{"efta_number": "EFTA00578393", "page_count": 13, "url": "https://epstein-data.com/EFTA00578393", "pdf_url": "https://epstein-data.com/pdf/EFTA00578393.pdf", "pages": [{"efta_number": "EFTA00578393", "page_number": 0, "text_content": "WEEKLY REPORT \nFRIDAY SEPTEMBER 6, 2002 \nACTION POINTS REOUIRING JE's COMMENT \n71ST STREET \ni) \nJE to still use the Thalgo massage table heating blanket before advising if we are to \npurchase for any other property. \nZORRO \nii) \nis aware that the tent needs to go near Hogs Back but is unsure where — please \nadvise? \niii) \nWhere would JE like the Ponce de Leon placed, or should this be placed in storage? \niv) \nOn discussion between GM, \nand NS, it was agreed that a further two vehicles \nfor the ranch are required with regard to the transportation problem encountered during \nJE's previous visit — namely a Tahoe and Suburban. JE to please advise if it would prefer \nus to source new or used vehicles? \nv) \nJAI \nhas a further quote for the electric portion of the plumbing project from Broken \nArrow in the amount of $6,900.00. This is the best quote she has received as the other \ntwo quotes were $12k and 14K. JE to plse approve. \nvi) \nNanna — This is repaired and in the water. The boat needs to be detailed and cleaned \nwhich involves teak deck dressing etc. This is scheduled for next week. Due to the \npending visit, I can put this project on hold. Please advise? \nvii) \nHot Tub — This has been installed. Mr Epstein requested that the temp be increased. The \nprogramming pumps and solenoids are designed for the current temp. The temp is set at \nthis maximum level to avoid any liability claims for injury caused by the water getting \ntoo hot. To increase the temp further would require extensive alterations. Is Miles to go \nahead? \nviii) \nThe plans calling for a wooden gym have been altered to allow for the use of cement \nfloors and walls. JE would like the outer face of the building stoned as per main house. \nThe structure will remain the same in terms of structure and dimensions. This has been \napproved by JE. \nProgress - Miles has started the process of moving the existing gym to a new location. \nThis should be completed by Friday September 6. Thereafter they will start the g\n... [truncated, 2304 chars — for the full page use /api/corpus/document/EFTA00578393/0 or ?id=EFTA00578393&page=0]", "char_count": 2304}, {"efta_number": "EFTA00578393", "page_number": 1, "text_content": "PALM BEACH \nix) \nThe quotation for the landscaping lighting has been received in the amount of \n$2,717.00. Please approve. \nx) \nSmall gun safe with a digital pad for the remainder of the weapons still to be purchased. \nThe quotation received from John was $1,100.00. JE to please authorize? \n********************************** \n2 \nEFTA00578394\n", "char_count": 344}, {"efta_number": "EFTA00578393", "page_number": 2, "text_content": "FORTNIGHTLY REPORT \n71st STREET \nA. Restoration / Waterproofing \nSame \n0 \nRichard approved the tinting on the dutchman repairs and work will \nstart Saturday 7 September and this should only take one day. \nB. Front Door Hardware \nto \nAlmost complete except for inactive door, need to modify the spindle \nthat holds door knob. Locksmith will come in and add half inch to it. \nWill complete the hardware on Monday, and staining on Wednesday. \nC. Security \nin) \nInstallation will be complete by next Friday once they have worked \nWednesday through to Friday due to JE being in-house. Security \nProducts is currently working around JE's schedule. \nD. General \nSame \niv) \nTelephones — the Sawyers brothers are both working now NS is \nsetting up a meeting between Sawyers, NS and Richard to resolve the \ntelephone issues now. They previously advised as follows: \nI. \nWhen doorbell rings, beeper system on staff belts will vibrate. \nTom advised NS today 6 September that he has investigated a \nsimpler system at a better price. This will be discussed further at \nthe meeting. \n2. \nJE has advised that the two buttons on the telephone that will be \nlost are the Tahoe and Merc buttons, enabling J.E. to gain home \nand away modes. These buttons will enable JE to press \"away\" \nmode (call forward) and \"home\" mode