{"efta_number": "EFTA00599819", "page_count": 1, "url": "https://epstein-data.com/EFTA00599819", "pdf_url": "https://epstein-data.com/pdf/EFTA00599819.pdf", "pages": [{"efta_number": "EFTA00599819", "page_number": 0, "text_content": "GENERAL CONSTRUCTION NOTES\n1. The building construction site shall be accepted \"as is\" at the date of the drawings. The Contractor\nand/or subcontractors shall carefully examine and familiarize themselves with all existing site\nconditions, prior to commencement of Work. The Owner or Architect assumes no responsibility for\nactual field co\neld \nconditions of site elements or integrity of existing structures thereupon.\n2. The Contract Documents are complimentary and what is called for by one sheet or page shall be\nbinding as if called for by all. The intention of these documents is to include all labor, materials, and\nequipment necessary for proper and complete execution of Work. Where the construction, equipment,\nor other conflicting elements requires revised details, arrangements, or connections that are different\nthan shown, it is the Contractor's responsibility to install the Work in harmony with the intent of the\ndrawings or specifications.\n3.\n3. Addition and alteration w\nion work will require the demolition, preparation, and modification of the\nexisting building(s) and site work, and the completion of associated new construction objectives\nIndicated. New construction work is the preparation of the site to receive and erect the new structure\ndetailed. The verbiage and references contained herein shall be interchangeable between any new\nbuilding project and/or altered/existing building construction objectives, where applicable.\n4. The Owner reserves the right to let other contracts in connection with Work. The General Contractor\nshall afford other Contractors a reasonable opportunity for the introduction and storage of materials\nand the execution of his Work, and shall properly coordinate and connect their Work wi\nek with \nhis hers\n5. The Contractor is encouraged to submit alternate or \"equal\" items, which do not affect design, intent,\nor project quality. The Architect must approve any and all \"equal\" requests or substitutions prior to its\ninitiation. Present such r\n... [truncated, 44376 chars — for the full page use /api/corpus/document/EFTA00599819/0 or ?id=EFTA00599819&page=0]", "char_count": 44376}]}