{"efta_number": "EFTA00577740", "page_count": 21, "url": "https://epstein-data.com/EFTA00577740", "pdf_url": "https://epstein-data.com/pdf/EFTA00577740.pdf", "pages": [{"efta_number": "EFTA00577740", "page_number": 0, "text_content": "PARIS \nSTATUS \nITEM \nCOMMENT \n> Update \n1. AC in master bedroom. Air \nvolume to be increased and \ndiffusers to be changed. \ni) \nii) \nDiffusers will begin installation 15 April. \nFYI: Installation of the diffusers expected to take two \nweeks, the room will have to be repainted and require \nscaffolding, JE to advise once the diffusers are on sight, \nmost appropriate two week for week to be complete. \n+ Update \n2. Oxygen supply \niii) \nOxygen tank had to be rented; it will be in Paris 28 \nMarch. \n+ NC \n3. Photos for livingroom \niv) \nSarah is printing photographs. \n+ NC \n4. Boudoir Add Rug. \nv) \nRug being made, expected end of May \n+ NC \n5. AC in Kitchen \nvi) \nTo be reviewed at the time as the AC in the new apt. \n+ Update \n6. Wireless System \nvii) \n2 Linksys wireless routers (French Versions) and a \nwireless adapter for the desktop computer from a French \nsupplier have been ordered. \n+ Update \n7. Front Gate New key system \nviii) Expert will \nand her \nof a \nfor JE \n8. Chandelier in the bathroom \nix) \nHas been hung. Hiding of wires expected in 2 months. \nEFTA00577740\n", "char_count": 1077}, {"efta_number": "EFTA00577740", "page_number": 1, "text_content": "PARIS \nSTATUS \nITEM \nCOMMENT \nNC \n9. Horseshoe Table/Ash Tray \nx) \nJean has advised the horseshoe tables will be ready in 2 \nmonths (April). \n+ Update \n10. Change Windows before \nWinter \nxi) Windows installation expected to commence 15 April. \n'o  \n thy\nSTATUS \n+ NC \nITEM \n1 1. Gym equipment \nCOMMENT \n2 \nEFTA00577741\n", "char_count": 319}, {"efta_number": "EFTA00577740", "page_number": 2, "text_content": "PALM BEACH \nSTATUS \nITEM \nCOMMENT \n+ Update \n+ JE Please \nadvise \n1. \nLandscape Lighting \ni) \nInstallation started 20 March. \nWill take 4 days to \ncomplete. Is JE happy with it? \n+ JE Please \nadvise \n2. \nClub Chairs — Staff house \nii) \nExpected delivery 1st April. \n+ Update \n3. \nFurniture for Paula Epstein \niii) \nTriconfort furniture will be delivered 17 April. \n+ JE Please \nadvise \n4. \nTriconfort Cushions \niv) \nOrdered new cushions, expected delivery 17 April. \n+ Update \n5. \nRevamping \nthe \nback \nentrance \nv) \nCompleted is JE happy with it? \nON HOLD \n6. \nAuto Hurricane Shutters \nfor Remaining Sections of \nHouse \nvi) \nJE sd not to do anything at this time with the shutters. \n+ NC \n3 \nEFTA00577742\n", "char_count": 706}, {"efta_number": "EFTA00577740", "page_number": 3, "text_content": "REDECORATION OF HOUSE \n+ Update \n7. \nSchedule from Pinto \nvii) \nProject Solutions took measurements and will be back \nweek of 24 March to refine their work. \n**************************** \n4 \nEFTA00577743\n", "char_count": 204}, {"efta_number": "EFTA00577740", "page_number": 4, "text_content": "457 MADISON \nSTATUS \nITEM \nCOMMENT \n4 NC \n1. \nDecorator for JE office \ni) \nBastion supplied JE with info on proposed concept, \nand JE is considering proposal. \n+ \n+ \nNC \nJE plse advise \n2. \nDarren's Office to buy new \nfurniture \nii) \nJE wanted new furniture. GM to purchase new desk & \ncabinets for Lauren's area & conference table & look \nat dividing unit for Lauren & Darren. \n+ JE Please \nadvise \n3. \nDirectory Update \niii) \nJE to approve. \n4 \n+ \nUpdate \nJE plse advise \n4. \nNew LSJ Model and 2x3 \nreplica \niv) \nSecond model expected to be completed 10 April. Is \nJE happy with the completed models? \n+ JE plse advise \n5. \nBody Cast of Alina. \nv) \nWaiting for response as to type (material of cast) for \nJE to make decision. \n5 \nEFTA00577744\n", "char_count": 745}, {"efta_number": "EFTA00577740", "page_number": 5, "text_content": "65TH STREET \nSTATUS \nITEM \nCOMMENT \n+ Update \n1. Office Extension \n0 \nBeing processed. Expected approval \nplanning of zoning. \n11 April