{"efta_number": "EFTA00578213", "page_count": 23, "url": "https://epstein-data.com/EFTA00578213", "pdf_url": "https://epstein-data.com/pdf/EFTA00578213.pdf", "pages": [{"efta_number": "EFTA00578213", "page_number": 0, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nJE \n2/27 Talk to Ricardo about the roof tile designs for \nlandscape beds \n3/31 Per GM - GM sent Ricardo fax. \nJE discontinued the services of Ricardo \nJE meeting with new designer \nJE \n3/30 Grading at Main house and the new road design \nJE to decide if the grading is correct and to \napprove the way the road forks on the way \nto the guest lodge \nJE \n3/29 Finish the Bowl Garden planting \n3/29 Eden would like to plant the remainder \nof plants in the bowl garden. The cost will \nbe $564.00. Approved 4/2 per JE \n4/2 \ninformed \nJE \n3/29 Petroglyph rocks moved to the main house \n3/30 One rock has been brought up and \nplaced in the old dog yard. JE to let us \nknow the size, location and how many \nrocks he would like. \n4/2 Jeff to find larger rocks. The one rock \nwe have should go next to the chess set. \nJE \n3/30 Paddock area and stables at Main House \nDoug has provided sketches, how would \nyou like to proceed? \n3/30 There has been no progress \nJE \nConstruct North Terrace at Main House \nMonarch is taking out the wa11s3/14 \nMemo from Mil sent to JE 3/19 re: paving \n3/22 waiting for instructions \n2/23 JE approved the $5,183.00 quote for \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues Fe- Future Construction Issues \n11Th House Manual \nEFTA00578213\n", "char_count": 1385}, {"efta_number": "EFTA00578213", "page_number": 1, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nSORT ASSIGN. \nTO \nDATE & DESCRIPTION \nSTATUS \nPROJ. \nCOMP. \nDATE \nconcrete. We are waiting for the 200 pieces \nof stone to arrive before they can lay the \nconcrete. Stone should arrive in 2 weeks \nApril 7? \n3/31 JE would like to keep the flowerbeds. \nto get. \nto irrigate and plant \nground cover. \nwill be out 4/7. \n4/2 Bradbury has stopped work due to non-\npayment. \nJE \n3/29 Seed the remainder of areas at Main House \n3/29 Seeding can begin after May 15'h. \nCost $37,200.00 \n3/30 Quote sent SeedingMH.doc \n4/2 \nto get second quote per JE \nJE \n3/30 What should happen with the ponderosa pine \ngravel and lights? \n3/31 Jeff to build dog fence around the \nponderosas. \n4/2 GM left message for JE approval for \n$3000.00 line locator \n4/2 ,fioved line locator \n4/4 \nordered line locater, it should \narrive 4/9 and Jeff can begin \nJE \n2/27 Replace all outside globe light fixtures \n3/31 Advised by GM that JE asked GM to \nget in touch with Ricardo but now that \nRicardo is no longer consulting she does not \nthink they will get the information. GM has \n4-5 large catalogs in New York for JE to \nlook at next week. \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n2 \nEFTA00578214\n", "char_count": 1287}, {"efta_number": "EFTA00578213", "page_number": 2, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nJE \nJE \nJeff \n2/27 Purchase light fixture in UL ceiling it should tilt \nand shine on easel \nJeff purchased 3/10. \n3/30 JE to approve light fixture \n4/2 Jeff to purchase more fixtures for \napproval. \nJeff \n2/27 Purchase flood lights over terrace, MB balcony, \nback wall at library \nJeff purchased 3/10 \nJeff will ex lain installation procedure to JE \n3/31 \nto get quote \n4/2 and 4/4 Message left for Service \nElectric \nJE \nMike \nJeff \n3/30 In the upper library: the paintings on either side \nof the library entrance needs to have lights on the \nbottom \n4/2 \nto have electrician wire \nproperly \nJE \n2/27 Purchase 52 inch picture light of the girl in the \nprincess staircase \n3/30 2-23 inch lights have been put up for \nJE approval on 3/30 visit. \nJE \n3/30 The living room gallery painting should have \ncopper colored fixtures \n4/2 \ntalked to Rich and he is \nordering 4 — 40\" lights in bronze \nRich will call with delivery date \nJE \n3/31 