{"efta_number": "EFTA00611600", "page_count": 2, "url": "https://epstein-data.com/EFTA00611600", "pdf_url": "https://epstein-data.com/pdf/EFTA00611600.pdf", "pages": [{"efta_number": "EFTA00611600", "page_number": 0, "text_content": "4 LES FILE DRYWALL, INC.\n116 INDUSTRIAL NE ALBUQUERQUE, NEW MEXICO 87107\n(505) 345-8283 FAX (505) 345-7528\nNM License # 006221\nNM Dept. of Labor Registration # 0002220060701\nBid:\nAttn:\nZORRO Ranch site wall stucco\nEstimating Department\nAddendum:\n0\nPage 1 of 2\nDate:\nPlan Date:\nContact:\n04/12/10\nAlan Chavez\nRemove existing gypsum board at pilaster pop out detail and remove loose/pealing stucco finish\nand place in appropiate dump trailor provided by ZORRO Ranch for disposal.\nInstall weep screed at bottom of wall to be re-stuccoed, install all plaster stops/casing beads at\npilasters to create new pop outs and at dissimilar materials.\nInstall new weather barrier and expanded metal lath and install a new 2coat cement stucco system,\napply a new fiberglass mesh over stucco system with a synthetic base coat, apply a new\n\"Acrylic\" based finish coat over base coat.\nApply a color wash over new finish coat to achieve a Faux finish\nInstall sealants at casing beads to dissimilar surfaces\nJob Specific Inclusions:\nJob Specific Exclusions:\nStandard Exclusions:\nCustomer to pay NM gross receipts tax on price\n$\n69,600.00\nBid\nNM Gross Receipts Tax- Santa Fe County\n6.50% $\n4,524.00\nAdd options:\nAdd for re-stucco at Mechanical House\n$\n43,000.00\ntax $\nTotal Mechanical $\n2,795.00\n45,795.00\n1.03% $\n720.00\n*********\nADD FOR BOND NOT INCLUDED IN BASE BID\nPROPOSAL VALID FOR 60 DAYS\nMATERIAL QUOTES GOOD THROUGH 4TH QTR. 2010. MUST BE\nNOTIFIED WITHIN 30 DAYS OF BID DATE TO SECURE MATERIAL QUOTES\nEFTA00611600\n", "char_count": 1502}, {"efta_number": "EFTA00611600", "page_number": 1, "text_content": "4 LES FILE DRYWALL, INC.\n116 INDUSTRIAL NE ALBUQUERQUE, NEW MEXICO 87107\n(505) 345-8283 FAX (505) 345-7528\nPage 2 of 2\nBid:\nAttn:\nAddendum:\nZORRO Ranch site wall stucco\nEstimating Department\n0\nDate:\nPlan Date:\nBid Clarifications:\n04/12/10\n1/0/1900\n1. Les File Drywall reserves the right to negotiate all scheduling of work.\n2. Any subcontract to be executed by Les File Drywall shall be subject to Les File Drywall's consent and approval and shall not\nchange in any manner the terms of this proposal which in any case shall take precedence over terms and conditions of such\ncontract. In the event, the parties fail to execute a contract and Les File Drywall commences work on the project, the terms of\nthis proposal and bid shall be binding on the other party.\n3. All provisions in a subsequent contract which require Les File to obtain insurance in a type and/or amount in excess of what it\ncurrently carries shall be considered an additional cost for which Les File shall be entitled to be paid additional monies prior to\nproviding same.\n4. Retainage percentage not to exceed that held by owner on General for Les File portion of work.\n5. All work to be done per plans and specs. Code compliance is the responsibility of the Architects and Engineers.\nIn the event our quotation is accepted and within the contract we are to sign there is included a \"hold harmless clause\" subjecting us to liability other than\nof our employees and agents, the additional amount of insurance premium required, to cover such clause, will be added to our contract price. Quote\nbased on use of locally available material or specified material. Upon acceptance...... This proposal shall be made a part of the subcontract and will take\nprecedence over any subcontract terms in the event of a discrepancy or a dispute. Estimate shall be in your office by of each month and shall be\npaid by the\nGeneral shall notify Subcontractor within 10 days of General receiving final payment from Owner. No back charge shall be valid\nunless Subcontractor is notified in writing within 72 hours from the occurrence of the act resulting in the alleged back charge and provided with a detailed\nbreakdown of said charge. Owner and/or General to carry Builder's Risk in the amount satisfactory to Subcontractor.\nWork to be completed according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only\nupon written orders and will become an extra charge over and above the estimate. No fines or penalties of any kind shall be valid due to causes beyond\nour control, including to but not limited to weather, strikes, delays caused by other trades, etc. Owner is to carry fire, tornado and builders risk, and other\nnecessary insurance.\nAcceptance of Proposal - the above prices, specifications and conditions are satisfactory and are hereby accepted. Payment 5 days overdue shall bear\ninterest at the rate of 1 1/2% per month until paid in full. Customer shall pay all attorney's fees and costs of collection.\nNOTICE: All changes that have been directed to be performed by the contractually required personnel. Executed change orders must be provided to Les\nFile Drywall no later than 30 days from the date of this notice. Payment for Change Orders is due within 30 days of receipt of this notice. Unless Les File\nDrywall receives written notice of the contracting party's intent not to pay for the listed change orders below within 5 days of receipt of this notice, the cost,\nincluding attorneys' fees and costs of collection. Les File Drywall reserves the right to halt all change order work for failure to pay change orders as\nspecified above.\nAccepted By:\nWitnessed By:\nDate of Acceptance:\nEFTA00611601\n", "char_count": 3727}]}