents Phase:\nBidding/Negotiation Phase:\nSite Observation Phase:\nTotal Basic Compensation\ntwenty percent\nthirty percent\nthirty percent\n(20%)\n(20%)\n(40%)\n(05%)\nfifteen percent\n(15%)\none hundred percent\n(100%)\nfive percent\n11.3 COMPENSATION FOR ADDITIONAL SERVICES\n11.3.1 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES, as described in Article 3,\ncompensation shall be computed as follows:\nAdditional Services shall be billed on an hourly basis at the following fixed rates:\nDesign Principal\n$225.00\nProject Manager\n$150.00\nProject Architect\n$125.00\nDraftsman\nClerical\n$ 85.00\n$ 50.00\n11.3.2 FOR ADDITIONAL SERVICES OF WCI provided under Article 3 or identified in Article 12,\ncompensation shall be computed as follows:\nAdditional Services shall be billed on an hourly basis at the following fixed rates:\nDesign Principal\n$225.00\nProject Manager\n$150.00\nProject Architect\n$125.00\nDraftsman\n$ 85.00\nClerical\n$ 50.00\n11.4\nREIMBURSABLE EXPENSES\n11.4.1 REIMBURSABLE EXPENSES, as described in Paragraph 10.2, and any other items included in\nArticle 12, incurred by WCI, WCI's employees and consultants in the interest of the Project shall be\nbilled at one.two times direct cost.\nWALLACE E.\n1111 We\nEmail:\nCUNNINGHAM, INC.\nUS2103\nWebsite:\n11\nPhone:\nFax:\nWallace Cunningham.com\nEFTA00613682\n", "char_count": 1487}, {"efta_number": "EFTA00613672", "page_number": 11, "text_content": "11.5 ADDITIONAL PROVISIONS\n11.5.1 IF THE BASIC SERVICES covered by this Agreement have not been completed within thirty-\nsix (36) months of the date hereof, through no fault of WCI, extension of WCI's services beyond that\ntime shall be compensated as provided in Subparagraphs 10.3.3 and 11.3.2.\n11.5.2 Payments are due and payable upon receipt of WCI's invoice. Amounts due thirty (30) days\nafter the invoice date shall bear interest at the rate entered below, or in the absence thereof at the legal\nrate prevailing from time-to-time at the principal place of business of WCI.\n11.5.3 The rates and multiples set forth for Additional Services shall be annually adjusted in\naccordance with normal salary review practices of WCI.\nARTICLE 12\nOTHER CONDITIONS OR SERVICES\n12.1 The Owner shall be responsible for entering into a separate contract for services with, but not\nlimited to, the following consultants; Geotechnical Engineer, Land Surveyor, Civil Engineer, Structural\nEngineer, Mechanical and Plumbing Consultants, Electrical Consultant, Energy Consultant, Lighting\nConsultant, Environmental Consultant, and all others deemed necessary per Article 4. Refer to Exhibit\n'B' for an outline of Primary and Secondary design consultants.\n12.2 The Owner shall be responsible for all costs related to fees, licenses and permits as required by\nany regulatory agency having jurisdiction over any portion or phase of the project.\n12.3 WCI shall provide coordination of their work with the work of all consultants outlined in\nSubparagraph 12.1.\nThis Agreement entered into as of the day and year first written above.\nOWNER\nJeffrey Epstein\nWCI\nGuy West, Vice President\nWALLACE E. CUNNINGHAM, INC.\n12\n1111 West Arbor Drive Sen Diego California USA 92103 Phone:\nEmail:\nFax:\nWebsite:\nwww.Wallace Cunningham.com\nEFTA00613683\n", "char_count": 1813}, {"efta_number": "EFTA00613672", "page_number": 12, "text_content": "PRE-DESIGN SERVICES\nEXHIBIT 'A'\nSCOPE OF SERVICES OUTLINE\nProgramming with Owner\nProject Data Sheet/Code Analysis\n• Space Schematics/Flow Diagrams\nSITE DEVELOPMENT SERVICES\nSite plan of property including any future development\nCoordination with Geotechnical, Civil, Landscape, and Environmental Consultants\nDESIGN SERVICES\nDesign Drawings\nSite Plan as required for new improvements only\nFloor Plan(s)\nRoof Plan(s)\nBuilding Sections\nExterior Elevations\nFinish Material Investigation\nDesign Study Model\nCONSTRUCTION DOCUMENT PHASE\nSee note below.\nConstruction Documents as required to secure a combination building permit\nMaterials Specifications\nCoordination with Primary and Secondary design consultants\nCONSTRUCTION ADMINISTRATION SERVICES\nProject Administration\nPeriodic Site Observation Visits\n• Supplemental Design Documentation\nNOTE: Presentation wood models of the final design to be considered part of Additional Services.\nWALLACE\nE.\nCUNNINGHAM, INC.\n1111 West Arbor Drive, San Diego, California, USA 92103 Phone:\nEmail:\nFax:\nWebsite:\nwww.Wallace Cun\n13\nEFTA00613684\n", "char_count": 1075}, {"efta_number": "EFTA00613672", "page_number": 13, "text_content": "EXHIBIT 'B'\nPRIMARY DESIGN CONSULTANTS\nLand Surveyor\nGeotechnical Engineer\nCivil Engineer\nStructural Engineer\nMechanical / Plumbing Consultant\nElectrical Consultant\nInterior Designer\nLandscape Designer\nEnergy Consultant\nEnvironmental Consultant\nLighting Designer\nLow Voltage Consultant\nSecurity Consultant\nSECONDARY DESIGN CONSULTANTS\nAudio/Visual Consultant\n•\nComputer/Data\n14\nWALLACE E.\nCUNNINGHAM, , INC.\n1111 West Arbor Drive, San Diego California, USA 92103 Phone:\nEmail:\nFax:\nWebsite: www.Wallace Cunningham.com\nEFTA00613685\n", "char_count": 531}]}