The desert scene painting should have lights on \nthe top and bottom in the bronze color. \n4/2 \ntalked to Rich and he is \nordering 2 — 30\" bronze lights \nRich will call with delivery date \nJE \n3/31 The living room painting needs the same type of \nlight fixture but in black and should have a halogen \nbulb. \n4/2 \ntalked to Rich and he is \nordering a black 14\" fixture. \nHe is checking to see if a halogen bulb can \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n3 \nEFTA00578215\n", "char_count": 1591}, {"efta_number": "EFTA00578213", "page_number": 3, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nJE \nbe used that fixture \n4/2 Per Rich - they do not make halogen \nlights \n3/5 Landscape lights for Main House \nAll lights have been ordered. They will take \napproximately 20 days from order date to \narrive. Expected April 4. \nleft \nmessage for electrician to call 3/19 \nMessage left 3/26 \n3/28 Electrician Scheduled for April 5th \n4/2 Jeff picking up lights \n4/4 Electrician had knee surgery and will \nnot begin until 4/11 \nJeff \nJE \n3/5 Loggia spot lights not the correct size they need \nto be replaced with lower profile lights \ncalled Service Electric on 3/12 and 3/29 \n3/15 \nPurchased new lights 3/24 Called Service \nElectric 3/26 waiting for return call \nService Electric is coming out 3/28 \nService Electric is here 3/29 \nPicture \n4/2 JE to approve the fixtures that have \nbeen installed on 3/30 visit \nJE \n2/27 Purchase picture light for the painting of the girl \nin the main stair hall. Order 4-30 inch lights per GM \n3/30 2-40 inch picture lights have arrived \nand are in .lace for JE approval. \n4/2 \ntalked to Rich and he is \nordering 2 more 40 inch gold lights \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n4 \nEFTA00578216\n", "char_count": 1316}, {"efta_number": "EFTA00578213", "page_number": 4, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nRich will call with delivery date \nJE \n3/31 Mikes priority list \nMIKES PRIORTY LIST.doc updated 4/2 \nJE \n3/30 Movie Theatre \n3/30 Doug has provided sketches, how \nwould you like to proceed? \nJE \nThe phone lines have been repaired. \nDo you notice a difference? \nJE \nWhere should the telescope be located? \nJE to decide location. \nJE \nLean too and water troft should be painted Token \nbrown \n3/28 Sample on lean too for JE approval \nJE \ni \n3/24 Paint the balustrade the same color as the main \nhouse \n3/27 Painters have put the first coat of paint \nto make it look presentable. They will \nreturn after visit if approved The cost will \nbe approximately $5,000.00. \nPicture \n3/30 The Italian painters are scheduled for \nMay. Should we hold off on painting and \nwait until the painters arrive in May? \nPlease advise. \n3/31 Leave the balustrade the existing color \nand wait for painters in May, per JE \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues IT- Future Construction Issues \nHouse Manual \n5 \nEFTA00578217\n", "char_count": 1136}, {"efta_number": "EFTA00578213", "page_number": 5, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nJE \n2/27 Purchase rugs for the east corridor across from \ndining room 4 1/2 ft wide x ? \nJE \n2/27 Purchase Estancia furniture \nJE \nJE \nJE \nEntry pillars for the Main House \n3/30 Ricardo has sketched a design, how \nwould you like to proceed? \nPool room mattresses \n3/30 JE to decide on fabric \n4/2 The mattresses have been made and are \nwaitiriiri Albuquerque to be covered. \nFind snow melt that contains OJ \n3/30 \nhas located a product that is \nmade out of corn that will not harm stone. \n4/2 JE appLoved \n4/2 \nordered \n4/15 Should arrive at ranch \nJE \n2/27 There should be something that sits on the top of \nthe heads in the hall near GM office \n3/31 JE to have a look at the heads, we \nhave placed candles, pots, and horses per \nGM \n4/1 12 1/2  inch candles should be purchased \nper JE \nJE \n2/27 Mechanical room door is warped \n3/23 Mike is repairing the door front \n3/20 \n3/23 \ncomplete \nJE \nAdam \n4/2 JE to decide where the outdoor grill should be \nlocated. Adam to purchase \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nD1- Decorating Issues FT- Future Construction Issues Int- House Manual \n6 \nEFTA00578218\n", "char_count": 1223}, {"efta_number": "EFTA00578213", "page_number": 6, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nJE \nJeff \n2/27 When the painting of the Spanish nude with \nblack hair arrives it is to be hung in front of the \ntelescope. Send picture to JE first \nPicture sent to JE 3/21 per his request. \nPicture \n3/22 \nI \nComplete \nJ fi \n.Jeff \n2/27 Purchase brown utility shed for MH \nA utility shed is needed to store water \nsoftener, outdoor tools, dollies, and other \nmaintenance items. \nThere is an area staked out for JE approval. \nWe can purchase a pre fab building for \n$7,000 or we can have Mike custom make a \nbuilding. The price would run about $4,000 \ndepending on the design and materials used. \n3/31 Mike to build per JE - send estimate \nand sketch \nJE \nJeff \nMike \n2/27 The knob on the exercise room door should be \nturned the opposite direction \n3/15 Jeff to change door handle \n3/22 Door handle has been changed. JE to \napprove on 3/30 visit \n3/23 \nJE \nMike \nJeff \n3/8 Hang the cross in the upper library \n3/22 Mike is going to look for the studs to \nsee if the cross can be centered. \n3/28 E-Mail with hanging options was sent \n3/28 We would like to wait for JE arrival \nbefore we hang the cross it is more involved \nthan originally thought. \nPicture \n3/30 JE says that the cross is to sit on a base \nand then a chain hung from the top of the \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n7 \nEFTA00578219\n", "char_count": 1491}, {"efta_number": "EFTA00578213", "page_number": 7, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \ncross and both arms. It should hang about 6 \ninches from the wall. \n4/3 Chain was ordered will be in 4/9. Mike \nreturns from vacation 4/16 and will hang \nCMS \nJE \nMike \n2/27 sketch shelves for the massage room and send to \nJE \nSketch will be given to JE on his visit 3/30 \n3/31 JE approved shelve sketch \nJE \nJE \n3/31 The heads in the living room gallery may need \nto be lit. JE to confirm. \n4/2 \ntalked to Rich and he is \nordering 4- 8\" lights so JE can decide. \n3/13 Zorro Ranch water status \nMemo 3/12/01 \n3/7 MBI is pressure testing the lines they \nshould be complete 4/7. Once pressure \ntesting is complete, MBI will give us a \nquote to put well 3&4 on line. Should Have \nquote by 4/15 \n3/30 Gary as been traveling so we have not \nreceived any information on desalination. \nis going to use her contacts at the \nuniversity to get information on \ndesalinization. \nPlease advise if you know of anyone that \nGM should call to obtain more information. \nave GM the number 4/2 \n4/3 \ncalled and spoke to Gene at \nIonic. He is sending info. on his company. \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n8 \nEFTA00578220\n", "char_count": 1296}, {"efta_number": "EFTA00578213", "page_number": 8, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nJE \nJE \nJE \nJE \nJE \n4/4 \nis going to meet with MBI on \n4/5 to go over results of pressure testing. \n3/21 The garages i t the shop area at ranch central are \nin poor shape, \nto get quote. \nJE to decide if they should be painted, if so \nwhat color? Cost $875.00 \nJE approved 3/31. They should be the same \ncolor as \nhouse. \n2/25 Get estimate to repair roads \nEstimate sent to GM and Eric 3/13 \nE-mail from \n3/21 not doing the roads \nper JE \n3/29 GM has asked us to explore other \noptions. \n3/29 Call Larry to investigate road \nequipment options to maintain roads in \nusable condition. \n3/30 Lany is going to look into rollers \n3/23 Desert Scene painting from \n3/26 Mike to hang.desert painting. Picture \n4/2 Should be lowered 5 inches \n2/27 Paint the shelves in the garage the same color as \nthe walls, per JE \n3/5 The shelves have been