{"efta_number": "EFTA00611158", "page_count": 1, "url": "https://epstein-data.com/EFTA00611158", "pdf_url": "https://epstein-data.com/pdf/EFTA00611158.pdf", "pages": [{"efta_number": "EFTA00611158", "page_number": 0, "text_content": "VP-BBJ MAITENANCE REQUIREMENTS\nThe Base Maintenance checks are carried out at 6 monthly intervals, usually\nAugust/February.\n'A'1 Check 6 month\n'A'2 Check 12 month\n'C'1 Check 36 month\n'C'2 Check 72 month\n'C'3 Check 144 month\nDue Aug 2011\nDue Aug 2011\nDue Aug 2011\nDue Aug 2011\nDue Aug 2011\nLine maintenance items carried as and when required.\nMonthly check: performed each calendar month (package).\n3 monthly items: service Heads Up Display overhead unit desiccant capsule.\n150 hrs items: L/H/R/H Engine FMC CDU Bite check.\n300 hrs items: CVR operational test\n400 hrs items: IDG oil level & Delta P Indicator\nMaintenance requirements for 2010/2011.\nA1, A2, C1, C2 & C3 Checks due in August 2011, to be performed.\nDuring this maintenance visit all required AD's, Service Bulletins and Service Letters will be\nperformed.\nIn August 2011 during the C3 check (144 month), Main & Nose Landing Gear will be removed for\noverhaul.\nEFTA00611158\n", "char_count": 934}]}