when he is in house. We \nhave requested Sawyers to advise when they will be able to \ninstigate this and they are still to advise. Pat from Sawyers has \nadvised that we change the colour of these two buttons to green \nfor \"away\" mode and red for \"home\" mode. \n3. \nSawyers are still investigating an \"address book\" storage for the \ntelephone. GM has now authorized Sawyers to source an address \nbook storage of 400 — 600 names. We are awaiting this. \niv) \nWireless Network Computer — This has been removed from 7 Is' \nStreet and installed at 656' Street. \nGM has requested that Pinto prepare coloured boards for the entry \nhall of 71s' street. We have heard nothing back from Pinto on this. We \nwill\n... [truncated, 2138 chars — for the full page use /api/corpus/document/EFTA00578393/2 or ?id=EFTA00578393&page=2]", "char_count": 2138}, {"efta_number": "EFTA00578393", "page_number": 3, "text_content": "vi) \nJE advised that Pinto was to make the table cloths and overlays for \nthe dining room and a fax has been sent off to request him to do this. \nWe will chase when the offices open in September. GM has heard \nnothing back from Pinto on this and will address this with him \nvia) \n& her boyfriend — \npassport has not been \nissued yet. She expects it within the next 2 weeks. Her boyfriend has \nadvised that he can now travel and spend a month in the States. He \ncan go to the Island in that time and make recommendations if you \nwish. \nLighting - NS spoke with David Rockwell again. David is coming up \nwith a proposal which should be with us by Friday 13'h September. \nPARIS \nOld Apt \nGM has received no update from Pinto's office on the Paris apartment. \nSame \ni> \nFat Lady Painting —Jean to change the frame \nSame \nii) \nNew carpet for boudoir. \nSame \niii) \nPainting of boudoir. \nSame \niv) \nPainting in loo off boudoir — GM was advised when she was in Paris \nthat the painting would be done in September. \nSame \nv) \nRoot chairs — Jean does not like the root chairs. \nSame \nChandelier in master bathroom will now only be arriving in \nSeptember. \nSame \nvii) \nJean to purchase a desk lamp for the new desk. \nSame \nviii) \nDining room collection — JE advised to use existing collections \nSame \nix) \nRolling cart — GM to source and purchase. \nx) \nHarlequin & Crystal Skull — Arrived \nSame \nxi) \nBasement areas to cleaned and fixed up. \nSame \nxii) \nBoth computers are still to have card readers re-installed. \nSame \nxiii) \nA small box of some sort needs to be created for the light control next \nto GM side of the bed. \nSame \nxiv) \nShoe rack for JE closet. \n4 \nEFTA00578396\n", "char_count": 1668}, {"efta_number": "EFTA00578393", "page_number": 4, "text_content": "Same \nxv) \nPurchases: \n• \nDoorstop \n• \n2 x Tissue Holders \nGM to do \nxvi) \nPhotos needed for the Apt: \n• \nTwo 8 x 10 \n• \nOne 12 x 8 \n• \nFour 7 x 5 \n• \nEleven 11 x 15'/z (horizontal) — replace pictures on hall wall by \nguest bed \nSeven 11 x 151/2  (vertical) - replace pictures on hall wall by guest \nbed \n• \nNine 8% x 13 — replace African frames \n• \nThree 71/4  x 101/4 - replace African frames \nNew Ant \nSame \n65th STREET \nxvii) \nDoor codes have been changed. \nxviii) \nJE advised that the air-conditioner in the master bedroom was still \nbroken — GM still has no update. \nxix) \nGlobe desk will be raised but we have no time frame yet. \nxx) \nJean to buy small table & chairs from Habitat to accommodate the \nLSJ model as per JE instruction. \nxxi) \nNo schedule yet on the new apartment — the apartment schedule will \nbe sorted out when GM meets with Pinto in October. \n1. Items ordered from Chiaso: \nLadder for office — still backordered. Shipment has been further still \ndelayed and will chase again week of 12'h September. \nBackgammon set — still backordered. Will chase again week of 12th \nSeptember. \nSame \n2. Bedside table and TV unit in master bedroom — GM has found nothing \nsuitable yet. \nSame \n3. Security Products - JE approved the proposal and the installation will \ntake place once 715' Street installation is complete. In the rear yard two \nsensor lights will be erected by Rich. \nKINNERTON \n4. Wireless system — this has been installed at 65'h and is