{"efta_number": "EFTA00584527", "page_count": 2, "url": "https://epstein-data.com/EFTA00584527", "pdf_url": "https://epstein-data.com/pdf/EFTA00584527.pdf", "pages": [{"efta_number": "EFTA00584527", "page_number": 0, "text_content": "JE Punch List - July 9, 2012 Directives\n1. Clean up\n- Shed and its Workshops\n-Make as many barge runs as necessary\n2. Equipment and Vehicles\n- Sell equipment\n- Buy new Kawasaki bikes and mules\n3. Computers\n- Buy new computers\n4. Five Palms\n- Chains hung at Five Palms\n- Internet - Danny and Little Danny terminating fiber-completed and light tested 6/29\n- Jermaine will confirm internet and phones after the CISCO 3560 switch is installed - switch ordered\n7/5 - EDA at 71st on 7/11\n- what is the status?\n-Exterior Door Shutters-removable option required - hurricanes\n- Painting - outside to be completed via JE direction\n- inside to be completed via JE direction\n- Furniture - Sofa - leather sample selected by JE, will review when next on site\nOutside furniture ordered\n-Tapestry Molding for Ceiling - lon\n-Transformer building - Building 5/31, 5/25 - final electrical hookup 6/8 - temporarily powered by generator\n- Fire pit - Burner and plate on site - starter/igniter is missing have contacted company new one to be sent -\nwhat is the status?\n-Cabinets- add push latches on doors - still to be installed\n5. Grotto\n- Floor resin white - due to no water/cleaning issue - review Spanish Tile option, some on site\n- Genset wiring-scheduling to be determined\n6. Berm/Top of Hill\n- Landscaping - Peter to line top of hill with boulders and hydroseed as much as possible\n- Paint - will move forward when dry\n- Entry rocks - COMPLETE\n- Wood boundary-12ft boxes around trees after shield installation\n- Electrical - Panel Low Lighting to be completed - waiting for transformer\n7. Engineering/Maintenance Yard\n- Metal Sheets - on old building will be replaced during upcoming visit\n- Engineering storage & shelving - work to start when carpenters available\n8. Triangle - landscaping direction required from JE\n9. Flagpole Pool Cabana-\n- Furniture - glass desk from NYC set up 6/29 - JE to review\n- relocation of existing desk to the Chillax room - JE to review\n10. Floating dock\n- Jet ski dock - jet ski fenders?\nWooden fenders - COMPLETE\n- Table/Dock Box - dock box handles\n-table/seat top last coat of sealer applied 6/28\n- draw baskets, doors & hinges all on site\n- draw sliders/hardware at 71st Rich B is forwarding - on site 7/2\n- completion expected 7/6\nEFTA00584527\n", "char_count": 2267}, {"efta_number": "EFTA00584527", "page_number": 1, "text_content": "11. Entry Tree Lights - COMPLETE\n12. Solutions for Generators - wall built, soundproofing on LSJ 7/6\n13. Tiki - Darren is contacting the vendor regarding the shields - require update\n14. Kite House-review of wooden outside furniture - Sarah\n15. Chillax Room - requires furniture piece for electrical/media equipment - Sarah\n16. Chillax Bathroom - requires blue rugs for bathroom & vanity area - Sarah\n17. Mechanical Building\n- Replacement Transformer - estimated date to be shipped from factory (Illinois) 8/21\n18. Boats\n- Lady G (Fat Cat) - refurbish\n- Midnight Express - in water\n- Lady K - sell\n- Big N - sell\n- Calypso - sold\n19. Timers - review installing timers on air conditioners, irrigation water systems, and lights\n20. Beach lighting-per JE, replace existing transformers for the beach lighting of palms around the salt pond\nand beach\n21. Main compound\nKitchen door - needs repair\n-Wind doors - on kitchen side needs openers and wind door stops - Brice purchasing in NM - did not happen\n22. Landscaping-Josephine to visit and organize garden\n23. Solar lights - Brice to order 500 landscape lights-schedule for solar lights\n- should be placed every 30 feet - order\n24. Roads-grade - Jules work continues\n25. Library\n- Lights on bookshelves need attention - will review with Danny\n-Temperature - STABLE\n26. Main hill\n- Asphalt path - edge and end asphalt properly - proposed suggestion forwarded from Monique\n- Needs top and bottom\n27. Master Suite\n- Large master bed planting\n-Put self-closing hinges on the master bedroom door to the outside - says COMPLETE but not done\nAir conditioning needs a refill at the master - it is very humid\nNight lights to master from kitchen do not work\n28. New Employee Bathrooms\n29. Gym\n-Add new doors in yoga and ballet room closets - COMPLETE\n- New punching bag - due 7/9\n- Clean up electronics/stereo - Jermaine\n30. Benches\n31. Office Pavilion - East window in Sarah's office is rusted outside - COMPLETE\n32. Danny Vicars - schedule boat driving lessons\n33. Heli Pad - fix and replace lighting - COMPLETE 7/5\n34. Hangar\n- Jermaine to redo internet at hangar - quotes expected 7/6\n- Hangar pad to be built\nEFTA00584528\n", "char_count": 2164}]}