painted. JE to \napprove on 3/30 visit \n3/26 \nRanch Central - the stables should be painted the \nsame color as the inside \nAs soon as it warms up Bobs paint can \nbegin \n3/22 Samples on barn \n4/4 The stain color will never match the \ninside of the barn exactly because of the \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \n01- Decorating Issues IT- Future Construction Issues \n1O1- House Manual \n9 \nEFTA00578221\n", "char_count": 1354}, {"efta_number": "EFTA00578213", "page_number": 9, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \n7 \ntexture. \nGM \n2/27 Ask Pinto about the painting design for the \nbalustrade \nhas sent a memo to Pinto 2/27 \nMemo 3/5 \nleft message 3/7 for GM to talk to \nPinto in Europe \nMemo to GM 3/19 \nMemo sent from GM 3/21 \n3/23 JE would like the balustrade painted \nthe same color as the house. \n3/28 Requested quote from Bobs. \n4/2 Waiting for painters to come in May per \nJE \nGM \n2/27 Purchase new rug for pool gym hallway 41 x 6 \n3/22 GM Ordered Zebra Rug 3 weeks ago \nfrom ABC \n3/23 should arrive 3/30 er \n4/4 \ncalled M \nand she is checking \non delis \nGM \nZorro pottery \n3/30 \nM\n \nis checking on shipping date \n4/4 Should arrive in 2 weeks per\nGM \nMake new easel crank that is larger \nGM to try to locate original crank \nGM \n3/23 Mangle ironer training at the MH \n3/23 The company does not give training \nbecause it is meant for table linens not \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nD1- Decorating Issues IT- Future Construction Issues HM- House Manual \n10 \nEFTA00578222\n", "char_count": 1085}, {"efta_number": "EFTA00578213", "page_number": 10, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nsheets. The girls will practice. \nGM \n2/27 Purchase rug for library bathroom 7f1 45inches \nArrived and placed 3/15 pictures sent 3/15 \nPicture \n3/15 \ncomplete \nGM \n2/27 Purchase 15x15 rug for exercise room \nArrived and placed 3/15 \nPicture \n3/15 \ncomplete \nGM \n2/27 Purchase two more carpets for the main hall \ndownstairs they should duplicate the one that is \nexisting but with brighter colors \n3/17 We have placed 3 rugs in this area. \n3/17 Pictures have been sent for GM \napproval. \nApproved and in place 3/20 \n3/21 pictures sent to \n. Pictures \n3/20 \ncomplete \n3/31 The rugs are not correct per JE \n4/2 GM to provide return info. \n4/2 GM to purchase correct rugs? \nGM \nNeed extra sheets for the guest bedrooms at the main \nhouse (yellow and blue rooms) \n3/29 \ncomplete \nGM \n2/27 Take digital .hotos of the furniture shipment \nthat arrives from \nShipment arrived 3/7 \nDigital photos sent to GM 3/7 to ask for \nplacement instructions \nPhotos send 3/17 \n3/30 \ncomplete \nGM \n2/27 The guest hall needs more photographs \n3/30 Will arrive in 2 weeks-April 12th per \nGM \n4/12 \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues \nEC- Future Construction Issues \nHouse Manual \n1 I \nEFTA00578223\n", "char_count": 1315}, {"efta_number": "EFTA00578213", "page_number": 11, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nGM \nGM to send black and white pictures for frames in \nupper library \nPhoto dimensions 22 x 15 % inches \n3/30 Should arrive in 3 weeks-4/I9 per GM \n4/19 \nGM \n2/27 Larger photos are need for the garage \n3/30 Should arrive in 3 weeks per GM \n4/19 \nGM \n3/31 Replace glass in UL painting per GM \n4/4 Which painting needs glass \nis \nnot sure. \nGM \n4/2 Library shelf dimensions: \n4 Shelves at: Width 361/2 x H 71/2 x D 12''A \n12 Shelves at: Width 35 'A x H7 % x D12 'A \n2 Shelves at: Width 55 'A x H7'/ x D12 'A \nDI \nDI \nDI \nPinto \nCurtains for the arches in the hallway in front of the \nliving room \nDimensions sent to Pinto 3/21 \n3/30 has been shipped per GM \nPinto \n3/30 Curtains for the pool room doors \n3/30 Fabric has been shipped, \nto \nhave curtains made per GM \nPinto \nReplacement plate for estancia wall \n3/30 has been shipped per GM \n4/12 \nDI \nPinto \nLight fixture to replace 2 in JE and GM master bdrm \nhall \n3/30 has been shipped per GM \n4/12 \nMike \nPole barn enclosure \nWe can only work on the pole barn in the \nmornings because the wind picks up in the \nafternoon. \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n12 \nEFTA00578224\n", "char_count": 1317}, {"efta_number": "EFTA00578213", "page_number": 12, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nSORT ASSIGN. \nTO \nDATE & DESCRIPTION \nSTATUS \nPROJ. \nCOMP. \nDATE \n3/21 Mike has % the siding on \n3/30 Mike has' of the siding up \nPictures \n3/30 Electrician to put sockets behind paintings in the \nUL \n4/2 \nleft message with Service \nElectric. \n4/4 Message \nSeal the log cabin \n4/2 Bob's paint will begin as soon as \nweather permits \n4/10 \nDavid \n3/15 Remove remainder of the cactus piles on the \nranch \n3/30 David will begin mid April \n6/1 \nDeidre \n3/15 Purchase emergency kits for each vehicle \nordering 3/28 \nWill arrive 4/12 \nDeidre \n3/31 Painting in UL of the alley should be cleaned \n4La \nis making calls to find someone \nthat will clean paintings \nHM \nTamera and Jeff should be in the house when JE GM \narrive \nAdvised Tamera and Jeff 4/2 \nHM \nAll the lights in the main house should be on \nthroughout the day. \nAdvised Tamera and Jeff 3/31 \nHM \nDuke should be in the house when they arrive \nAdvised Tamera and Jeff 3/30 \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues IT- Future Construction Issues \nHouse Manual \n13 \nEFTA00578225\n", "char_count": 1102}, {"efta_number": "EFTA00578213", "page_number": 13, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \n7 \nHM \n3/12 Advised Jeff not to take dogs during a visit \nAdd to household manual \n3/15/ \ncomplete \nHM \nAdvise Tamera that there needs to be water and food \nfor Max at all times. Add details to house hold \nmanual \n3/15 \ncomplete \nJeff \nThe stakes for the MH drive should be 24 inches and \nhave flat tops. Around the curves they should get \ncloser together. They should have whiter square \nreflectors \nJeff will begin 4/1 \n4/2 Jeff will begin after ponderosa pine \nfence is approved \nJeff \n3/28 Jeff to power wash the diamonds in the front \nmotor court \nJeff \nThe two masks should go on the plane to 65th street \n4/2 Complete \n4/2 \ncomplete \nJeff \n3/31 The statue in the garage belongs on the mantel \nin the dining room. The plates are to be hung on the \nfireplace. Pictures sent to JE when complete \n4/4 Jeff working on. \nJeff \nJeff to measure the pool doors at the main house for \nGary \nMeasured and \nfaxed to Gary 3/13 \n3/13 \nComplete \nJeff \nCD player is being repaired \nPicked up 3/13 \n3/13 \ncomplete \nJeff \n2/27 When the large chess set arrives it belongs in the \nnorth garden \nArrived 3/8 will be placed 3/16 \n3/16 \ncomplete \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n14 \nEFTA00578226\n", "char_count": 1374}, {"efta_number": "EFTA00578213", "page_number": 14, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nJeff \n3/28The stack of wood near the microwave dish \nneeds to be relocated for the visit \nAdvised Jeff 3/27 \n3/28 \n3/29 \ncomplete \nLarry \nLarry is ordering TV for breakfast room \nTV arrived 3/7 \n3/8 \ncomplete \n3/14 Take down the TV screen in the bunkhouse \nliving rrn and put into storage \n3/30 \nto begin after Pole barn \n4/4 \ncomplete \n3/14 Hang ranch blueprints in garage \n4/4 \ncomplete \n4/2 Talk to \nre:line locator \n4/4 \ncomplete \nTalk to \nre: seed prices for MH \n4/4 \nis getting prices \nClutch on the water truck is broken \nTruck taken to be repaired should return \n3/23 \n3/17 \ncom . lete \nManoltio \nLarry \n2/28 Larry to purchase John Deer Gator for the ranch \n3/28 \nto see if we can purchase one \nin N.M. \n4/4 Eric will send a check to NM \nMike \nMike to make bases for library vestibule tables \nMike \n2/27 make 2 10 ft benches out of the timbers for the \nloggia \n4/2 Mike is working on the benches \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n15 \nEFTA00578227\n", "char_count": 