{"efta_number": "EFTA00577802", "page_count": 19, "url": "https://epstein-data.com/EFTA00577802", "pdf_url": "https://epstein-data.com/pdf/EFTA00577802.pdf", "pages": [{"efta_number": "EFTA00577802", "page_number": 0, "text_content": "OLD PARIS APT.\n+ NC\nSTATUS\n+ Update\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nITEM\nCOMMENT\n1. Change fat lady painting frame i)\n11/10 Chaser sent to Jean for date.\n→ GM update\n2. AC in master bedroom - JE says ii) AC has been left on at the coldest temp. throughout apt\nthermostat is broken - a/c cuts\noff after 30 mins\n+ NC\n3. Rolling Cart\n+ NC\n+ Update\n→ GM update\n+ Update\n→ GM update\n4. Safe\n5. Hang B/W pics - MBR loo &\nboudoir loo\n-\n6. Computer New Card Readers\nfor JE computer / Update anti\nvirus\n7. Raise globe desk\nsince JE left as a/c co. sd problem was because the a/c was\nswitched on and off.. AC Co. will test on Monday 14 Oct to\nmeasure temp. and advise further.\niii) 4 Oct - Has arrived at 71st - will go on plane on next trip to\nParis\niv) Pinto is purchasing and installing 4 Nov.\nv) Valdson has hung pictures. Can't email pics as card readers\nmalfunctioning. Pics expected Mon 14th after computer\nrepaired\nvi) Computer guy updating virus & installing readers on\nMonday 14 Oct.\nvii) 11/10 Chaser sent to Jean for date.\n+ NC\n+ Update\n8. Photos for Apt\nviii) Two 8 x 10 - complete\nix)\nOne 12 x 8 - complete\n✗)\nEleven 11 x 15½ (h) - 3 complete\nEFTA00577802\n", "char_count": 1165}, {"efta_number": "EFTA00577802", "page_number": 1, "text_content": "STATUS\nITEM\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nCOMMENT\nxi) Seven 11 x 15% (v)-5 complete\nxii) Nine 84 x 13 - not started\nxiii) Three 74 × 10 - not started\n→ NC - old apt\n9. Metal door @ entrance - JE\nwants a door code\nxiv) Building to meet to discuss\n+ NC\nxv) Chaser sent to Jean\n→ NC\n+\n+ NC\n+ NC\n→ NC\n10.Paint Boudoir walls and loo +\nchange carpet\n11. Light Chinese tapestry\n12. First aid\n11.Broken glass door in Boudoir\n12. Add telephone book to car\n13.4 sets of MBR sheets\nxvi) Chaser sent to Jean\nxvii) This is to be found.....\nxvii) 11/10 Chaser sent to Jean for date.\nxviii) 11/10\nxix) Purchased at 71st ready for next flight to Paris\nNEW PARIS APT\n→ NC\nSTATUS\nITEM\nCOMMENT\n13.JE wants schedule for work - inc xviii) Proposal from Pinto expected 15 Nov\nlayout, construction and\ndecoration\nEFTA00577803\n", "char_count": 810}, {"efta_number": "EFTA00577802", "page_number": 2, "text_content": "FORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nSTATUS\n→ Update\nITEM\nCOMMENT\n14. Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16\nOct - Serge needs to approve first - windows will take 8\nwks from approval\n+ Update\n15.5 x B/W pictures for Gym\nxx) Printed, framed at 65th - ready next trip to Paris.\n+ Update\n16. True Bike Shock Absorbers\nxxi) Ones that were purchased for Zorro will be sent to Paris\nand new ones will be bought for Zorro.\nPALM BEACH\nSTATUS\nITEM\nCOMMENT\n+ NC\n1. Automatic Hurricane Shutters\nfor Remaining Sections of\nHouse\ni)\nQuote attached = $10,850.00.\n+ Update\n2. Wall\nii)\n→ Plse advise\n→ GM talk to\nETC/Nick what is\ncurrent story\n3. Gates\nAll guest room shutters and small loo shutters are manual.\nJE sd not to do anything at this time\nis currently ill and has started to paint the fence and\nwall betw. staff house and kitchen. She will continue when\nshe is well again.\niii) All gate/door intercoms currently connected to door\nbuzzers. NS suggests that this be changed to ring on staff\ntelephone line? JE plse ok if approved.\nEFTA00577804\n", "char_count": 1089}, {"efta_number": "EFTA00577802", "page_number": 3, "text_content": "+ NC\n+ Update\n4. Stone dock steps\n+ Update\n→ Talk to Rich\n→ Update\n5. Sale of Mercedes\n6. A/C\n7. First Aid\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\niv) JE to advise\nv)\nAd still running - no offers.\nvi) Large fan arrived and other spare parts.