working in the \nentire house. \n1. DVD Player — this has been installed and is working in GM's room \n5 \nEFTA00578397\n", "char_count": 1580}, {"efta_number": "EFTA00578393", "page_number": 5, "text_content": "2. Paint walls in the living room. This has been done and they will be \nvarnished next week, 91h —13th September. \n3. Range Rover — this is due to be collected by Ray today. \nZORRO \nWater Pump \ni) \nThe pump is in and they are waiting for the pitless adaptor (not \nexpected till Oct). If we need to put the pump in before it arrives we \ncan rig it temporarily and then fix it the correct way when it comes in. \nSurvey \nElectricity \nSame \nSame \nii) Darren has now consent from all landowners, and he has sent the \neasements documents to the Electric Company for their approval. The \nsurveyor will be able to complete the survey once the Electric \nCompany has approved the easements. \niii) We cannot proceed further until the survey is complete and approved. \nThis can only be done once all easements have been signed allowing \nthe surveyor to survey over their land. \niv) \nhas a further quote for the electric portion from Broken \nArrow in the amount of $6,900.00. This is the best quote she has \nreceived as the other two quotes were $12k and 14K. \nv) Land use permit in hand. \nvi) Building permit in hand. \nvii) Slab has been poured for the building housing. The building was \noriginally scheduled to arrive August 30'h but was delayed, and we \nexpect delivery Monday September 9. \nviii) Expected date to erect building is September 13. \nix) Plumbing — \nhas received three quotes on three options, find \nattached. Gary Kerney has recommended that we go for Option 2 at \n$102,680.00 as opposing to the initial suggested quote of $50,680.00 \n(Option I) which was to tie the new water system into the existing pipe \nline. This pipe line was installed by the Kings and has the following \nproblems: \na. The line is not buried below the frost line resulting in pipes bursting \nduring winter, resulting in continual repairs. \nb. Due to point a the pipeline has numerous patches and would not \nstand the pressure of the new water system. \nNS requested \nto obtain a detailed breakdown of this amount \nas JE fe\n... [truncated, 2083 chars — for the full page use /api/corpus/document/EFTA00578393/5 or ?id=EFTA00578393&page=5]", "char_count": 2083}, {"efta_number": "EFTA00578393", "page_number": 6, "text_content": "days to get the breakdown and has promised the quote on Monday \nSeptember 9. \nI agree with Gary Kerney assessment and would also recommend \nOption 2. Mobilization would take at least two weeks once the contract \nhas been signed. \nSame \nSecurity \nHangar \nMovie Theatre \nSame \nEntry Gates \nx) Once the building is in place the following will happen: \na. Electrician will get a permit (should take 2 days) \nb. Electrician will then commence the installation of the meter box \nand circuits inside the building. \nc. Inspector will come out and view and approve (depending on their \nschedule they can usually come within 48 hrs of being called) \nd. We will then be ready to tie into the 3 phase power. \nxi) \nSecurity guard — Awaiting decision from JE and GM. \nxii) \nSecurity gate — This project was suspended until the entry gates \nfor the Zorro house are complete. Mike can start on entry gate \nOct. 1. \nxiii) \nSecurity camera - \nmet with security camera people last \nweek but was not pleased with the ideas put forth by the camera \ncompanies and is meeting with a further company on Friday \nSeptember 6. (they come highly recommended). \nxiv) \nFence - Fence is on hold until September 10. Mano has spent the \nlast week on car repairs. He will start helping Mike with the entry \ngates on Friday September 6 then he will then return to work on \nthe fence September 10. \nProject has not moved forward. JE to appoint someone to design \nbuilding. \n40ft Digital Screen - NS spoke with Caroline (Michael Bay's \nassistant) who advised that he is away filming on location at the \nmoment. Caroline has said that she will make and some calls and \nget the information for Nick. She will call as soon as she has the \ninformation. \nxvii) \nMike is working on the entry gates. Mike