1148}, {"efta_number": "EFTA00578213", "page_number": 15, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nSORT ASSIGN. \nTO \nDATE & DESCRIPTION \nSTATUS \nPROJ. \nCOMP. \nDATE \nMike \nRed doors into tables \nMike \nSand and seal tables and benches for the main house \nMike \nGuest lodge — repair crawl space enclosure \nMike \nChicken coop to be moved to area near stables \nMike \nScreen doors to be repaired at bunkhouse, \nhouse and office \nMike \nVentilation at pump pit for ranch central \nMike \nRepair French doors at Bunkhouse \nMike \nEstancia pews \nMike received JE instructions 3/14 \n4/2 Mike will begin after his vacation 4/16 \nMike \nClose in Sterilizer \nMike \nThe guest lodge sliding glass door does not lock \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues MI- House Manual \n16 \nEFTA00578228\n", "char_count": 775}, {"efta_number": "EFTA00578213", "page_number": 16, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nMike \nThe window in the log cabin is separating it should \nbe caulked. \nMike \n3/30 The tables at the MH should be sanded and \nsealed with a boat wax. Too many splinters per JE \nMike \nMike to secure paintings so they do not tilt \nMike \nBuild Motor court gates at MH \nGates have been built will be hung 3/20 \nMike is working on the pole barn — weather \nis good so gates on hold.. \nPictures \n3/20 \ncomplete \nMike \n2/27 Cover hole in wall under the yellow bedroom \nsink at MH \n3/20 \ncomplete \nMike \n2/27 Change cords on the light in the library \nvestibule to a black one \n3/5 Service Electric changed one cord Mike \nto change the second \n3/30 Mike can repair once the frame is \nrepaired, should be complete 4/10 \n4/4 Picking up today \n4/15 \nMike \nOrder steam room door sweeps \nMike has installed the sag \nbut the still \nare not the correct size. \nis working on \nlocating sweeps 3/19 \n3/21 Piece being shipped from Denver \n3/28 Digital pictures sent to \n3/30 Should arrive 4/15 \n4/15 \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n17 \nEFTA00578229\n", "char_count": 1223}, {"efta_number": "EFTA00578213", "page_number": 17, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \n3/12 Train Wolfhounds and Duke \n3/31 Dogs will begin training April 23rd \n3/30 \nto purchase a new color printer for GM 4/2 Mark is sending GM computer \noffice. Talk to Mark about the type she has in Palm \nBeach \n3/30 to purchase tie backs and brackets for the \nbreakfast mom curtains \n4/2 \nto meet with \n4/5 \n2/26 Get a price on the butternut carpet sample for \nthe bunkhouse \nwill be out to measure bunkhouse to \ngive an estimate 2/26 \nWill have prices 3/27 for GM approval \n3/31 GM approved nature wool carpet \nsample for large ranch house and \nbunkhouse. Expected installation 4/25 \nRepair transmitting station for wells. (Controls the \nwater level in the tank) \n3/20 Val Comm to give a proposal to repair \nor re . lace transmitters \n4/5 \ncalled to inquire about quote, \nleft messa e \nReplace Pool Room Doors \nhas sent dimensions to Gary. Gary \nhas been traveling but will get quote the \nweek of 4/1 \n4/4 Message left for Gary \nGM portable phone in office \nFind out how to answer the phone \n4/4 Phone is working \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues \nEC- Future Construction Issues \n11Th House Manual \nIS \nEFTA00578230\n", "char_count": 1262}, {"efta_number": "EFTA00578213", "page_number": 18, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \n3/30 The tables in the estancia should be tiled \n4/2 Vernon tile will out at the end of April \nto work on fountain and tables — depends on \nweather \nCall Ionic in Mass. And give GM the info \nRe: desalinization . Message left for GM 4/2 \n4/2 GM would like \nto call \n4/4 They are sending info \n3/31 The area beyond the north terrace should be \nseeded and graded \n4/2 \nto find a second quote \n3/31 GM computer to be moved to her upstairs office \nand another computer with a flat screen put in the \nplace of it. Mark should load downstairs