{"efta_number": "EFTA00612208", "page_count": 1, "url": "https://epstein-data.com/EFTA00612208", "pdf_url": "https://epstein-data.com/pdf/EFTA00612208.pdf", "pages": [{"efta_number": "EFTA00612208", "page_number": 0, "text_content": "LANSDCAPE SERVICES PROPOSAL \n3/22/13 \nProject Name: Zorro Ranch Phase One \nArea between Main Bldg and Staff House - DOG RUN area: \nPlant Removal to prepare for new plantings \nUpper Terrace by Kitchen: \nRemove two ponderosa trees, grind stump, dispose to dump trailer by owner \nTransplant Hawthorn to new location by the building \nUpper Terrace by the Library: \nRemove one Juniper, cut stump below grade, dispose to dump trailer by owner \nRemove misshapen Hawthorn by the Juniper \nTransplant Hawthorn to new location by the building \nBowl Garden Terrace by the Pool and transition area to the native landscape on \nboth sides: \nPrune privctts and other shrubby plants at transition zone \nPrune dccidious trees at pool entrance \nLibrary/ Office Terrace \nPrune and shape dogwood \nPrune and shape plants in transition zone outside stone wall all the way to water feature \nat the end of chess lawn \nRemove and stockpile catmint for transplanting in Ph. 2 \nChess Lawn Garden \nPrune, shape, amend and replant Spirea at fountain to balance \nShape and prune groupings of sumacs \nShape and prune dogwood \nShape and prune dccidious trees on both sides of the lawn \nGrand Entry Area \nMove Spirea to back of planter in all quadrants to prepare for Juniper infill \nRemove ornamental grass behind existing Ponderosa \nShape and prune holly throughout as needed to balance \nShape and prune Viburnum in all quadrants and alongside back of garage for balance \nPhase One Total (excluding sales tax): \n$7,638.62 \nEFTA00612208\n", "char_count": 1504}]}