{"efta_number": "EFTA00577821", "page_count": 22, "url": "https://epstein-data.com/EFTA00577821", "pdf_url": "https://epstein-data.com/pdf/EFTA00577821.pdf", "pages": [{"efta_number": "EFTA00577821", "page_number": 0, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nOLD PARIS APT. \nSTATUS \nITEM \nCOMMENT \n+ NC \n1. Change fat lady painting frame \ni) \n11/10 — Chaser sent to Jean for date. \n+ Update \n+ GM update \n2. AC in master bedroom — JE says \nthermostat is broken — a/c cuts \noff after 30 mins \nii) \nAC has been left on at the coldest temp. throughout apt \nsince JE left as a/c co. sd problem was because the a/c was \nswitched on and off.. AC Co. will test on Monday 14 Oct to \nmeasure temp. and advise further. \n+ NC \n3. Rolling Cart \niii) 4 Oct - Has arrived at 71s' — will go on plane on next trip to \nParis \n+ NC \n4. Safe \niv) Pinto is purchasing and installing 4 Nov. \n+ Update \n+ CM update \n5. Hang B/W pics - MBR loo & \nboudoir loo \nv) \nValdson has hung pictures. Can't email pics as card readers \nmalfunctioning. Pics expected Mon 14'1' after computer \nrepaired \n+ Update \n+ GM update \n6. Computer — New Card Readers \nfor JE computer / Update anti \nvirus \nvi) Computer guy updating virus & installing readers on \nMonday 14 Oct. \n+ NC \n7. Raise globe desk \nvii) 11/10 - Chaser sent to Jean for date. \nEFTA00577821\n", "char_count": 1098}, {"efta_number": "EFTA00577821", "page_number": 1, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update \n8. Photos for Apt \nviii) Two 8 x 10 — complete \nix) One 12 x 8 — complete \nx) \nEleven 11 x 151/2 (h)— 3 complete \nxi) Seven 11 x 151/2 (v) — 5 complete \nxii) Nine 8% x 13 — not started \nxiii) Three 71/4 x 101/4 - not started \n> NC — old apt \n9. Metal door @ entrance - JE \nwants a door code \nxiv) Building to meet to discuss \n> NC \n10.Paint Boudoir walls and loo + \nchange carpet \nxv) Chaser sent to Jean \n+ NC \n11. Light Chinese tapestry \nxvi) Chaser sent to Jean \n+ \n12. First aid \nxvii) This is to be found ..... \n+ NC \n11.Broken glass door in Boudoir \nxvii) 11/10 - Chaser sent to Jean for date. \n+ NC \n12.Add telephone book to car \nxviii) 11/10 \n+ NC \n13.4 sets of MBR sheets \nxix) Purchased at 7P' ready for next flight to Paris \nEFTA00577822\n", "char_count": 821}, {"efta_number": "EFTA00577821", "page_number": 2, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nNEW PARIS APT \nSTATUS \nITEM \nCOMMENT \n+ NC \n13.JE wants schedule for work — inc \nlayout, construction and \ndecoration \nxviii) Proposal from Pinto expected 15 Nov \n+ Update \nI4.Change Windows before Winter \nxix) Serge advises bill for work due at Pinto's office Wed 16 \nOct — Serge needs to approve first - windows will take 8 \nwks from approval \n+ Update \n15.5 x B/W pictures for Gym \nxx) \nPrinted, framed at 65th — ready next trip to Paris. \n+ Update \n16. True Bike Shock Absorbers \nxxi) Ones that were purchased for Zorro will be sent to Paris \nand new ones will be bought for Zorro. \n+ Update \n16. JE offered for new apt 3rd floor \nxxii) \nEFTA00577823\n", "char_count": 694}, {"efta_number": "EFTA00577821", "page_number": 3, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nPALM BEACH \nSTATUS \nITEM \nCOMMENT \n+ NC \n1. Automatic Hurricane Shutters \nfor Remaining Sections of \nHouse \ni) \nQuote attached = $10,850.00. \nAll guest room shutters and small loo shutters are manual. \nJE sd not to do anything at this time \n+ Update \n2. Wall \nii) \nAmber is currently ill and has started to paint the fence and \nwall betty. staff house and kitchen. She will continue when \nshe is well again. \n+ Plse advise \n+ GM talk to \nETC/Nick what is \ncurrent story \n3. Gates \niii) All gate/door intercoms currently connected to door \nbuzzers. NS suggests that this be changed to ring on staff \ntelephone line? JE plse ok if approved. \n+ NC \n4. Stone dock steps \niv) JE to advise \n+ Update \n5. Sale of Mercedes \nv) \nAd still running — no offers. \n+ Update \n+ Talk to Rich \n6. A/C \nvi) Large fan arrived and other spare parts. \nEFTA00577824\n", "char_count": 