{"efta_number": "EFTA00607771", "page_count": 5, "url": "https://epstein-data.com/EFTA00607771", "pdf_url": "https://epstein-data.com/pdf/EFTA00607771.pdf", "pages": [{"efta_number": "EFTA00607771", "page_number": 0, "text_content": "The Court Store, Inc.\n758 South Broad Street\nToccoa, Georgia 30577\nPhone:\nToll Free:\nFax\nTHE MOST IMPORTANT FIRST STEPS TO BUILDING A TENNIS COURT\nBuilding a tennis court is not difficult. Just like any other project you take on, planning, preparation, and information are\nthe keys to your success. This article will provide enough information to help you plan and prepare for the construction\nof a beautiful, structurally sound tennis court. Let's get started.\nDO YOU HAVE ENOUGH ROOM FOR A COURT?\nIn many cases, where you place the court is not the issue. Unless you own five or more acres of land, your main concern\nis probably, do I have enough room for a tennis court? Here are a few facts for those who fall into this category:\nA full size, regulation tennis court is 60' wide by 120' long. The USTA (United States Tennis Association) says a\nrecreational court can be as small as 52' x 110' and still accommodate quality play. Multiple courts sharing the\nsame surface and fence should have 12 feet between each court and from the fence line or any other side\nobstruction, and 21 feet from the baseline to the back fence. For example, a regulation two court battery would\nmeasure, at least, 108' wide by 120' long. If you want fence between the two courts, the dimensions would be\n120' wide by 120' long. See the diagrams below:\n24\n12'\nFULL SIZE 2 COURT BATTERY WITH DIVIDER FENCE\n120'\n78'\n12'\n12'\n24\n78°\n←.17→\n17->\n12'\n120'\n12'\n21'->\nSTANDARD 2 COURT BATTERY\n108'.\n12'\n12\n17→\n120'\n60'\n60'\nGenerally, you should plan for a minimum apron of 5 feet around the court perimeter, if the surrounding\nlandscape is close to the same elevation as the tennis court. If the landscape changes dramatically (i.e. the side\nof a hill) you should plan for a minimum of 10 feet of consistent, relatively true, grade following the court sub-\ngrade (the prepared ground for the court). See the diagrams below:\nEFTA00607771\n", "char_count": 1909}, {"efta_number": "EFTA00607771", "page_number": 1, "text_content": "MINIMUM GRADED APRON AROUND COURT 10 FOOT GRADED APRON AROUND COURT\n70'\n5'\n80'\n10'\nin\nS\n130'\n10'\n10\n10'\nDRAINAGE CONSIDERATIONS\nYou should always plan drainage from the surrounding landscape to drain around and away from the court. This\nmay require swales or retaining walls. The diagram below illustrates a simple grading plan. Notice how water is\nrouted from the high side of the landscape, around the court, and then down the landscape beyond the court. You\nnever want your drainage plan to allow water from the landscape to drain across the court surface.\nA tennis court should slope 1 inch in every 10 feet. The optimal direction of the slope is from one side to the other.\nFor instance, a regulation single court measures 60 feet wide. That means it should have 6 inches of fall from one\nside to the other. In many cases the topography around the court will not lend itself to a side to side slope and you\nwill have to slope the court from end to end or corner to corner. The only slope that is not conducive to quality\ntennis is a court that is sloped in two directions. An example would be to have the peak of the slope at the net line\nwith the court sloping toward the each of the back ends. I call this the rooftop slope and it should be avoided at all\ncost. The slope of a tennis court must be in one continuous plane. See the sketch of one slope and drainage plan in\nthe next graphic.\nEFTA00607772\n", "char_count": 1410}, {"efta_number": "EFTA00607771", "page_number": 2, "text_content": "TYPICAL GRADING PLAN AROUND TENNIS COURT\nCourt Slope\nLandscape Slope\nCourt Slope\nLandscape Slope\nCourt Slope\nLandscape Slope\nEVKA\nSWALE\nLANDSCAPE\nTENNIS COURT\nLANDSCAPE\nLAYOUT THE PROPOSED COURT AREA\nOnce you have a spot you believe will be big enough for your court, it's time to lay it out. You'll only need a few\nitems to accomplish this: a 150' tape measure, a bundle of irrigation flags, a can of bright orange upside down spray\npaint, and a calculator with the square-root (V) function. The first step is to pick a line which represents one edge of\nyour court. It may be a side you want to run parallel to your house at a certain distance. It may just be a line you\npick in the middle of a field that will orient your court properly to the sun. The USTA suggest optimal orientation for\na tennis court is:, true north/south for the upper two thirds of the US, and 15-25 degrees west of true north for the\nsouthern 1/3 of the country.\nWhatever line you choose, use your tape measure to find the two ends and mark them with the irrigation flags.