\nvii) Can be found in the cupboard in the downstairs powder\nroom. Defibrilator and additional first aid will arrive.....\nviii) GM Call Stopek\n+ Update\n8. Pot plants\n+ Update\n9. Frame and hang picture in\nGarden room + frame and hang\norher pic of Zorro\n+ Update\n10. Large plastic pots\nix)\n→ Update\n11. Kitchen door sticking\n✗)\n+ Update\nOrder new stationery\nxi)\n+ Update\nWhat is the status of switch board\nxii)\nfor phones\nEFTA00577805\n", "char_count": 670}, {"efta_number": "EFTA00577802", "page_number": 4, "text_content": "457 MADISON\nSTATUS\n+ Update\n+ Update\n+ Update\n301 EAST 66TH\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nITEM\n1. Decorator for JE office\n1.Send out letters to get update of\ndirectory info\nCOMMENT\ni) Bastione supplied JE with info on proposed concept, and JE is\nconsidering proposal.\ni).\n1 Clean up Other areas of office and i).\nbuy new furniture\nSTATUS\nITEM\nCOMMENT\n+ Update\n1.When do we get new apt - Size\ni).\nKINNERTON STREET\n+ NC\nSTATUS\nITEM\nCOMMENT\n1. Painting of wall below trompe i) Painter will try and fit in around other jobs - no date set.\nl'oeil\nEFTA00577806\n", "char_count": 562}, {"efta_number": "EFTA00577802", "page_number": 5, "text_content": "65TH STREET\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nSTATUS\n+ Update\n→ NC\nITEM\nCOMMENT\n+ Update\n1. Security Products installation i) Installation will take place Tuesday 15th October.\n2. Original broken Air-Conditioner ii) Has been removed and vents will be installed in existing duct\nin Office\nto ventilate office - By end of Nov Rich will complete.\n3. Hang picture frames and mirrors iii) Installation will take place Tuesday 15th October.\n→ NC\n4. Canvas to replace Kline\niv) Delivery expected 25 Oct.\n+ NC\n5. Report on adding extension.\nv) Has been removed and vents will be installed in existing duct\nto ventilate office - By end of Nov Rich will complete.\n+ NC\n6. Put blocks on my desk so that it vi)\ndoes not shut\nEFTA00577807\n", "char_count": 729}, {"efta_number": "EFTA00577802", "page_number": 6, "text_content": "STAFF\nSTATUS\nITEM\n+ Update\n1. Michael Lifman\n+ Update\n2. Wiwid & Purni\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\n+ Update\n3. Patrick Evelyn's boyfriend\n+ Update\n4. Rick Harrington\n→ FYI\n5. Richard\nCOMMENT\ni) He will be traveling back from SA to NY with NS and ES on\nthe 5 Nov - JE wants to know where he will be living\nii) Letter has been done inviting them to the States and we are\nlooking into flights for arrival in the States during the first\nweek of November.\niii) He will be flying from France to Miami on the 16 Oct with\nprovisional return date of 15 Nov. Evelyn will travel to West\nPalm Beach on 16 Oct.\niv) NS showed Rick around 65th and 71st except for 3rd & 4th JE\nwas in house) and he has Larry V's cellphone #3 & will\ndiscuss plane security with him week of 15th Oct. Rick going\nZorro week of 15 Oct.\nv) Richard needs to travel to Zorro to do checks and\npreventative maintenance at MH. NS advises that Richard\ntravels when JE leaves for LA and Hawaii.\nEFTA00577808\n", "char_count": 973}, {"efta_number": "EFTA00577802", "page_number": 7, "text_content": "71ST STREET\nSTATUS\n+ Update\n1. Front Door\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nITEM\ni)\n+ Update\n1. Safe Room Bolt\n+ Update\n2. Safe room keypad\n+ Plse advise\n3. Security DSL Line\n→ JE sd no\nCOMMENT\nThe exterior & interior of door expected completion due\n18th Oct-weather permitting.\nii) NS has consulted with Bob Oatman & Charles Miller & a\nrecommended company will be attending at 71st (early\nweek of 15th Oct) to view and then install further internal\nturn bolt and locking devices installation date to be\nadvised.\niii) Installation expected week of 21 Oct.\niv) This is going to be hooked up 18th October - JE to advise\nif Richard to be able to access survey cameras from his\nhome computer.\nv) These have been replaced\n+ Update\n4. True Bike Shock Absorbers\n→ Update\n5. Control Boards for Exhaust\nSystem\nvi) Purchased - will be installed by 16th October.