883}, {"efta_number": "EFTA00577821", "page_number": 4, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \n+ Update \n7. First Aid \nvii) Can be found in the cupboard in the downstairs powder \nroom. Defibrilator and additional first aid will arrive..... \n+ Update \n8. Pot plants \nviii) JE sd to purchase @ $300 \n+ Update \n9. Frame and hang picture in \nGarden room + frame and hang \norher pic of Zorro \n+ Update \n10. Large plastic pots \nix) \n+ Update \n11. Kitchen door sticking \nx) \n+ Update \nOrder new stationery \nxi) \n+ Update \nWhat is the status of switch board \nfor phones \nxii) \n+ Update \nThe 2nd gas drier does not work — \nthe mender of the machine sd .says \nwe need to run a new gas line \nxiii) \nEFTA00577825\n", "char_count": 645}, {"efta_number": "EFTA00577821", "page_number": 5, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \n457 MADISON \nSTATUS \nITEM \nCOMMENT \n+ Update \n1. Decorator for JE office \ni) Bastion supplied JE with info on proposed concept, and JE is \nconsidering proposal. \n+ Update \n1.Send out letters to get update of \ndirectory info \ni). \n+ Update \n1 Clean up Other areas of office and \nbuy new furniture \ni). \nEFTA00577826\n", "char_count": 354}, {"efta_number": "EFTA00577821", "page_number": 6, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \n301 EAST 66TH \nSTATUS \nITEM \nCOMMENT \n+ Update \n1.When do we get new apt — Size \ni). \n+ Update \n1.14G \ni). \nEFTA00577827\n", "char_count": 160}, {"efta_number": "EFTA00577821", "page_number": 7, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nKINNERTON STREET \nSTATUS \nITEM \nCOMMENT \n4 NC \n1. Painting of wall below trompe \nl'oeil \ni) Painter will try and fit in around other jobs — no date set. \nEFTA00577828\n", "char_count": 206}, {"efta_number": "EFTA00577821", "page_number": 8, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \n65TH STREET \nSTATUS \nITEM \nCOMMENT \n+ Update \n1. Security Products installation \ni) Installation will take place Tuesday I 5th October. \n+ NC \n2. Original broken Air-Conditioner \nin Office \nii) Has been removed and vents will be installed in existing duct \nto ventilate office — By end of Nov Rich will complete. \n+ Update \n3. Hang picture frames and mirrors iii) Installation will take place Tuesday 15th October. \n+ NC \n4. Canvas to replace Kline \niv) Delivery expected 25 Oct. \n+ NC \n5. Report on adding extension \nv) Has been removed and vents will be installed in existing duct \nto ventilate office — By end of Nov Rich will complete. \n+ NC \n6. Put blocks on my desk so that it \ndoes not shut \nvi) \nEFTA00577829\n", "char_count": 756}, {"efta_number": "EFTA00577821", "page_number": 9, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTAFF \nSTATUS \nITEM \nCOMMENT \n+ Update \n1. Michael Lifman \ni) He will be traveling back from SA to NY with NS and ES on \nthe 5 Nov — JE wants to know where he will be living \n+ Update \n2. Wiwid & Purni \nii) Letter has been done inviting them to the States and we are \nlooking into flights for arrival in the States during the first \nweek of November. \n4 Update \n3. Patrick — Evelyn's boyfriend \niii) He will be flying from France to Miami on the 16 Oct with \nprovisional return date of 15 Nov. Evelyn will travel to West \nPalm Beach on 16 Oct. \n+ Update \n4. Rick Harrington \niv) Rick went to Zorro — Rick spoke to Laryy \n+ FYI \n5. Richard \nv) Richard needs to travel to Zorro to do checks and \npreventative maintenance at MH. NS advises that Richard \ntravels when JE leaves for LA and Hawaii. \nEFTA00577830\n", "char_count": 846}, {"efta_number": "EFTA00577821", "page_number": 10, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \n71ST STREET \nSTATUS \nITEM \nCOMMENT \n+ Update \n1. Front Door \ni) \nThe exterior & interior of door expected completion due \n18d' Oct — weather permitting. \n+ Update \n1. Safe Room Bolt \nii) \nNS has consulted with Bob Oatman & Charles Miller & a \nrecommended company will be attending at 71st (early \nweek of 15th Oct) to view and then install further internal \nturn bolt and locking devices - installation date to be \nadvised. \n+ Update \n2. Safe room keypad \niii) Installation expected week of 21 Oct. \n+ Plse advise \n+ JE sd no \n3. Security DSL Line \niv) This is going to be hooked up 18th October - JE to advise \nif Richard to be able to access survey cameras from his \nhome computer. \n+ Update \n4. True Bike Shock Absorbers \nv) \nThese have been replaced \n+ Update \n5. Control Boards for Exhaust \nSystem \nvi) Purchased - will be installed by 16th October. \nUpdate \n6. Lighting \nviii) NS is meeting with Charles, Bill Bigelow and David \nWilbourne (Rockwell Group) on 15th Oct to review and \nrevise lighting contract. \nEFTA00577831\n", "char_count": 1068}, {"efta_number": "EFTA00577821", "page_number": 11, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update \n7. Converting part of basement in \nto staff quarters \nREDECORATION \n+ NC \n8. Coloured Boards for entryway \nvii) No update from Pinto. \nEFTA00577832\n", "char_count": 220}, {"efta_number": "EFTA00577821", "page_number": 12, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nZORRO RANCH \nSTATUS \nITEM \nCOMMENT \n+ Update \n1. Pew \ni) \nDelayed due to front gate - pews will start 8 Oct. \n+ Update \n2. Water Pump \nii) \nStill awaiting delivery of pitless adaptor — expected \ndelivery 22 Oct. \n+ Plse advise \n3. Security Gate \niii) Front entrance complete —Approved 14th Oct to proceed \nwith gate & cameras. \n+ NC \n4. Entry Gate \nv) \nJE will decide when he gets to Zorro height of lights \n+ NC \n5. Fountain \nvi) 3/10 - GM faxed Pascal to come up with new design. \n+ Update \n6. Map \nvii) Revised rough draft by 28th Oct. \n+ Update \n7. T1 Lines \nviii) \nix) \nVoicelines working. \nDelay in data lines to 29 Oct. \n> Update \n8. Medical Training \nx) \nSet up for November 9th as only date available in Oct \nclashes with JE visit to ranch. \nhusband to give \nmedical training course for all staff prior to visit. \n+ Update \n9. Survey \nxi) All easements were resent to all families 10 Oct as Darren \nmade changes. \nEFTA00577833\n", "char_count": 975}, {"efta_number": "EFTA00577821", "page_number": 13, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update \n10. Electricity Plumbing \nxii) Miller Bonded have started the piping in the water pump \nbuilding — completion expected 15 Dec. \n+ Update \n11. Building for RO \nxiii) Building is up and new door (to replace wrong door \npreviously sent) should arrive 15 Oct. \n+ Update \n12. Guest vehicle for ranch \nix) Larry is investigating a Mercedes Sprinter as per JE request \nand is awaiting Mercedes dealer to respond. \n+ Plse advise \n+ \n13. Transplant pinon trees \nx) \nA few trees have died. Approx cost is $2000.00 (rental of \ncame labour to dig and replant) to transplant 5 pinons \n(taken form ranch) to replace. JE sd yes to above — JE \nwants price to transplant 50 JE sd to offer $15,000 for \n50 trees \n+ Plse advise \n14. 40 Ft Digital Screen \nxi) NS contacted Larry Jacobson (President) of Theatre \nResource Group. JE advised NS that he would like \nconference call betw. JE, NS & Larry J. Lesley to advise \nNS when JE will be available for conference call. \n+ Plse advise \n15. First aid kits \nxi) \nAre located \nEFTA00577834\n", "char_count": 1089}, {"efta_number": "EFTA00577821", "page_number": 14, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nLITTLE ST. JEFFS \nSTATUS \nITEM \nCOMMENT \n4 Plse advise \n4 CM talk Miles \n1. Yoga Deck \ni) JE sd fixed roof -.14th Oct \n4 NC \n2. Floating Dock \nii) Floats and hardware on island. Fabrication to commence once \nnew dock complete — on hold woodshop concentrating on new \ngym & heli hut. \n4 NC \n3. Lookout House (Blue) \nRetaining Wall \niii) On hold — woodshop concentrating on new gym & heli hut. \n4 NC \n4. Build Side screen MBR & \nMove Steps \niv) On hold — woodshop concentrating on new gym & heli hut \n+ NC \n5. Plexiglass Weave Experiment \nv) On hold — woodshop concentrating on new gym & heli hut \n4 Update \n6. Telephone System \nvi) Telephone company on strike and not doing any new work —\nsystem to be digitized once strike is over. \n4 Update \n7. Bali Shipment \nvii) Now expected delivery date is end-Oct.