{"efta_number": "EFTA00611523", "page_count": 4, "url": "https://epstein-data.com/EFTA00611523", "pdf_url": "https://epstein-data.com/pdf/EFTA00611523.pdf", "pages": [{"efta_number": "EFTA00611523", "page_number": 0, "text_content": "Subbase Drydock Inc.\nPO Box 4429/ Parcel 162 Subbase\nSt. Thomas, USVI, 00803\nT:(340) 776-2078 Fax: (340)779-8426\nBill To:\nLSJ,LLC\nCustomer Phone\nCustomer Fax\nP.O. No.\nProject\nAnn/Boscoe\nBig N/LSJ Barge\nQty/Hrs\nDescription\nCustomer E-mail\nInvoice\nDate\nInvoice #\n4/23/2015\n6812\nWe accept cash,\nTerms\nUpon Completion\nchecks, major credit cards, travelers\nchecks and wired funds. More info\navailable regarding wired monies.\nSubbase and Island Rigging and Hydraulics reviewed projects that were on your \"to do list\"\nthis morning. I will list all projects that I can with a quote for each repair but first I would\nlike to comment on the condition of the LSJ Barge.\nThis vessel was hauled out at our yard three years ago. During that haul out Subbase\nquoted on most of the items you have in this current list. It was surprising to see that our\nrecommendations were not completed and as a result the current condition of the vessel is\nnot seaworthy. The overall appearance of the vessels is that it looks neglected and repairs\nthat were essential were cobbled together in an effort to get by.\nThe LSJ Barge needs a major overhaul to make her seaworthy and to ensure an extended\nservice life.\nSubbase in not interested in making any repairs that will not be done properly; nor are we\ninterested in patching anything together for a temporary fix.\nI understand that some projects may be more important then others so I will try to list each\nproject individually.\n1 Drydock hauling fees\n12 Laydays: Approx 12\n1 Electricity Fee: Hook Up\n12 Electricity Fee: per day\n15000 psi pressure wash\nRate\nAmount\n1,500.00\n1,500.00\n350.00\n4,200.00\n75.00\n75.00\n60.00\n720.00\n327.00\n327.00\nThank you for your business.\nPlease note Subbase Drydock Inc. reserves the right to not release any\npart/parts, projects or vessels for which/ on which the above detailed work\nhas been performed until payment in full is received.\nTotal\nPayments/Credits\nBalance Due\nPage 1\nEFTA00611523\n", "char_count": 1946}, {"efta_number": "EFTA00611523", "page_number": 1, "text_content": "Subbase Drydock Inc.\nPO Box 4429/ Parcel 162 Subbase\nSt. Thomas, USVI, 00803\nT:(340) 776-2078 Fax: (340)779-8426\nBill To:\nLSJ,LLC\nP.O. No.\nAnn/Boscoe\nCustomer Phone\nCustomer Fax\nProject\nBig N/LSJ Barge\nDescription\nCustomer E-mail\nTerms\nUpon Completion\nInvoice\nDate\nInvoice #\n4/23/2015\n6812\nWe accept cash,\nchecks, major credit cards, travelers\nchecks and wired funds. More info\navailable regarding wired monies.\nQty/Hrs\n11 & 2) Rudders: Subbase personnel examined the rudder room and we were able see major\ncorrosion on the transom. The hull plating has holes where sea water is seeping into the\nvessel. The steering components need to be removed and cleaned, the rudders need to be\nremoved and serviced. The lower Pintle and gudgeons need service as well as the rudder\nstuffing box. I would reserve 10k to 20k for this project. I have included pictures of this\ncompartment.\n13-A) Install two cylinders with stainless steel shafts; including all hoses back to engine\nroom, with stainless steel ends on all hoses. We will re-evaluate the valving and other\nengine room components to see what can me reused vs. replaced.\nWe have been informed that the present pump is in good condition so we are not quoting on\nreplacement of pump. Labor and Materials will be $35-45,000.\n13-B) The steel boxes that secure the cylinders to the hull are deteriorated and will need\nreplacement. Subbase recommends using stainless steel to eliminate the corrosion. Three\nyears ago we quoted $16,000.00 for both boxes and we will still honor this quote.\n14) The exhaust system is in a non-repairable condition and needs replacement from the\nmain engine to the hull outlet. Our quote will include all new piping, flex joints, exhaust\nmixers, and new exterior aluminum outlet. When system is complete it will be wrapped\nwith a removable wire mesh hi-temp blanket. The new system will be much quieter than\nthe existing exhaust system. Labor and material $21,000.00.