has cut the vertical \nposts and has started to bolt them together. Mano will start to dig \nthe holes Friday September 6. They will be set in the holes \nSeptember 9 and pictures will be sent. \n7 \nEFTA00578399\n", "char_count": 1969}, {"efta_number": "EFTA00578393", "page_number": 7, "text_content": "Same \nGeneral Items \nSame \nxviii) \nFountain — GM sent a fax and email to Pascal per your request. \nYou wanted the look to be something big, and present it you \nwhen he found it. \nxix) \nJE authorized NS to purchase of three more handguns to enable a \nweapon to be kept in each vehicle. \nhas received a quote \nfor the cost of 3 handguns - $2,399.85. There is a 3 week delivery \ntimeframe. \nxx) \nPew will be started first week in October. \nxxi) \nMap - Arrangements are being made to have Adam redo the map. \nAdam was supposed to come to the ranch September 4 but he had \ncar trouble so he will be out September 9. \nxxii) \nMicrowave Tower — Val Comm has still not figured out the \nexact problem. \nxxiii) \nT1 Lines - There has been a hold up establishing the account. \nEric spoke to Time Warner on Tuesday and was able to give them \nmore information that they needed. Still looking at 2 weeks. \nxxiv) \nStaff Uniforms - NS & GM to investigate concepts and designs. \nxxv) \nMedical cards have been logged in from last visit and will be \nsent to Nick in NY. \nxxvi) \nis currently setting up medical training of staff through \nher husband. He is also investigating a new medical emergency \nkit for all properties and aeroplanes. \nSame \nxxvii) \nJE for info — Tamara & Jeff's last working day will be October \n3nd. \nLSJ \nCarpentry \nSame \nSame \n1. Yoga deck — JE does not like proposed canvas awning. Miles/Bruce to \nsource alternative covering. \n2. Cushions and coven are being made by the same company that is \nproducing the seat covers for the electrical cars, and when the company \nasked what would need to be ready first, Bosco advised that the seat \ncovers should take priority, so the cushions and covers will only be \nready once the seat covers are complete. \n3. Floating Dock - Additional floats have arrived on island. This project \nwill be commenced whilst cement work for the new gym is drying. \n8 \nEFTA00578400\n", "char_count": 1910}, {"efta_number": "EFTA00578393", "page_number": 8, "text_content": "Same \n4. Lookout house (Blue) — a sliding door of some sort is to be created to \nprovide privacy. Entrance to be hidden. \n5. Twin railings on all steps — master bedroom building process is \ncompleted. The painters will be completing the project next week. \nSame \n6. Build a side screen on the master bedroom wind protected deck and \nmove steps to accommodate the addition. \nSame \n7. Great room wind protected terrace area - build a wooden wall below \nthe wind weave to accommodate the new doors. This is in progress \nSame \n8. Experiment with plexi-glass weave to protect from wind and also allow \nview. \nBoats \nSame \n1. \nLarry and NS still working on boats and setting up trial of Magnum 50 \nin Long Island. NS has spoken with the boat dealer. At this stage the \nMagnum 50 has been taken out of the water for winter. NS is still \nendeavouring to set up a trial. \n2. Nanna — This is repaired and in the water. The boat needs to be \ndetailed and cleaned which involves teak deck dressing etc. This is \nscheduled for next week. Due to the pending visit, I can put this project \non hold. Please advise? \n3. Ms Maxwell, Cathy and Miles looked at a number of boat yards in \nPuerto Rico. There were a few boats of interest and information about \nthe boats has been sent to Ms Maxwell via FedEx. \nLandscaping \n1. Bali shipment — The shipment is due to arrive in St Thomas on the 12th \nSeptember. \n2. Grass path - this is being completed. \n3. JE has signed a letter of agreement with Madison Cox Design Inc. who \nwill be doing the landscape design services. NS has sent a copy to \nCharles Miller and a signed copy back to Madison Cox and has \nrequested Eric pay the $40k deposit. \nHousehold \nSame \n1. Erect eight bamboo flagpoles — the design from Ed Tuttle has been \nrefaxed to Miles as he could not locate ES' previous fax. \n2. Sea-life scenes — Artist has been working