- Boat somewhere on \nthe ocean — no further update from co. available \n4 Please advise \n8. Bamboo Flagpoles \nviii) JE sd to purchase material. Material ordered expected \ndelivery. \nEFTA00577835\n", "char_count": 1037}, {"efta_number": "EFTA00577821", "page_number": 15, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update \n9. Sea Life Paintings \nix) Ongoing — Lady has been off island ill and will be returning \nto LSJ Tuesday 15 Oct to continue. \n+ NC \n10. Glass Garage Type Doors \nx) \nOn hold — woodshop concentrating on new gym and heli hut. \n+ Update \n11. Sea Water Pump \nxi) Catalogue not sent by supplier - was requested to send \nASAP. \nxii) Supplier proving to be unreliable & Miles requested \nassistance from John Savage who will provide alternative \nsuppliers. No date given. \n+ Please advise. \n+ CM to \nunderstand \n12. Wind Generator / Large Beach \nHouse \nxiii) Quote to supply electricity, distribution boards and circuited \nfor the beach house will cost $15,900.00 - see attached \n\"A*\". JE to please advise. \n+ NC \n13.Maintenance & Storage Shed \nxiv) Shed is on order and delivery of building expected 1 Nov. \nMiles received no drawings yet. Paul Kelly has promised \nMiles design — no date given. \n+ NC \n14. Poly Pavement Dust Prevention \nxv) Process on hold whilst gym is being erected. Miles continues \nto spray roads with water to ease dust levels. \nUpdate \n15. Car Seat Covers \nxvi) Covers still not complete and new deadline of 31 Oct given. \nEFTA00577836\n", "char_count": 1222}, {"efta_number": "EFTA00577821", "page_number": 16, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update \n16. Music Systems / Electrical Cars \nxvii) Installation for Car # 2 complete. \nxviii) Awaiting spare parts from Ford to rework electrics on Car # \n3 — backordered and expected on island 31 Oct. \nxix) Miles told to call regional head of Ford \n+ NC \n17. Puppies \nxx) \nPuppies in Ohio until 18 Nov for house training. \n+ NC \n18. Parrot at Entrance \nxxi) On hold — woodshop concentrating on new gym & heli hut. \n+ Update \n19. Shotgun \nxxii) Application submitted - expected 10 Nov. \n+ Update \n20. Mosquitoes / Sandi'lies \nxxiii) Dan Ariaz will be traveling to LSJ 15th — 18th Oct — will \nsubmit proposal post visit. \n+ Update \n21. Boat \nxxiv) 48 Foot high speed catamaran that Larry dealing with has \nbeen sold. \n+ Update \n22. Helicopter Shelter \nxxv) Stoning \nwork \ncontinues, \ninterior \ntiling \ncomplete. \nConstruction of roof commenced — pictures attached. \n+ Update \n23. New House Building Site \nxxvi) Architects have visited the site & will put proposal forward \nfor permitting etc — no date. \n+ NC \n24. Poolhouse \nxxvii) Construction to commence in new year \nEFTA00577837\n", "char_count": 1146}, {"efta_number": "EFTA00577821", "page_number": 17, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \nPlease advise \n25. Dock \nxxviii) Old dock has been demolished & work has started on \nsetting out new dock. \nxxix) \nDecking material with Florida suppliers — expected 23 \nOct \nxxx) \nFenders — Miles supplied manufacturer with specs per \nplans. \nxxxi) \nQuote - \"Fend Off Fenders\" has submitted quote for 540 \nlinear feet (stock in hand) with exception of fender \ncorners (out of stock) but should not take too long to \nmake up. Have white & black colour not UV protected \nand the black leaves marks. Grey is UV protected and \nmark free which is advised colour. Arrives pre-drilled \nwith stainless steel fittings. Approx Cost = $14,500.00. \nJE to plse confirm if in order. In two wks company \nattending at Fort Lauderdale boat show and stock in hand \nmay be sold out. \n+ NC \n26. Cart Paths reduce grades \nxxxii) \nProject to start once earthmoving machinery on island —\ndependent on permits. \n* Update \n27. Plant Planters \nxxxiii) Supplier in Puerto Rico has pots = 42 inches high. Miles \nrequested sample for JE approval — expected 25 