\nAfter the flags are set, find your square corners using the instructions in the diagram below. If your court\ndimensions are different than 60' x 120', you can determine the diagonal (long leg of the triangle) by using the\nPythagorean Theorem. Now you know why a calculator was on the list. For those who are not math geniuses here's\nwhat you do: (1) multiply the length times itself and hit the M+ key, (2) multiply the width times itself and hit the\nM+ key again, (3) hit the MR key and then the V key, and Viola! The number on the screen is the diagonal for your\ncourt. This diagonal ensures your court layout is square. When the diagonals intersect with the respective length\nand width your court is square.\nEFTA00607773\n", "char_count": 1773}, {"efta_number": "EFTA00607771", "page_number": 3, "text_content": "120'\nMEASUREMENTS FOR COURT LAYOUT\n-60'\n136'-2\"\n60'\n136'-2\"\n120'\nSHOULD I HIRE A LANDSCAPE ARCHITECT?\nYou are now at the point where a couple of major decisions have to be made. The first decision is whether or not to\nhire a landscape architect. If you live out in the country, as I do, and have lots of relatively flat land, you may not\nneed one. If you live in a metropolitan area, or on less than 5 acres, you will need a civil engineer, general\ncontractor, or landscape architect just to make sure you are in compliance with the local building and zoning laws\nand to pull the necessary permits. The landscape architect is the most versatile of the three. He will not only handle\nthe permitting and drainage issues, but will also be able to incorporate your court into the surrounding landscape so\nthat is aesthetically pleasing. They are experts in all aspects of outdoor design and construction.\nSHOULD I HAVE MY COURT SITE TESTED?\nOnce the location of your court has been finalized, you should consider hiring a geotechnical (soil) engineer. You will\nwant them to perform hand-auger borings in at least 6 points, preferably 10, on the location you have chosen for\nthe court. See the diagram below for boring locations. The borings test for: unstable soil, high ground water, buried\norganic debris (tree stumps, construction trash, etc...), and many other conditions which determine the suitability of\nthe proposed construction site. Honestly, most people skip this step, and 95% of the time they don't notice any\nnegative effect for years, if ever. For the 5% who skip this step and build on sites with serious problems, the repair\ncosts are out of all proportion to the testing fees they saved. I have seen areas sink 3 inches deep by 30 feet in\ndiameter, in one year, in the middle of a new court and have pulled out stumps, logs, carpet, lumber, and just about\neverything else. Conditions such as high ground water and unstable soils may not affect you court immediately, but\nwill eventually manifest themselves as cracks, and/or settlement of the surface.\nYour landscape architect will probably be able to recommend a good engineer, or you can check the yellow pages.\nTry to find, at least, three firms and compare prices. In Atlanta, prices vary between $500.00 and $1500.00 dollars\nfor essentially the same services. The engineer will perform the hand-auger borings to a depth of 6' and provide a\nEFTA00607774\n", "char_count": 2422}, {"efta_number": "EFTA00607771", "page_number": 4, "text_content": "report detailing the soil conditions every 12\". His report will also describe any problem conditions and recommend\ncorrective measures.\nLOCATIONS FOR HAND-AUGER TESTING\nHOW DO I PROCEED FROM HERE?\nYou are now ready to drive real stakes in the ground. If the planned court is anywhere close to your property line\nset-backs, easements or other restricted areas, hire a surveyor for this step. If your court encroaches on any of\nthese restrictions, even a little, you may find yourself tearing it out and starting over. Once the stakes are set you\ncan begin getting estimates from tennis court contractors who will provide a \"turn-key\" construction package or\nfrom individual specialty contractors if you decide to handle the project as your own general contractor. You may\nalso want to build some or all of the court yourself. Whichever way you decide to move forward, if you have\nfollowed the steps we have outlined, your court project is starting on solid foundation (figuratively and literally). We\noffer detailed instructions on every aspect of court construction in our store. These instructions are provided free\nwhen you purchase related construction products from us. These instructions are invaluable whether you hire\nsomeone for the installation or you do it yourself. Someone once said, \"Knowledge Is Power\".\nThank you for taking the time to read our article. If you have any questions or would like more information, contact:\nMark Montemayor,\nor\nEFTA00607775\n", "char_count": 1469}]}