{"efta_number": "EFTA00612596", "page_count": 8, "url": "https://epstein-data.com/EFTA00612596", "pdf_url": "https://epstein-data.com/pdf/EFTA00612596.pdf", "pages": [{"efta_number": "EFTA00612596", "page_number": 0, "text_content": "LSJ Projects\nEstimated Cost\nEB\nANC\nRO Shed\n$205,705.00\n121,440.00\nUpdated KG.\nEngineering Shed\n$327,800.00\n268,180.00\n3/9/17\nRO Refurbishment\n$\n60,693.00\nSwitch Gear Refurbishment\n$\n18,500.00\nTunnel Lights\nLights x 40\nLabor\n555\nAwning\n$\n2,621.13\n$\n4,400.00\nS\n7,021.13\n$\n38,130.00\nChilax Window\nFlashing Great Room\nLittle C Refurbishment\nPaint\nHaul Out\nHardware\nBench Seat\nWater Taxi\nTotal\nTBA\nIncluded in Cottage Bid\n5555\n$\n16,500.00\n1,935.00\n$\n$\n$\n19,435.00\nEFTA00612596\n", "char_count": 472}, {"efta_number": "EFTA00612596", "page_number": 1, "text_content": "Install Variable Speed Drives Main\nDistribution Pumps\nTBA\nLow Level Cut Offs Main Distribution\nPumps\nPool Filters\nTBA\n$\n2,446.95\nLSJ Projects\nStaff Cottage Refurbishnment\nMaterial\nLabor\nAppliances\nStaff Cottage Furniture\nTotal\n55555\n$\n45,000.00\n$\n30,000.00\n$\n10,534.05\n$\n17,965.00\n$\n103,499.05\nPurchase New HD Truck\n$\n52,000.00\nAccessories\nTBA\nGSJ\nHeli Pad\nQuonset Hut A\nQuonset Hut B\nHut and Heli Pad\nStaff Cottage Kitchen and Appliances\n$\n8,832.95\n58,000.00\n$ 16,445.00\n40,465.48 $ 54,740.00 Both Huts no EX\nEFTA00612597\n", "char_count": 523}, {"efta_number": "EFTA00612596", "page_number": 2, "text_content": "Staff Cottage Furniture\nElectrical, Plumbing and Walls\nLabor\n$\n7,047.96\n$\n3,250.00\nIn House\n$\n15,880.91\nEFTA00612598\n", "char_count": 117}, {"efta_number": "EFTA00612596", "page_number": 3, "text_content": "66971900V\n4. SCHEDULE\nThe entire project described in this proposal will be completed within 3 months following\nexecution of a contract between the parties.\n5. PRICING & PAYMENT TERMS\nThe project will be undertaken at a price of $?????.00 for labor and materials with the\nexception of the sheds. The sheds from Buck Steel will be purchased by Little St James\nwho will also pay for all shipping costs from factory to job site.\nScope of Work/Labor\nPrice\nGENERAL REQUIREMENTS\na. General Conditions\nb. Shipping, Port Fees & Handling of Buck Steel order paid by LSJ\nTBD\nSITE EXCAVATION & EARTHWORK\na. Earth change protection barricades/silt fencing\nb. Site hand clearing and excavation\nc. Site and foundation footing pads excavation\nd. Backfilling and compaction\ne. Subterranean termite treatment\nf. Site retaining walls (two areas)\ng. Extended exterior walkway along R.O building A\nh. Seeding/restoration of disturbed areas\ni. Trucking & disposal of spoils\nNEW STORAGE BUILDING CONSTRUCTION\na. First floor fittings & foundation walls\nb. Enkadrain drainage matt & bituminous coating\nc. New gravel encased 4\" - PVC drain pipes\nd. First floor concrete bottom salb and entry landing\ne. First floor exterior & interior concrete walls\nf. First floor concrete column pads and columns\ng. First floor concrete beams\nh. Concrete roof slab\ni. Concrete parapet wall w/ cap flashing\nj. Single-ply membrane at parapet and roof\n$ 63,000\n$152,900+\n$327.880\n$ 2,500\n$ 1,500\n$ 1,500\n$ 3,500\n$ 1,200\n$40,000\n$ 8,500\n$ 1,800\n$ 2,500\n$23,400\nAdded KG\n$ 4,500 EB Bid\n$ 2,000\n$18,750\n$ 32,000\n$ 7,500\n$15,500\n$31,000\n$ 5,250\n$ 2,500\n", "char_count": 1606}, {"efta_number": "EFTA00612596", "page_number": 4, "text_content": "00971900\nNEW STORAGE BUILDING CONSTRUCTION, cont.\nk. 6\" compacted earth fill topping on roof\n1. Doors package complete\nm. Electrical complete (fixtures, wiring, installation)\nn. Mecahnical exhaust fans and louvers complete\no. Painting of first floor walls\nR.O. BUILDING A\na. First floor excavation for pier footings\n$111,750 +\n$ 7,500\n$\n3,500\n$ 20,000\nTBD\n$ 1,500\n$ 3,500 Added KG\n$ 9,000\n$ 6,500\n$ 8,750\n$ 28,000\nb. First floor spread footings and foundations\nc. First floor concrete columns and piers\nd. Second floor perimeter grade beams under new slab\ne. Second floor building extended elevated concrete slab\nf. Second floor pre-engineered building package complete Purchsed by LSJ\ng. Second floor pre-engineered building erection complete\nh. Second