in \n+ Update \n2. Fender \nii) \nFender expected 7 April. \n+ Update \n2. Lamp \niii) \nFender expected 7 April. \n6 \nEFTA00577745\n", "char_count": 259}, {"efta_number": "EFTA00577740", "page_number": 6, "text_content": "715T STREET \nSTATUS \nITEM \nCOMMENT \nUpdate \n6. \nLighting \ni) \nEngineer to give quote by 4 April. \n+ \n+ \nNC \nJE plse advise \n7. \nSurveillance Cameras \nFir \n3rd \nii) \nTwo quotes supplied in the sum of $16,730.00 and \n$14,508.05 by two companies. JE to approve. Should \ncommence when construction begins. \nWill have to go with Security Products since GFI is \nout of business. \n+ \n+ \nNC \nJE plse advise \n8. \nUpgrade of Landis System \niii) \n10/1 — Need to upgrade the Landis BMS System from \nWindows 95to ensure alarms to beeper system is up to \ndate. Upgrade to the latest technology approximately \n$28,500.00. \nSG recommended to update Windows 95 for the time \nbeing. \nIs JE in favor of upgrading system to new dial out \nfeature and adding domestic hot water system to BMS \nsystem? \n+ Update \n9. \nAntennae Company \niv) \nApproved per JE. Will proceed with Sawyers. Nextel \nwill install a system with a repeater; will call on 24 \nMarch with a schedule. Awaiting time frame but work \nshould commence when construction begins. \n7 \nEFTA00577746\n", "char_count": 1037}, {"efta_number": "EFTA00577740", "page_number": 7, "text_content": "DECORATING \nSTATUS \nITEM \n+ NC \n+ JE plse advise \n+ Update \n+ NC \n10. Converting part of \nbasement in to staff \nquarters \nCOMMENT \nv) \nAwaiting quote by Michael Bernice. Should we get \nanother quote? Recommend second completive bid. \nWaiting for bid from Bernice. \n11. Redecoration of living \nroom and MBR \nvi) \nFurniture will be in storage end of April. \nGetting \ncompetitive storage bids. Will have bid by 4 April. \n8 \nEFTA00577747\n", "char_count": 434}, {"efta_number": "EFTA00577740", "page_number": 8, "text_content": "AEROPLANES \nSTATUS \nITEM \nCOMMENT \n+ Update \n1. GIIB Stage III \ni) \nStage III — JE will not pursue \n+ Update \n2. GIIB Iridium Blending to \nAircell \nii) \niii) \nIridium boxes have arrived at JA PBI for SatCom upgrade - \ncomplete \n21/2 — Larry would like to install an AirCell / Iridium handset \nin cockpit of GIIB, for crew usage during en-route changes \nand logistics, wiring is already there, it would only require \npurchasing and mounting handset = $2,952.00 complete, no \nadditional down time - Complete \n+ \n+ \n+ \n+ \n+ \nY \nNC \nNC \nJE plse \nadvise \nUpdate \nUpdate \nNC \n3. 727 Interior \niv) \nv) \nvi) \nvii) \nFlorida Flight viewed 727 to bid on interior removal and re-\ninstallation including modifying aft lavatory for shower — one \nquote has arrived minus the shower component from FLA \ninteriors. \nFoam test cushions are complete.. Suede samples given to JE \nto make a decision. \nJanuary work scope with Jet Aviation to include: \na. Office chair foam has been altered with movable \nadjustments and stiffened T cushion. \nSeat will be \nreinstalled by 14 March. - complete \nQuote received from Lou Martin for shades JE to review. Still \nawaiting aft lavatory shower modification quotation. Lou \nMartins is no longer quoting the shower. \n9 \nEFTA00577748\n", "char_count": 1251}, {"efta_number": "EFTA00577740", "page_number": 9, "text_content": "STATUS \nITEM \nCOMMENT \nNC \nviii) Interior removal & re-installation of the \"C\" check is still out \nfor bidding. \n+ NC \nix) Awaiting quote from Pro Aircraft Interior for shower \ninstallation — they are checking on mechanicals. \nx) \nAugust 2003 work: \na. \nPacific Gas Turbines selected to do work on the No. 2 \nengine high pressure compressor. \n+ Update \nb. \n\"C\" check back open for bids. \n+ Update \nxi) SFAR 88 (Fuel Tanks) — received relief from Dugan for the \nwinglets and BFGoodrich for engine mods. Currently \nworking on all other STC's and modifications in compliance \n— no problems foreseen just time consuming. At FAA mtg in \nNov. \n+ NC - JE plse \nadvise \n4. Helicopter \nxii) Dave