\n+ Update\n6. Lighting\nviii) NS is meeting with Charles, Bill Bigelow and David.\nWilbourne (Rockwell Group) on 15th Oct to review and\nrevise lighting contract.\nEFTA00577809\n", "char_count": 1026}, {"efta_number": "EFTA00577802", "page_number": 8, "text_content": "STATUS\n→ Update\nITEM\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\n7. Converting part of basement in\nto staff quarters\nDECORATING\n+ NC\nCOMMENT\n8. Coloured Boards for entryway\nvii) No update from Pinto.\nEFTA00577810\n", "char_count": 206}, {"efta_number": "EFTA00577802", "page_number": 9, "text_content": "FORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\n+ Update\nZORRO RANCH\nSTATUS\n1. Pew\nITEM\nCOMMENT\ni)\nDelayed due to front gate - pews will start 8 Oct.\n+ Update\n2. Water Pump\nii) Still awaiting delivery of pitless adaptor\ndelivery 22 Oct.\n-\nexpected\n→ Plse advise\n3. Security Gate\n+ NC\n4. Entry Gate\nv)\n+ NC\n5. Fountain\n+ Update\n6. Map\n+ Update\n7. T1 Lines\n→ Update\n8. Medical Training\niii) Front entrance complete - Shannon is awaiting approval to\nproceed with gate & cameras.\niv) NS has requested Rick Harrington to look into the security\nquote received when he is at Zorro.\nJE will decide when he gets to Zorro height of lights\nvi) 3/10 GM faxed Pascal to come up with new design.\nvii) Revised rough draft by 28th Oct.\nviii) Voicelines working.\nix) Delay in data lines to 29 Oct.\nx) Set up for November 9th as only date available in Oct\nclashes with JE visit to ranch. Shannon's husband to give\nmedical training course for all staff prior to visit.\nEFTA00577811\n", "char_count": 952}, {"efta_number": "EFTA00577802", "page_number": 10, "text_content": "STATUS\n→ Update\n9. Survey\nITEM\n+ Update\n10. Electricity Plumbing\n+ Update\n11. Building for RO\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\n+ Update\n12. Guest vehicle for ranch\n→ Plse advise\n13. Transplant pinon trees\n+\n→ Plse advise\n14. 40 Ft Digital Screen\nCOMMENT\nxi) All easements were resent to all families 10 Oct as Darren\nmade changes.\nxii) Miller Bonded have started the piping in the water pump\nbuilding completion expected 15 Dec.\nxiii) Building is up and new door (to replace wrong door\npreviously sent) should arrive 15 Oct.\nix) Larry is investigating a Mercedes Sprinter as per JE request\nand is awaiting Mercedes dealer to respond.\nx) A few trees have died. Approx cost is $2000.00 (rental of\ncarne labour to dig and replant) to transplant 5 pinons\n(taken form ranch) to replace. JE sd yes to above JE\nwants price to transplant 50 The cost to transplant 50 7-8\nfoot pinons: $25,200 plus tax Trees can be moved up until\nMarch. Since the irrigation is cut down this time of year we\nwill have enough water this fall to irrigate the new trees.\nOnce the new well is up and running we will not have a\nproblem in the summer time. Plse advise\nxi) NS contacted Larry Jacobson (President) of Theatre\nResource Group. JE advised NS that he would like\nconference call betw. JE, NS & Larry J. Lesley to advise\nNS when JE will be available for conference call.\nEFTA00577812\n", "char_count": 1365}, {"efta_number": "EFTA00577802", "page_number": 11, "text_content": "STATUS\n→ Plse advise\n15. First aid kits\nLITTLE ST. JEFFS\nSTATUS\nITEM\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nxi) Are located.......\nITEM\nCOMMENT\ni) JE sd fixed roof -.\n→ Plse advise\n1. Yoga Deck\n→ GM talk Miles\n→ NC\n2. Floating Dock\nCOMMENT\n+ NC\n+ NC\n→ NC\n+Update\n3. Lookout House (Blue)\nRetaining Wall\n4. Build Side screen MBR &\nMove Steps\n5. Plexiglass Weave Experiment\n6. Telephone System\nii) Floats and hardware on island. Fabrication to commence once\nnew dock complete - on hold woodshop concentrating on new\ngym & heli hut.\niii) On hold-woodshop concentrating on new gym & heli hut.