floor roll-up doors package complete\ni. Second floor electrical complete (Fixtures, panels and installation)\nj. Seconf loor mechanical (exhaust fans and louvers)\nk. Second floor miscellaneous wall painting\nGENERATOR BUILDING B\n$30,000\n$15,000\n$ 9,000\nTBD\n$ 2,000\n$ 30,400 +\nPurchased by LSJ\na. Second floor pre-engineered building package complete\nb. Second floor pre-engineered building erection complete\nc. Second floor roll-up doors package complete\nd. Second floor electrical complete (Fixtures, panels and instalattion)\ne. Seconfloor mechanical (exhaust fans and louvers)\n+. Second floor miscellaneous wall painting\nTOTAL OF ALL CATEGORIES OF WORK ABOVE\nCONTINGENCY (15%)\nGRAND TOTAL\n69 69 69\n$12,000\n$12,500\n$ 5,000\nTBD\n900\n$\nEB Bid\nPayment schedule/terms are as follows:\n", "char_count": 1532}, {"efta_number": "EFTA00612596", "page_number": 5, "text_content": "10971900\nGenerator/Mechanical\n& R.O. Buildings\nConstruction Proposal\nSSVI\nEx\nExpert\ncavation & Builders\nMarch 9, 2017\nPrepared for:\nGreat St. James & Little St. James\nRed Hook Quarters, St. Thomas, VI\nContact: Brice Gordon\nPrepared by:\nSSVI-Expert Builders\n6501 Red Hook Plaza, Ste 201\nSt. Thomas VI 00802\n(340) 776-4000\nContact: Alex Crawford accounting@viexpertbuilders.com\n", "char_count": 376}, {"efta_number": "EFTA00612596", "page_number": 6, "text_content": "70971900\n1. INTRODUCTION\n2. ABOUT SSVI\n3. SCOPE OF WORK\n4. SCHEDULE\n5. PRICING & PAYMENT TERMS\n6. GENERAL TERMS & CONDITIONS\n7. ASSUMPTIONS\nSSVI is pleased to submit this construction proposal to LSJ c/o Brice Gordon to be performed at\nthe property located at Little St. James, USVI.\nBy the signature of SSVI's authorized representative set forth below, SSVI agrees to be bound\nby the representations made herein.\nThis construction proposal and the pricing provided herein shall remain valid for a period\nof 60 days following the date shown on page 1.\n1. INTRODUCTION\nLittle St. James desires to have the existing Generator/Mechanical & R.O buildings removed\nand replaced with new structures and has provided a general specification and has\ncommunicated a set of requirements, which are summarized as follows:\nSite Excavation & Earthwork\nNew Storage Building Construction\nR.O Building (A)\nGenerator Building (B)\nSSVI / Expert is confident that it will present the best value for Little St James. First, our past\nperformance record to meet schedules and deliver a high-quality product, at a relatively low\ncost as compared with the competition. Second, our extensive expertise in this area allows\nus to tackle tough projects on a fixed-price basis, thereby alleviating any concern that the\nprice may increase. Third, the talent level of our team is unparalleled and our project\nmanagement practices ensure labor efficiencies that drive costs down. Finally, our access\nto the highest quality materials at highly competitive prices ensures the lowest possible cost\nof goods.\n", "char_count": 1572}, {"efta_number": "EFTA00612596", "page_number": 7, "text_content": "20971900\n2. ABOUT SSVI\nSSVI is an established and well-respected local contractor that has been serving customers\nin The Virgin Islands since 2009. SSVI has completed a broad range of construction projects\nover the years, and many of them have been of comparable scope and magnitude as\ncompared with this construction project.\nSSVI is supported by an extraordinary team of professionals who are highly skilled in their\ntrade. For this project, the team will be lead by Reynolds Clement. Reynolds Clement has a\nproven track record of successfully leading projects such as this.\n3. SCOPE OF WORK\nSSVI will perform all construction activities associated with the new buildings on Little St\nJames. Such work will be carried out in accordance with requirements communicated to\nSSVI by Little St James in this proposal and the architectural plans provided by the\nJaredian Design Group. In addition to the responsibilities of SSVI outlined in such document,\nSSVI will be responsible for the following:\nSite Excavation & Earthwork\n⚫ New Storage Building Construction\nConstruction of the R.O Building and the Generator\nBuilding\nSite Cleanup\n", "char_count": 1132}]}