to go to Bell school 21 April. \n10 \nEFTA00577749\n", "char_count": 736}, {"efta_number": "EFTA00577740", "page_number": 10, "text_content": "STAFF \nSTATUS \nITEM \nCOMMENT \n+ \n+ \nNC \nJE plse advise \n1. Helicopter Pilot — Nicholas \ni) He is interested in the position. Nicolas sd that until the \nsummer he would be busy with the Navy contract, and so he \ncould look after the helicopter and fly it. He has one assignment \nfor the navy in Jan for a week. Nicolas also sd that he had lots \nof holiday due to him which he could apply for and use his \nholiday time to work for JE. \n+ NC \n2. Bill Hammond \nii) \nJE said that he would contact directly. \n+ NC \n3. Pilot Search \niii) Larry has advised he will wait for a decision on Bill \nHammond before contacting a pilot headhunter. \nII \nEFTA00577750\n", "char_count": 650}, {"efta_number": "EFTA00577740", "page_number": 11, "text_content": "KINNERTON STREET \nSTATUS \nITEM \nCOMMENT \n1. Apple Wireless Base Station \ni. Expected to be completed by 11 April. \n12 \nEFTA00577751\n", "char_count": 132}, {"efta_number": "EFTA00577740", "page_number": 12, "text_content": "ZORRO RANCH \nSTATUS \nITEM \nCOMMENT \n4 Update \n1. Pew \ni) \nComplete — pews have been painted. \n+ \n+ \n+ \nUpdate \n2. Security Gate \nii) \nInstallation of cameras has begun. \nCompletion \nexpected end of April. \nNC \nJE plse advise \n3. Fountain \niii) \nAdditional more complete dimensions sent to Pascal \nCorrect quantity of tiles = 1,631 tiles. \nAttached is the proposal, please advise. \nPascale gave JE pictures. Plse advise how to proceed. \n+ NC \n4. Plumbing in Shed. \niv) \nMiller Bonded have completed their project until the \npower is turned on in April/May. \n4 NC \n5. Building for RO \nix) \nIonics installation is scheduled for mid April. \n+ I. pdate \n6. MH Trees \niv) \nComplete. \n+ NC \n7. 40 Ft Digital Screen \nxi) \nJE still to advise on proposal received from Larry \nJacobson for cinema and drive-in. \n+ Update \n8. \nMain House lutron system \nnot working properly. \nxii) \nCompleted. \n9. \nRepeaters for MH \nCellphone & Radio \nCoverage \nxiii) The repeaters would run approx. $4,000. The problem \nis \nrunning \nthe \ncables \nthrough \nthe \nwalls. \nMike advised he is not capable of this. The first quote \n13 \nEFTA00577752\n", "char_count": 1114}, {"efta_number": "EFTA00577740", "page_number": 13, "text_content": "STATUS \nITEM \nCOMMENT \n+ JE to advise JE \nto advise \nreceived was $12k on the low end to as high as $20k if \nthey encountered problems. A company called \nSpectralink is putting together a bid. \nSee attached quotation = $11,031.00. \n+ Update \n10. Repair crack in kitchen tiles \nxiv) Tiles will be completed by 21 April \n+ NC \n11. Water Rights \n12. Phase Power/Water Well \nxv) Shannon has received notice for the Dakota well \napplication from the Office of the State Engineer. \nxvi) Approximately one half of the power line installation \nhas been completed. \n13. \"Z\" to be lit up. \nxvii) Approval given. Special light was ordered to resist \nwind. To be delivered 1St May. \n14. Boulders \nxviii) Approval from JE given to shine the boulders from the \nfront. Awaiting quote. \n14 \nEFTA00577753\n", "char_count": 788}, {"efta_number": "EFTA00577740", "page_number": 14, "text_content": "LITTLE ST. JEFF'S \nSTATUS \nITEM \nCOMMENT \n+ Update \n1. \nFixed Roof Yoga Deck \n(items 1, 10, 11, 14, 18 & 25 are \nall pending on the same permit) \ni. \nii. \nPermits for Yoga deck, pool house, new house \nbuilding site, steam room etc. The principle architect \nrunning with this project is off island. Miles \nunderstands that there has being no movement with \nfinalizing this project. \n+ Update \n2. Telephone system \nTelephone system. The low audio is caused by static \nand water in the lines and Vitelco, USVI cable and \ntelephone provider, is working on the problem. No \ndeadlines given. \n+ \n+ \nNC \nJE to advise \n3. Flags from LA \niii. \nPoles and flags have arrived and are on LSJ. JE to \nadvise on placement. \n+ Update \n4. Sea Water Pump \nPond Pump \niv. \nMiles corrected the problem with pvc piping and some \ncouplings. \n+ Update \n5. Large Beach House \nElectricity \nv. \nFull installation to be complete. \n+ NC \n6. Maintenance & Storage Shed \nvi. \nCheck received and passed onto FTC for depositing. \n+ Update \n7. Shotgun \nvii. \nCompleted. Shotgun has been delivered. \n+ Update \n8. New House Building Site \nviii. \nPermits for Yoga deck, pool house, new house \nbuilding site, steam room etc. The principle architect \n15 \nEFTA00577754\n", "char_count": 1230}, {"efta_number": "EFTA00577740", "page_number": 15, "text_content": "STATUS \nITEM \nCOMMENT \nrunning with this project is off island. Miles \nunderstands that there has being no movement with \nfinalizing this project. \n+ NC \n9. \nCart Paths Reduce Grades \nix. \nAwaiting lawyer's letter by end of April. \n+ \n+ \n+ \nUpdate \nNC \nNC \n10. Dock & Dock Lights \nExtra Pilings for Dock \nFloating Dock \nx. \nxi. \nxii. \nxiii. \nInstallation has begun. \nExpected completion \n30 \nApril. \nPilings are in place. Moulds are on island and these \nwill be cast as soon as possible in the New Year. \nProject on hold until CCM permit inspection is \ncompleted. \nOnce the new pilings are cast, the floating dock will be \nre-built to fit between the hard dock and the new \npilings to provide a swimming platform. \nTo be reconfigured as a permanent dock with \nswim ladders, railings etc. This is due to happen \nonce the CCM permit inspection is complete. \n+ NC \n11. Plant Planters \nxiv. \nSupplier in Puerto Rico is awaiting stock of 42 inch \nhigh pots were due late-Oct but delayed. The items \nwill be delivered as soon as they become available for \nJE approval — no date available. \n16 \nEFTA00577755\n", "char_count": 1101}, {"efta_number": "EFTA00577740", "page_number": 16, "text_content": "STATUS \nITEM \nCOMMENT \n+ Update \n12. Poolhouse by Existing Pool \nxv. \nPermits for Yoga deck, pool house, new house \nbuilding site, steam room etc. The principle architect \nrunning with this project is off island. Miles \nunderstands that there has being no movement with \nfinalizing this project. \n• \nNC \n13. Lamps & Lanterns \nxvi. \nJE has requested new lamps & lanterns be purchased. \nGM to supply information & pictures. \n+ JE plse advise \n14. Main House Outside Lights \nxvii. \nJE to advise during visit. \nUpdate \n15. Steam Room \nxviii. \nPermits for Yoga deck, pool house, new house \nbuilding site, steam room etc. The principle architect \nrunning with this project is off island. Miles \nunderstands that there has being no movement with \nfinalizing this project. \n) Update \n16. Roll on/Roll off Truck \nxix. \nItems to purchase. Truck and bins are operational. \nFirst bin is on island. Miles would like to propose a \nfull maintenance, storage and delivery proposal that \nwould cost $1600.00 per month but is setup to ensure \nthat the truck and bins are well looked after. The \nproposal is with the company that provides us with \nbarging services. The monthly cost is on a par with the \nprevious bin provider when bin rental, barging, \nstorage, trucking to the dump etc is taken into \nconsideration. Please advise. \n) \nL, pdate \n17. Replace AC Units in Guest \nRooms \nxx. \nJE approved = $6,585.00 \nProject will commence once the technicians have \n17 \nEFTA00577756\n", "char_count": 1462}, {"efta_number": "EFTA00577740", "page_number": 17, "text_content": "STATUS \nITEM \nCOMMENT \ncompleted the gym. The equipment is on island. \nEstimate labor and material cost to remove and replace \nceilings $2200. \nUpdate \n18. New Development \nBeach entrance and new \nroad to main house. \nxxi. \nC Miller to provide update. \nxxii. \nThe road works are completed and await JE approval. \nLandscaping is subject to JE approval. \n19. Tiles for Beach Hut \nxxiii. \nTiles arrived are incorrect. Linda Pinto confirmed they \nordered the incorrect tiles. New tiles are now on order \nand expected first week of March. \n28. Update \n28. Update \n20. Seamore, Nanna, Fat Cat & \nLady G2 \nxxiv. \nNanna - Is operational. Some cosmetic work remains \nbut should be completed today. \nFat Cat — is in St Thomas. Boscoe is currently \ncompleting the installation of the exterior. Miles \nbelieves that some work needs to be done to the interior \nto strengthen one bulkhead and to make the interior \nmore cosmetically pleasing. Quote received is for $ \n6500 which includes all materials and labor. Please \nadvise. \nYamaha are not going to release a 300hp engine. \nMercury 300 CFI is now believed to be the best motor \non the market. Quote to replace Yamaha to Mercurys \ngiven to JE awaiting approval. \nSeamore - New engine will be transported by tropical \n18 \nEFTA00577757\n", "char_count": 1274}, {"efta_number": "EFTA00577740", "page_number": 18, "text_content": "STATUS \nITEM \nCOMMENT \nshipping. Miles will provide a full quote for installation \nbefore project starts. \nLady G2 - Engine is repaired and the boat is back on \nLSJ. Engine is not reliable but was repaired under \nwarranty. Larry is investigating and awaiting approval \nfor the purchase of a Johnston 4 stroke engine which \nwill replace the Mercury. Larry is purchasing a new \nfour stroke engine and should be available for shipment \n28 Feb. \n28. Update \n21. New Office area below \nMBR \nxxv. \nPermits for Yoga deck, pool house, new house \nbuilding site, steam room etc. The principle architect \nrunning with this project is off island. Miles \nunderstands that there has being no movement with \nfinalizing this project. \n28. Update \n22. MBR Curtain Rod \nxxvi. \nExpected delivery 4 April. \nUpdate \n23. Grotto \nxxvii. \nArchitects have not provided updates to Madison Cox \nper last correspondence Miles received from Cox. C \nMiller is working to get architects to respond. \nNC \n24. Great Room wind \nProtection Panels \nxxviii. \nJE requested that 4 panels be constructed to fit in the 4 \narches to stop the wind and rain from entering the \npatio on the South east portion of the room facing St. \nJohn. Outside contractors have supplied a quote of \n$36000.00 to complete this project as maintenance \nstaff too busy to complete. Miles believes that this \nprice is unacceptable and will look into other sources. \n19 \nEFTA00577758\n", "char_count": 1420}, {"efta_number": "EFTA00577740", "page_number": 19, "text_content": "STATUS \nITEM \nCOMMENT \nxxix. \nSources are scarce at present but Miles will keep \nlooking, as quoted price is too expensive. \n+ \n+ NC \n25. Wildflowers Jasmine & \nSweet Smelling Plants \nxxx. \nFlowers. Gardenias are growing. Jasmines will be \nplanted after the gym is completed. \n+ NC \n26. First Aid Training \nxxxi. \nAmerican Red Cross will give 8 'A hour training \ncourse on island covering CPR, digital defibrillator \nand general first aid. Minimum of 10 people must \nattend at a cost of $50.00 per person with $150.00 \ninstructor fee. Two weeks notice required. Suggested \nattendees: Miles, Boscoe, Bruce, Kurt and Trevor. \nKathy suggested 18 April, please advise. \n+ NC \n27. Wind Generator \nxxxii. \nMr. Epstein has placed positioning on hold. \n+ NC \n28. Poly Pavement Dust \nPrevention \nxxxiii. \nProcess on hold whilst gym is being erected. Miles \ncontinues to spray roads with water to ease dust levels. \n+ Update \n29. Cushion Covers \nxxxiv. \nCompleted. Cushions were picked up 21 March. \n+ Update \n30. Portable Water \nxxxv. \nPortable Water. Additional water requested by JE is in \nST Thomas and needs to be transported to the island. \nThis is due to happen next week. \n+ Update \n31. New Main House \nApproach Road \nxxxvi. \nLinked to item 22. \n+ Update \n32. Stone work on Road Sides \nxxxvii. \nComplete \n20 \nEFTA00577759\n", "char_count": 1320}, {"efta_number": "EFTA00577740", "page_number": 20, "text_content": "STATUS \nITEM \nCOMMENT \n+ Update \n33. Lights for New Road \nxxxviii. \nComplete. \n+ Update \n34. Lights for Master \nBedroom \nxxxix. \nComplete. \n21 \nEFTA00577760\n", "char_count": 157}]}