\niv) On hold-woodshop concentrating on new gym & heli hut\nv) On holdwoodshop concentrating on new gym & heli hut\nvi) Telephone company on strike and not doing any new work –\nEFTA00577813\n", "char_count": 772}, {"efta_number": "EFTA00577802", "page_number": 12, "text_content": "STATUS\n→ Update\nITEM\n7. Bali Shipment\n→ Please advise\n8. Bamboo Flagpoles\n→ Update\n9. Sea Life Paintings\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nCOMMENT\nsystem to be digitized once strike is over.\nvii) Now expected delivery date is end-Oct.- Boat somewhere on\nthe ocean - no further update from co. available\nviii) JE sd to purchase material. Material ordered expected\ndelivery.\nix) Ongoing Lady has been off island ill and will be returning\nto LSJ Tuesday 15 Oct to continue.\n→ NC\n10. Glass Garage Type Doors\nx)\n+ Update\n11. Sea Water Pump\n+ Please advise.\n→ GM to\nunderstand\n→ NC\n12. Wind Generator / Large Beach\nHouse\n13. Maintenance & Storage Shed\nOn hold-woodshop concentrating on new gym and heli hut.\nxi) Catalogue not sent by supplier was requested to send\nASAP.\nxii) Supplier proving to be unreliable & Miles requested\nassistance from John Savage who will provide alternative\nsuppliers. No date given.\nxiii) Quote to supply electricity, distribution boards and circuited\nfor the beach house will cost $15,900.00 - see attached\n\"A*\". JE to please advise.\nxiv) Shed is on order and delivery of building expected 1 Nov.\nMiles received no drawings yet. Paul Kelly has promised\nMiles design no date given.\nEFTA00577814\n", "char_count": 1220}, {"efta_number": "EFTA00577802", "page_number": 13, "text_content": "STATUS\n→ NC\nITEM\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\n14. Poly Pavement Dust Prevention\n+ Update\n15. Car Seat Covers\nCOMMENT\nxv) Process on hold whilst gym is being erected. Miles continues\nto spray roads with water to ease dust levels.\nxvi) Covers still not complete and new deadline of 31 Oct given.\n+ Update\n16. Music Systems / Electrical Cars xvii) Installation for Car # 2 complete.\n17.Puppies\nxviii) Awaiting spare parts from Ford to rework electrics on Car #\n3 backordered and expected on island 31 Oct.\nxix) Miles told to call regional head of Ford\n+ NC\nxx)\n+ NC\n18. Parrot at Entrance\n→ Update\n19.Shotgun\n→ Update\n20. Mosquitoes / Sandflies\n+ Update\n21. Boat\n+ Update\n22. Helicopter Shelter\nPuppies in Ohio until 18 Nov for house training.\nxxi) On hold woodshop concentrating on new gym & heli hut.\nxxii) Application submitted - expected 10 Nov.\nxxiii) Dan Ariaz will be traveling to LSJ 15th-18th Oct - will\nsubmit proposal post visit.\nxxiv) 48 Foot high speed catamaran that Larry dealing with has\nbeen sold.\nxxv) Stoning work continues, interior tiling complete.\nEFTA00577815\n", "char_count": 1088}, {"efta_number": "EFTA00577802", "page_number": 14, "text_content": "STATUS\nITEM\n+ Update\n23. New House Building Site\n→ NC\n24. Poolhouse\n→ Please advise\n25. Dock\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nCOMMENT\nConstruction of roof commenced - pictures attached.\nxxvi) Architects have visited the site & will put proposal forward\nfor permitting etc - no date.\nxxvii) Construction to commence in new year\nxxviii) Old dock has been demolished & work has started on\nsetting out new dock.\nxxix) Decking material with Florida suppliers - expected 23\nOct\nXXX)\nxxxi)\nFenders\nplans.\nMiles supplied manufacturer with specs per\nQuote \"Fend Off Fenders\" has submitted quote for 540\nlinear feet (stock in hand) with exception of fender\ncorners (out of stock) but should not take too long to\nmake up. Have white & black colour not UV protected\nand the black leaves marks. Grey is UV protected and\nmark free which is advised colour. Arrives pre-drilled\nwith stainless steel fittings. Approx Cost = $14,500.00.\nJE to plse confirm if in order. In two wks company\nattending at Fort Lauderdale boat show and stock in hand\nmay be sold out.\nEFTA00577816\n", "char_count": 1061}, {"efta_number": "EFTA00577802", "page_number": 15, "text_content": "→ NC\nSTATUS\nITEM\n26. Cart Paths reduce grades\n+ Update\n27. Plant Planters\n+ Update &\nComplete\n+ NC\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nCOMMENT\nxxxii) Project to start once earthmoving machinery on island\ndependent on permits.