{"efta_number": "EFTA00610356", "page_count": 2, "url": "https://epstein-data.com/EFTA00610356", "pdf_url": "https://epstein-data.com/pdf/EFTA00610356.pdf", "pages": [{"efta_number": "EFTA00610356", "page_number": 0, "text_content": "LAFAYETTE CONTRACTORS LLC\n6100 Red Hook Quarter, Suite 42-7\nSt. Thomas, VI 00802\nINTERNAL PROPOSAL No. 23\nDate: 11 December 2007\nTelephone:\nFax:\nRev. 12 December 2007\nProposal No. 00024\nRE: Budget for Initial Site Excavation at RO/Mechanical Building\nA CZM permit has been issued for the sitework at this site. It can be begun immediately. At\nthe urging of Doug Schoettle and Dan Chipman the team believes that the initial phase of this\nwork, i.e. erosion control, the excavation of material, and removal and storage on island can\nand should be begun immediately. All of the initial work can be done with forces and\nequipment already on the island or scheduled to be delivered very soon with the exception of\nthe dump truck listed below.\nCharles Miller has instructed that we present this proposal in the following format:\nDan Chipman will organize and manage all the work short and long term. The costs of\nerosion control can be estimated from the drawings as is done below. The costs of earthwork\nand rock removal are unknown. This work will be done on a time and materials basis using\nthe resources set out below:\n1. Survey: $1,0000 (allowance)\n2. Erosion Control\na. Erosion Fence 435 lineal feet\ni. Labor: 88 man-hours @ $15hr\n$ 1320\nii. Material 435 lineal feet @ $8.50 a foot\n$ 3698\nb. Erosion Mats\ni. 24 @ $55\n$ 1320\nii. Staples 4 box @ $45\niii. Labor 2 men x 72 = 144x$15\n$ 180\n$2160\niv. Clearance, Customs and barging\n$ 1960\nc. Outside Equipment required: One 18 yard dump truck with operator\ni. Estimated 10 weeks @ $2600\nii. Fuel 70 gal wk x 10wks @ $4.00 gal\n$ 26,000\n$ 2,800\n3. Balance of earthwork and rock removal as follows:\na. Island Equipment (at established island rates)\n$ 39,438\nEFTA00610356\n", "char_count": 1713}, {"efta_number": "EFTA00610356", "page_number": 1, "text_content": "LAFAYETTE CONTRACTORS LLC\n6100 Red Hook Quarter, Suite A2-7\nSt. Thomas, VI 00802\nTelephone:\nFax:\ni. Two trackhoes\nii.\n10 yard dump truck\niii. Dozer (as needed)\niv. Small backhoe (as needed)\nb. Island Labor (at established island rates) [4 persons]\ni. Operators for each of the items of equipment listed above\nii. One laborer\nApproval is being requested to set up a cost code for this work and to start executing it\nimmediately as described above.\nLafayette Contractors, LLC\nPrepared by: William Rowles\n✗\n✗\nApproved: John Amerling\nApproved: Dan Chipman\n✗\nApproved: Charles Miller\n✗\nNew York Strategy Group, LLC\nApproved: Emad Hanna and/or Rich Kahn\nAction:\nApproved\nApproved as noted\nRejected\nJeffrey Epstein\nEFTA00610357\n", "char_count": 721}]}