\nRate\nAmount\n20,000.00 20,000.00\n45,000.00 45,000.00\n16,000.00 16,000.00\n24,500.00 24,500.00\nThank you for your business.\nPlease note Subbase Drydock Inc. reserves the right to not release any\npart/parts, projects or vessels for which/ on which the above detailed work\nhas been performed until payment in full is received.\nTotal\nPayments/Credits\nBalance Due\nPage 2\nEFTA00611524\n", "char_count": 2316}, {"efta_number": "EFTA00611523", "page_number": 2, "text_content": "Subbase Drydock Inc.\nPO Box 4429/ Parcel 162 Subbase\nSt. Thomas, USVI, 00803\nT:(340) 776-2078 Fax: (340)779-8426\nBill To:\nLSJ,LLC\nP.O. No.\nAnn/Boscoe\nCustomer Phone\nCustomer Fax\nProject\nBig N/LSJ Barge\nDescription\nCustomer E-mail\nInvoice\nDate\nInvoice #\n4/23/2015\n6812\nTerms\nUpon Completion\nWe accept cash,\nchecks, major credit cards, travelers\nchecks and wired funds. More info\navailable regarding wired monies.\nQty/Hrs\n15) Engine mounts need to be de-scaled of rust. Bolts holding mounts need to be cleaned or\nrenewed and alignment from coupling to shaft needs to be checked and adjusted for proper\ntolerances. An extensive review was completed of this drive train back in 2012 with repair\nrecommendations made at that time. I do not know if this problem was solved so to budget\nfor this I would reserve 5k to 7k for this project. (before exhaust system is finalized this\nalignment must be done).\n16) Stuffing boxes: Subbase was informed that new stuffing boxes are on hand and will be\nowner supplied, after haulout removal of hose joining stuffing box to shaft log will reveal\nthe condition of shaft log. I would reserve 5k for this project.\n1 Cutless bearings require removal of main shafts and propellers: After removal of coupling,\nshafts and props a condition report will follow if drive train is serviceable the routine\nmaintenance for renewing cutless bearing will only need attention. Labor and material for\nthis is (both port and starboard) $4,150.00.\n18) Engine Cooling Grid: Pressure test system and issue report for this service. Reserve\n$1,200.00\n19) Bottom paint and barrier coat: Labor and material $7,500.00.\n10) Engine and marine gear - Review upon haul out --- QUOTE WILL BE ISSUED\n111) Fuel tank: Cleaning and disposal\nItems 12 thru 18 will need more time to evaluate --- QUOTES WILL BE ISSUED\nThank you for your business.\nPlease note Subbase Drydock Inc. reserves the right to not release any\npart/parts, projects or vessels for which/ on which the above detailed work\nhas been performed until payment in full is received.\nTotal\nRate\nAmount\n7,000.00 7,000.00\n5,000.00 5,000.00\n4,150.00 4,150.00\n1,200.00 1,200.00\n7,500.00\n7,500.00\n0.00\n0.00\n2,800.00 2,800.00\n0.00\nPayments/Credits\nBalance Due\nPage 3\nEFTA00611525\n", "char_count": 2234}, {"efta_number": "EFTA00611523", "page_number": 3, "text_content": "Subbase Drydock Inc.\nPO Box 4429/ Parcel 162 Subbase\nSt. Thomas, USVI, 00803\nT:(340) 776-2078 Fax: (340)779-8426\nBill To:\nLSJ,LLC\nP.O. No.\nAnn/Boscoe\nQty/Hrs\nCustomer Phone\nCustomer Fax\nCustomer E-mail\nInvoice\nDate\nInvoice #\n4/23/2015\n6812\nWe accept cash,\nProject\nTerms\nBig N/LSJ Barge\nUpon Completion\nchecks, major credit cards, travelers\nchecks and wired funds. More info\navailable regarding wired monies.\nDescription\nRate\nAmount\n119) Clean engine room: Before any repairs are started clean and degrease entire engine\nroom, dispose of oily water. After repairs are complete clean and paint engines and any\nother areas that were painted. Remove engine hatch covers and assess condition. Make\nnecessary repairs and reinstall after all. Labor and material $5,500.00\n120) Hydraulic Tank: Due to severe corrosion of the steel hydraulic tank, Subbase\nreccomends replacing tank with new marine grade aluminum tank complete with all\nnecessary fittings and sight glass to view levels. Labor and Materials.\n***One-third due at mobilization, one-third at 50% completion and balance at\ncompletion***\nThank you for your business.\nPlease note Subbase Drydock Inc. reserves the right to not release any\npart/parts, projects or vessels for which/ on which the above detailed work\nhas been performed until payment in full is received.\nPage 4\n5,500.00\n5,500.00\n5,000.00 5,000.00\nTotal\n$150,472.00\nPayments/Credits\n$-1,000.00\nBalance Due\n$149,472.00\nEFTA00611526\n", "char_count": 1446}]}