Oct. \nEFTA00577838\n", "char_count": 1112}, {"efta_number": "EFTA00577821", "page_number": 18, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update & \nComplete \n28. Master Bedroom Urinal \nxxxiv) Removed - wall & plumbing made good. \n+ NC \n29. Main House Maintenance \nxxxv) \nOngoing — one carpenter assigned all MH tasks. \n4 Please advise \n30. Stuart Fallbright \nxxxvi) 50% complete — continuing work. No completion date. \nxxxvii) New plants from Florida — 50% been planted. No \ncompletion date. \nxxxviii) JE sd Stuart can stay as long as he likes - He will stay \nUntil \n+ Please advise \n31.New Gym \nxxxix) Slab poured, block work commenced — see pictures \nattached. \nxl) \nSpecial order for doors / windows in hand — expected \ndelivery 1 Nov. \nxli) \nElectrical upgrade = $7,500.00 — \"A**\" \nAC Unit & Installation = $11,295.00 — \"B\" \nQuotes attached — JE to please confirm if in order. \nxlii) \nMiles received new roof line and permit updates from \nKevin today (11/10) but has not had time to review them. \nEFTA00577839\n", "char_count": 940}, {"efta_number": "EFTA00577821", "page_number": 19, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update \n32. Main House Outside Lights \nxliii) Diagrams & pictures supplied to GM who has progressed \nto requesting Miles come up with fastened cover to prevent \nwater from entering receptacle, copy also given to Richard. \n+ Update \n33. Steam Room \nxliv) Stand alone electric generator = $12,000.00 \nUpgrade LSJ power sources & run new cables = \n$110,000.00 — attached quote \"C\" \nxlv) 1/10 — Miles submitted website for pre-fabricated unit to \nJE. \nWebsite: steamandsauna.com NS spoke with Charles & \nCharles will come up with suggestions. \n+ Update \n34. Items to Purchase \nxlvi) First Aid/Ambulance — expected delivery 18 Oct \nxlvii) Gardening Equipment — arrived at LSJ 11 Oct \n+ Update & \nComplete \n35. MBR Curtain Rod \nxlviii) 7 ft curtain rod installed 10 ft from floor on inner wall. \n+ Please advise \n36. Replace AC Units in Guest \nRooms \nxlix) Quotes to replace all guest AC units (3) = $6,585.00 — see \nattached \"D\" - JE to please confirm if in order \n> Update \n37. Irrigation \nI) \nReport received — sent to Charles & forwarded to Madison \nCox, copied to JE & NS. Quoted = $930,000.00 \nEFTA00577840\n", "char_count": 1171}, {"efta_number": "EFTA00577821", "page_number": 20, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update \n38. New Development \nli) \nGenerator for new building — Paul Gandy sourcing correct \ngenerators. \nlii) \nPaul Gandy drawing up bubble diagram of site utilities & \nbuilding - submitting to Ed Tuttle to design. \nliii) \n11/10 - Letter of credit sent and received by Pirelli. \nliv) \nCable ready for factory testing betw. 30 Oct and 8 Nov. NS \nwill speak to Charles re having somebody attend the \ntesting. \nIv) \nConference call held 7 Oct betw. Darren, Paul Gandy & \nothers w.r.t. conflicting information — Paul Gandy was \nsupposed to have memo sent to Darren w.r.t what was \nexcluded and what needs to be included in the cable \ninstallation proposal. Due to be received by Darren today \n(11/10) and on second conference call today 11/10 betw \nNS, Darren & Paul Gandy, Paul advised he had \nmisunderstood and assured us that he would send the memo \nto Darren on Monday 14 Oct. \n+ Update \n39. Pond Clear / Algae Eater \nlvi) \nCompany Miles was dealing with has gone bankrupt —\ninvestigating alternate company. ES sent Miles alternative \n& Miles will contact. NS also contacted Alan Stopec for his \nadvice. \nEFTA00577841\n", "char_count": 1182}, {"efta_number": "EFTA00577821", "page_number": 21, "text_content": "FORTNIGHTLY REPORT \nFRIDAY 11 OCTOBER \nSTATUS \nITEM \nCOMMENT \n+ Update \n40. Dock Light \nlvii) Ed Tuttle was not consulted on dock light and Charles has \nnow sent memo to Tuttle requesting manufacturer details. \n+ NC \n41. Permits \n(viii) No progress to report — ongoing. \n+ NC \n41.Madison Cox to show pictures \nlix) \nNo progress to report — ongoing. \n******************** \nEFTA00577842\n", "char_count": 385}]}