{"efta_number": "EFTA00612232", "page_count": 1, "url": "https://epstein-data.com/EFTA00612232", "pdf_url": "https://epstein-data.com/pdf/EFTA00612232.pdf", "pages": [{"efta_number": "EFTA00612232", "page_number": 0, "text_content": "2/19/12\nR\nAtlanta Refrigeration Service Quote\nARS Export Supply\nFormerly Atlanta Refrigeration Service VI\n7350 Estate Bovoni, Suite 121C, St. Thomas USVI 00802\nTel: 340.775.9222 Fax:340.775.9122\nQUOTE\nJob Location\nLittle Saint James\nLittle Saint James\nSt. Thomas, VI 00802\nTel.: 340-775-2525 Fax:.\nARS Quote ID#: 9828862\nSubmitted By: Kent Magee\nSubmitted To: Brice Gordon\nQuote Information\nDate: Jul 30, 2012\nOriginal ARS Inv#:\nOriginal Call Date: 6/15/2012\nWe Submit Specific and Estimations for the Listed Below:\nEquipment: Chiller\nManufacturer: Carrier\nModel #:\nSerial #:\nDescription of Work Required:\nThe following is a quote for the chiller in the library. We are proposing to retum to site and remove the old chiller system. We\nwill install the new airhandler, chiller, reheat system, controls and dampers. The Controls installed will what was provide by\nEMS. The chiller will have a E-Coating on the condenser coil to resist corrosion. We will also provide a spare chiller to keep\non site in case a replacement is needed. The new system will control the humidity of the library and control temperature\nproperly. Shipping is included to St thomas. Barge must be provided for equipment to get out to LSJ. The use of the on site\nlull must be provided also for unloading container and getting equipment into place and removing the old equipment. Thank\nyou for choosing ARS Export Supply!\nMaterials\nDescription\nCarrier Complete Chiller System\nSpare Carrier Chiller\nDDC Controller, Controls and installation\nDuct work, Dampers, Materials\nAll Piping, Valves, Hardware\nQty\nTotal\n1.0 $48,501.20\n1.0 $26,550.00\n1.0 $29,348.00\n1.0 $2,845.00\n1.0 $3,680.00\nabor\nCoscuption\nInstallation Labor\nCRY\nTotal\nImportant Notes:\nLead time is 10-12 weeks depending on Manufacture lead time on equipment. Once\napproved 50% is due before any equipment will be ordered. Once equipment arrives,\n25% will be due before installation work can begin. Once project is complete and\nrunning final 25% will be due.\n1.0 $14,500.00\nTotal Materials: $110,924.20\nTotal E.P.A.\nTotal Misc./Welding:\nTotal Labor:\nInitial Call:\nShipping/Freight:\n$14,500.00\nWarranty Information:\nManufacturer parts warranty and 30 day labor warranty on work performed\nSubtotal:\n$4,500.00\n$129,924.20\nTax:\nTotal:\n$129,924.20\nFAX BACK SIGNED TO 340-775-9122\nAuthorization\nClient Authorization:\nrsx.calllog.com/do/quote View?id=9828862\nARS Acceptance:\n1/2\nEFTA00612232\n", "char_count": 2413}]}