{"efta_number": "EFTA00587677", "page_count": 2, "url": "https://epstein-data.com/EFTA00587677", "pdf_url": "https://epstein-data.com/pdf/EFTA00587677.pdf", "pages": [{"efta_number": "EFTA00587677", "page_number": 0, "text_content": "Zorro HVAC Mechanical Inspection \nAugust 22 -24, 2012 \nOn Wednesday, August 22, 2012 I arrived at Zorro Ranch to inspect the condition of the \nHVAC system to review preventative maintenance and repairs made by JB Henderson \nand to evaluate the BMS filet 2000 control system. The following is a list of systems and \nequipment that were checked and recommendations for upgrades. \nI. Marley Cooling Tower: Found corrosion on air intake metal enclosures, water \nsump and sump housing with elevated levels of corrosion all surfaces need to be \nre coated, the fill membrane which is the original to the towers installation needs \nto be replaced due to excessive mineral deposits. The tower spray header and \nspray nozzle should be repaired to assure proper water flow on fill membrane. I \nwill contact JB Henderson to provide a proposal for this work. \n2. Pool Pack Unit: The pool pack unit form the original installation was undersized \nfor the pool room area, due to electrical restrictions this unit was the largest single \nphased unit available at the time. This unit has had to overwork to keep the \nhumidity in the pool area in range due to insufficient air flow from the unit to the \noverhead air grills and floor air diffusers. The way pool pack is designed to work \nit washes two of the largest wall spaces on both sides of the pool with a curtain of \ndry dehumidified air and also pool water is piped into the unit for heat removal \nand to help preheat the pool water. The pool water was never piped and \nconnected to the pool pack unit. In the past few months the pool pack has \nexperienced many mechanical and electrical problems due to many power dips, \npower outages, and the inadequate original design. Manolito and Wendy have \nhad JB Henderson replace the system compressor, main electrical circuits, and \nrefrigeration expansion valves to keep the current unit operational. On my visit I \nhave found additional operational issues with the pool pack — no discharge air \nfrom the unit is entering above the pool area. A very poor flow of air is coming \nout of the floor grills below the french doors, I found a very poor suction pressure \non the return air side of the unit which I removed the air filters to increase the air \nflow across the unit until we find a more suitable filter material. The reheat coil \nwhich is on the discharge side of the unit which has very limited access and is \nvery dirty and clogged this is restricting the air flow into the pool room, no \nexhaust air duct or exhaust cycle was ever installed to the unit to help provide \nwith air changes to the room. So after all the money spent this year just to keep \nthe undersized pool pack in operation and all of the additional work that still \nneeds to be addressed, I feel this unit will never do the proper job of keeping the \npool room properly dry when the Jacuzzi spa is in operation. When the spa is not \nrunning the unit just gets by. I recommend JB Henderson propose a new larger \nunit that is now available and address the air flow issues in the pool room area. I \nwill have them provide a proposal for the unit replacement. \n3. HVAC Building Management Control System (Inet 2000) — This control \nsystem has been very dependable and has operated since the house opened under \nvery harsh conditions with power outages, power dips, and electrical storms. In \nthe past 12 years we have only done one upgrade to the system software. Before \nEFTA00587677\n", "char_count": 3443}, {"efta_number": "EFTA00587677", "page_number": 1, "text_content": "and during Mr. Epstein's last visit to the ranch we have had two main control \npanels fail and need replacement. This has also caused various programming \nissues that have thrown the room set points and heat pump operational parameters \nout of range which is causing the overall house to feel unbalanced in all rooms. \nThe current systems technology is 12 years old, back in May I provided a \nproposal to upgrade the entire control system. This new system will give the \nproperty betterprotection with critical alarm with dial out features to ranch \npersonnel, \nand myself when critical equipment fails. I recommend \nthe proposed upgrade to the control system that was sent out to ECI on May 18th, \n2012 for the replacement of the existing Inet 2000 with the new Delta control \nsystem for $48,730.56. This upgrade is very important to the remote operation of \nthe property from New York and LSJ. I will go back to providing daily offsite \nmonitoring to Zorro Ranch from New York to assure the system is operating \nproperly. \n4. Heat Pump Units with Reheat System: All units have been operating since \nhouse has opened and they all have been properly maintained. We will start \nseeing compressor and electrical problems due to many years of power outages \nand dips. We will address these problems as they occur. \n5. Main Electrical Distribution and Motor Control Panels: After years of power \noutages, power dips and electrical storms I recommend to have a qualified \nelectrician come in and do preventative maintenance on all main panels, tighten \nall connections and do an infrared test. I will have JB Henderson provide a \nproposal for this work. \n6. Main HVAC Pump Room: This pump room provides water for cooling and \nheating to heat pumps and reheats hot water to all room zones. The main control \npanel for the operation of all the pumps needs service. All relays hand off auto \nand computer interface relays need to be checked for operational issues. I will \nhave JB Henderson provide a proposal for this work. \n7. Fire Safety System: All smoke detectors need to be tested and cleaned by a \nproper fire system company. I will try to schedule with \nfor my nest \nvisit to Zorro in October. \n8. Preventative Maintenance Contract: As you are aware JB Henderson is a \nmechanical contractor looking over the needs of the ranch mechanical systems. I \nsat in on a meeting with them on Thursday, August 23nd, 2012. This company is \none of the better mechanical and construction contractors in New Mexico. I feel \ndue toBrice Gordon nor I being on the property on a daily basis we need to rely \non JB Henderson for preventative maintenance and emergency repairs. To keep \nin good standings with this company all outstanding invoices need to be \naddressed. \nEFTA00587678\n", "char_count": 2766}]}