\nxxxiii) Supplier in Puerto Rico has pots = 42 inches high. Miles.\nrequested sample for JE approval - expected 25 Oct.\n28. Master Bedroom Urinal\nxxxiv) Removed - wall & plumbing made good.\n29. Main House Maintenance\n→ Please advise\n30. Stuart Fallbright\n+ Please advise\n31.New Gym\nxxxv) Ongoing - one carpenter assigned all MH tasks.\nxxxvi) 50% complete - continuing work. No completion date.\nxxxvii) New plants from Florida 50% been planted. No.\ncompletion date.\nxxxviii) JE sd Stuart can stay as long as he likes - He will stay\nxxxix) Slab poured, block work commenced see pictures\nxl)\nattached.\nSpecial order for doors / windows in hand expected\ndelivery 1 Nov.\nxli)\nElectrical upgrade = $7,500.00 – “A**”\nEFTA00577817\n", "char_count": 948}, {"efta_number": "EFTA00577802", "page_number": 16, "text_content": "STATUS\nITEM\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\n+ Update\n32. Main House Outside Lights\n+ Update\n33. Steam Room\n→ Update\n34. Items to Purchase\nCOMMENT\nAC Unit & Installation = $11,295.00 - \"B\"\nQuotes attached - JE to please confirm if in order.\nxlii)\nMiles received new roof line and permit updates from\nKevin today (11/10) but has not had time to review them.\nxliii) Diagrams & pictures supplied to GM who has progressed\nto requesting Miles come up with fastened cover to prevent\nwater from entering receptacle, copy also given to Richard.\nxliv) Stand alone electric generator = $12,000.00\nUpgrade LSJ power sources & run new cables\n$110,000.00 attached quote \"C\"\n=\nxlv) 1/10 Miles submitted website for pre-fabricated unit to\nJE.\nWebsite: steamandsauna.com NS spoke with Charles &\nCharles will come up with suggestions.\nxlvi) First Aid/Ambulance - expected delivery 18 Oct\nxlvii) Gardening Equipment - arrived at LSJ 11 Oct\n+ Update &\nComplete\n35. MBR Curtain Rod\nxlviii) 7 ft curtain rod installed 10 ft from floor on inner wall.\nEFTA00577818\n", "char_count": 1046}, {"efta_number": "EFTA00577802", "page_number": 17, "text_content": "STATUS\nPlease advise\n+ Update\nITEM\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\n36. Replace AC Units in Guest\nRooms\n37. Irrigation\nCOMMENT\nxlix) Quotes to replace all guest AC units (3) = $6,585.00 - see\nattached \"D\" -JE to please confirm if in order\n1)\nReport received sent to Charles & forwarded to Madison\nCox, copied to JE & NS. Quoted = $930,000.00\n+ Update\n38. New Development\nli)\nGenerator for new building - Paul Gandy sourcing correct\ngenerators.\nlii) Paul Gandy drawing up bubble diagram of site utilities &\nbuilding-submitting to Ed Tuttle to design.\nliii) 11/10 Letter of credit sent and received by Pirelli.\nliv) Cable ready for factory testing betw. 30 Oct and 8 Nov. NS\nwill speak to Charles re having somebody attend the\ntesting.\nlv)\nConference call held 7 Oct betw. Darren, Paul Gandy &\nothers w.r.t. conflicting information - Paul Gandy was\nsupposed to have memo sent to Darren w.r.t what was\nexcluded and what needs to be included in the cable\ninstallation proposal. Due to be received by Darren today\n(11/10) and on second conference call today 11/10 betw\nNS, Darren & Paul Gandy, Paul advised he had\nmisunderstood and assured us that he would send the memo\nEFTA00577819\n", "char_count": 1183}, {"efta_number": "EFTA00577802", "page_number": 18, "text_content": "STATUS\nITEM\n+ Update\n39. Pond Clear / Algae Eater\n→ Update\n40. Dock Light\n→ NC\n41.Permits\nFORTNIGHTLY REPORT\nFRIDAY 11 OCTOBER\nCOMMENT\nto Darren on Monday 14 Oct.\nlvi) Company Miles was dealing with has gone bankrupt -\ninvestigating alternate company. ES sent Miles alternative\n& Miles will contact. NS also contacted Alan Stopec for his\nadvice.\nlvii) Ed Tuttle was not consulted on dock light and Charles has\nnow sent memo to Tuttle requesting manufacturer details.\nlviii) No progress to report - ongoing.\n**\nEFTA00577820\n", "char_count": 523}]}