again this week and has made \nprogress. \n9 \nEFTA00578401\n", "char_count": 1920}, {"efta_number": "EFTA00578393", "page_number": 9, "text_content": "3. Hot Tub - This has been installed. Mr Epstein requested that the temp \nbe increased. The programming pumps and solenoids are designed for \nthe current temp. The temp is set at this maximum level to avoid any \nliability claims for injury caused by the water getting too hot. To \nincrease the temp further would require extensive alterations. Is Miles to \ngo ahead? \n4. Install glass garage type doors on the terrace below the great room to \nprovide a movable clear wind screen. Bruce is researching materials and \ndoor samples. \nResearch and im estivtion \n1. \n2. \n3. \nSame \n4. \nMiscellaneous \n1. \n2. \nSame \n3. \nSame \n4. \nSame \n5. \nSea Water Pump on trailer to assist with filling salt pans, fires etc —\nMiles and Bosco have found nothing suitable yet. \nWind Generator — Tower has arrived on island and is being installed \nthis week. \nMaintenance and Storage Shed — JE has approved this and has been \nordered. Cheque has been sent. \nMiller advised that it is premature to go to Puerto Rico to view stone \nsamples as even if he finds suitable stone there is no guarantee he will \nbe able to get the quantity needed, so until such time as the quantities \nare available, it is not worth his going. \nNew Helipad light fixtures are on order and should be on island by \nend next Friday 131h September. \nTelephone system has been repaired. We are now preparing to move to \nfull digital interface. This was scheduled for this week but the local \nauthorities have not completed their tasks yet. We have rescheduled for \ntwo weeks (20'h September). \nInstall music systems in all electrical cars — JE advised we are to go \nahead and install the sound systems in all the buggies and to have white \nseat covers installed. This is currently being instigated and the seat \ncovers are being made. \nModel of LSJ which Ed Tuttle is doing will be completed — this was \ndelayed and is not expected until second week in September. \nSecurity — puppies arriving at the beginning of September and will \nneed to be trained l\n... [truncated, 2086 chars — for the full page use /api/corpus/document/EFTA00578393/9 or ?id=EFTA00578393&page=9]", "char_count": 2086}, {"efta_number": "EFTA00578393", "page_number": 10, "text_content": "6. Chinese Lanterns — Miles to place them at various locations on the \nisland where he thinks it suitable for JE's next visit. \n7. Moroccan lanterns they have been purchased and are being shipped to \nLSJ — advised that these should arrive in St Thomas next week (20th \nSeptember) as shipping was delayed in NY. \n8. Courtyard Lighting \nInstall hidden spotlight in the pagoda against the blue room/bedroom \none shining towards the swimming pool — light must not be seen from \nthe left or right hand side of the courtyard. \n9. Parrot at entrance — build an octagon with 6 foot sides and 6 foot \nheight and install hidden lights on four corners. \n10. Design and construct one page instruction guide on use of the radio. \n11. The plans calling for a wooden gym have been altered to allow for the \nuse of cement floors and walls. JE would like the outer face of the \nbuilding stoned as per main house. The structure will remain the same \nin terms of structure and dimensions. This has been approved by JE. \nProgress - Miles has started the process of moving the existing gym to \na new location. This should be completed by Friday September 6. \nThereafter they will start the ground work and layout. Miles would like \nJE to give final approval to the layout before we start to pour the \ncement. This layout should be ready for the next scheduled visit, being \n13 September 2002. If not, the view from the new gym will be the \nsame as the current gym. Is this in order? \nOutside contractors \nI . steam room and the great room doors and plans. JE requested \nfurther changes to plans - we are awaiting these from Springline. \n2. Move the master bedroom shower pump to accommodate steam room. \n3. Miles is awaiting a decision on the generator to be used. This will cost \nin the region of $12,000.00. Ensure that the steam generator creates \ntwice the capacity required. Interior is to be completely tiled in white \nand the exterior is to be plastered and painted. \n4. Boilers - If an electrical unit for the ste\n... [truncated, 2519 chars — for the full page use /api/corpus/document/EFTA00578393/10 or ?id=EFTA00578393&page=10]", "char_count": 2519}, {"efta_number": "EFTA00578393", "page_number": 11, "text_content": "5. Employees of local government agencies were on island on Thursday. \nThe purpose was to inspect the core sample sites of the proposed new \nhouse location on top of the hill. Secondly to inspect the intake and \noutflow systems for the RO plant. I am expecting a report back from \nthem next week, 9th — 13th September. One comment that I think needs \nto be communicated was made regarding the proposed area for the new \nswimming pool and pavilion. There are core sample sites at this area. \nThe comment was \"I think that you will meet resistance to the proposal, \nas this is still a wet land even though the salt pond aspect appears to be \ndead\". \n6. Ed Tuttle — to supply design of beach house pool design. NS sent a \nfurther fax on the 6th September to Mr Tuttle. \nSame \nSalt Pond \nDock \nItems to purchase \nSame \n7. Refer to letter sent by Kevin Qualls to Miller regarding the time lines \nfor the pool and temporary residence — rough time line and can be \nchanged at any time. Darren is aware of this. \n8. NS has sent a fax to Charles Miller relaying that JE requires Ed Tuttle \nto do any and all design work for LSJ, and that Springline should only \nbe used for drawings once Ed Tuttle has done the design work. \n1. Ed Tuttle drawing 2 pavilions for either side of the pond — fax sent 6/9 \nrequesting update on when we can expect these. \n2. Source and purchase 10 x 50 gallon drums of Pond Clear and algae eater \nto be used in the salt ponds. \n1. Dock Demolition - Miles received a call from Charles Miller who \nindicated that the dock demolition process is scheduled for next week, \n9th — 131h September. I cannot verify this with the builders. \n1. \nPurchase an ambulance/first aid vehicle authorized for the island -\ncheque to be sent on Friday, 6 September. \n2. Purchase additional gardening equipment authorized per JE - cheque \nsent. \n3. Heli pad shelter — JE has instructed that Miles utilize a local architect \nto design a shelter using cement blocks. Proposal to be sent through to \nJE. Mi\n... [truncated, 2179 chars — for the full page use /api/corpus/document/EFTA00578393/11 or ?id=EFTA00578393&page=11]", "char_count": 2179}, {"efta_number": "EFTA00578393", "page_number": 12, "text_content": "indicated that it would take approximately 3 weeks to process. This was \ndelayed and Miles will investigate week of 9th - 13th September. \nMosquitoes & \n1. Dan Ariaz will travel to LSJ 14th — 17th October to review the mosquito \nSandflies \nand sand fly problem and put forward a proposal for JE to review. \nOngoing\n1. Repair the work done on beach two. \n2. Continue stoning roads. \n3. Complete installing wipers on Seamore. \n4. \nInstall weights on New Holland tractor. \n5. \nRepair master bedroom rain gutters \nPALM BEACH \n1. \nSmall gun safe with a digital pad for the remainder of the weapons \nstill to be purchased. The quotation received from John was \n$1,100.00 so NS will have the new and these handguns will be locked \naway in the safe when JE is not in house. He will purchase this on \nTuesday 27 August. \n2. Couple for PB — Pedro & Imelda — this couple will be arriving and \nstarting at PB next week 10th September. \n3. Gardens — The new landscaping has been completed. \nThe quotation for the landscaping lighting has been received in the \namount of $2,717.00. \n727 \nSame \n457 Madison \n1. Morrison still looking for a person to install the different style blinds. \nOn hold until different style is found. \n1. JE wants a decorator to come up with a scheme for his office, but not \nPinto. Keith Hobbs will be back in New York over the next week or so \n(+1- 23rd September) and he will advise on progress he has made with \nregard to his proposal. \n2. 4 Green velvet chairs have been recovered and have been delivered. \n****************************** \n13 \nEFTA00578405\n", "char_count": 1572}]}