{"efta_number": "EFTA00613630", "page_count": 1, "url": "https://epstein-data.com/EFTA00613630", "pdf_url": "https://epstein-data.com/pdf/EFTA00613630.pdf", "pages": [{"efta_number": "EFTA00613630", "page_number": 0, "text_content": "Date: 5/26/2015\nProposal Submitted to:\nMr. Jeffery Epstein\nEl Brillo Way\nPalm Beach, Florida\nLabonte\nConstruction Services, LLC\n4165 Linden Ave.\nPalm Beach Gardens, Fl.33410\n(561)603-9446\nPROPOSAL\nSTAFF HOUSE\nDescription\nCGC1514471\nProposal #15-173\nExtension\nPAINTING: Sand, prep and paint all interior walls and ceiling with 2 coats of Benjamin Moore paint. Sand and\npaint all doors and trim with 2 coats of acrylic satin paint. Sand and stain the existing wood floor area under $\nthe office desk. (refinishing of entire office wood floor not included)\nGUEST BATHROOM: Repair the water damaged drywall behind the Guest bathroom #1 toilet, Replace the\nguest bathroom water damaged vanity cabinet (counter top and faucet to remain) supply a new glass bypass $\nshower door.\nLAUNDRY ROOM: Remove existing waterheater, laundry equipment and deteriorated floor tile, rebuild the\nwaterheater pedistal with new 3/4 inch painted plywood. Float and level laundry room floor, supply and install\nnew 12 x 12 white/grey fleck vinyl VCT flooring with moisture inhibitor glue. (excessive floor leveling or\nsubfloor repairs at additional fee)\nReplace laundry room faucets (2) Reinstall\n13,950.00\n2,975.00\n6,195.00\nthe existing water heater on the new closet pedistal.\nAIR CONDITIONING: Replace all existing HVAC supply/return grills (21) and exhaust fans (3) in all\n$\n1,850.00\nrooms.\nTOTAL\nSUBTOTAL $\n24,970.00\nLabonte Construction Overhead and Profit 18%\n$\n4,494.60\n$\n29,464.60\nExclusions: All unforseen rotted wall and floor framing and rough plumbing, window treatment and furniture removal or\nreinstallaiton, appliances, HVAC equipment and systems, water heater, additional drywall repairs.\n\"This Contract\" by and between Labonte Construction Services LLC and property Owner Mr. Jeffery Epstein become effective as\nof date of owners signature on this proposal. Owner agrees to payment terms below per the scope of work identified on the work\ndescription. Starting on the Commencement Date of\nand within thirty (30) days of permit issuance and readiness\nof the jobsite. Labonte Construction Services LLC agrees to provide the labor and materials per the description listed above. All\nadditional or changes in work by owner, architect or building dept is to be implimented per an owner approved change order plus\n15% over cost.\nPay schedule:\n50% due at contract signing for scheduling and material order.\n40% of contract amount due at painting completion\nRemaining 10% of contract at completion.\nAcceptance of Proposal\nOwner:\nThis proposal is valid for 30 days.\nDate\nEFTA00613630\n", "char_count": 2567}]}