computer \nsame way but with passwords. \n4/2 Marc sending computer \nJeff \nurns to be sent back to NY when delivered to \nShipped 3/6 to 71g street \n3/6 \ncomplete \nthe ranch \n2/27 Have the courtyard tree lights repaired \nFixed 3/10 — Transformer was out \n3/10 \ncomplete \nBlue Mobile home to be moved to gravel pit \nElectric disconnected 3/13 \nPhone disconnected 3/13 \n3/14 \nComplete \n2/27 Give Jeff note book for JE walk throughs \n3/15 \ncomplete \nPaint large ranch house \n3/15 the house is half painted weather \npermitting should be complete 3/20 \n3/20 \ncomplete \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues Fe- Future Construction Issues \nHouse Manual \n19 \nEFTA00578231\n", "char_count": 1337}, {"efta_number": "EFTA00578213", "page_number": 19, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \n7 \n2/27 Purchase alarm clocks for guest bedrooms MH \nand guest lodge Total of 6 \n4 have been purchased still need 2 more \n(Blue rm and 1 for guest lodge) \n3/22 \nComplete \n3/15 Repair \ndiamonds in front motor court at \nMasons are working on the repairs 3/15 \nPictures sent to JE, GM, SM 3/28 \nPicture \n3/22 \ncomplete \nMH \nAssemble balustrade at main house \nThey are caulking the balustrade 3/14 will \ntake 2 weeks to finish weather permitting \n3/27 \ncomplete \nHave Western Systems come out to install sound \nsystem when it arrives for Breakfast rm \nSound system arrived 3/22 \n3/23 Western Systems will be out Friday \n3/30 to install \nHas been installed but the remote is not \nworking so Western Systems is trying to \ntroubleshoot 3/28 \n3/28 New Remote has arrived Mike is \nprogramming \n3/28 \ncomplete \nMain House phone lines have interference and poor \nreception \nVal Comm and Sawyers are trouble \nshooting problems. 3/28 Sawyers is Fed \nExing a new CPU card. \n3/28 Val-com and Sawyers are \nreprogramming the system \n3/29 Complete. They had to reprogram the \nentire system Tom said there may be a few \n\"bugs\" over the next few days. The phone \nlines seem clear.] \n3/31 Val Com to check lines 4/2 \n3/29/01 \ncomplete \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues Fe- Future Construction Issues \nHouse Manual \n20 \nEFTA00578232\n", "char_count": 1455}, {"efta_number": "EFTA00578213", "page_number": 20, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \n7 \n4/2 Val —Comm is checking on phone lines \n3/27 Elevator lights are not working \n3/29 Service Electric has repaired \n3/29/01 \ncomplete \n2/28 Fix the crumbling column in the estancia \narranged for Les Files to come out in \n3/29 \ncomplete \nApril — it needs to warm up. \nAdrian is re airin 3/28 Picture \n2/27 Frame the island pictures \nPictures taken to Absolute Framing on 3/8 \nExpect completion 3/29 \n3/29 \n2/27 Have someone repair green fountain tiles \nVernon tiles will come out in April to repair \ntiles. It needs to warm up. \n3/31 Date has been changed because of \nweather \n4/10 \n4/25 \nTamera \n3/31 Add Velcro to the pictures in staff bdrm MH \n4/4 Tamera is working on it \nTamera \n2/27 Check telephone in exercise room \nThe house is not wired for a telephone in \nthe massage room - plate to be installed \nover circuit and Bobs paint to touch up \n3/9 \ncomplete \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDi- Decorating Issues IT- Future Construction Issues HM- House Manual \n21 \nEFTA00578233\n", "char_count": 1109}, {"efta_number": "EFTA00578213", "page_number": 21, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \n7 \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues FC- Future Construction Issues HM- House Manual \n22 \nEFTA00578234\n", "char_count": 246}, {"efta_number": "EFTA00578213", "page_number": 22, "text_content": "Zorro Ranch Projects / Tasks List 4/4/01 \nPROJ. \nSORT ASSIGN. \nDATE & DESCRIPTION \nSTATUS \nCOMP. \nTO \nDATE \nSORT KEY \nJE- Mr. Epstein GM- Ms. Maxwell SM- \nDI- Decorating Issues \nFC- Future Construction Issues HM- House Manual \n23 \nEFTA00578235\n", "char_count": 244}]}