{"efta_number": "EFTA00577730", "page_count": 3, "url": "https://epstein-data.com/EFTA00577730", "pdf_url": "https://epstein-data.com/pdf/EFTA00577730.pdf", "pages": [{"efta_number": "EFTA00577730", "page_number": 0, "text_content": "Island activities/projects ongoing for the week ending 20 April 2001.\nYOU WILL HAVE PICTURE OF FINISHED WORK E MAILED TOM TO JEE\nPROJECT E MAIL\n1. Boats\nSeamore Minor wiring and painting details need to be finalized in the forward cabin.\nWork will be done around boat usage\nNanna is in the water. The yard is busy finishing the woodwork, installing the new\nwindscreen wipers, rewiring the electrics. All work is scheduled to be finished by\nTuesday next week with clean up to follow.\nLady \"G\". Seats have been repaired and new windscreen ordered.\nNew island boat - All info has been passed onto Larry who is investigating.\n2. Concrete slab at engineering. You indicated that Miles should build the slab. Miles has\nstarted to cast the cement blocks that will support the containers. DPNR has completed\nthe inspection and we are awaiting the permit to start the building. Tracy is coordinating\nthe permit.\n3. Steel shed for vehicle storage area. This has been ordered and is scheduled for delivery\nto the island during May.\n4. Cart paths. You pointed out areas that need to be corrected or additions to be made.\nThese include an entrance to the gully that forms part of the saddle that leads to the\nlookout point facing Dog Island - Completed. There is another point that we need to gain\naccess to. This should be completed by Monday. The point overlooking French Cap\nneeds to be enlarged. This is completed. A small portion of the roads need to be\nresurfaced. Miles will complete once the new cuttings are done.\n5. Flag pole lighting - Miles has ordered two additional lights to be added to the current\nsetup. The whole solar panel system needs to be repositioned or hidden. This is due to\noccur next week.\n6. Dock. Tracy has received an extension to our existing permit to request alterations to\nthe initial plans submitted for permitting. The alterations and discussions are between\nTracy Frank and Rhett. Tracy is off island this week.\nYou wanted Miles to seek costs to extend the existing dock. Miles had a brief discussion\nabout this with Tracy before she left and will finalize when she gets back. Their initial\nEFTA00577730\n", "char_count": 2129}, {"efta_number": "EFTA00577730", "page_number": 1, "text_content": "thoughts would be to set in place a floating structure to avoid the hassle of permitting etc.\nI will give you all the details as I get them.\nDock lighting. You wanted to install surface lights on the dock. The lights and will\ninstaled as soon as possible.\nDock boxes. Purchase two new dock boxes with built in seats.\n7. General bush clearing. We are to clear the dead bush from around the large salt pan\nand along the sides of the cart paths. This is ongoing and we have now completed 50% of\nthe paths.\n8. Cactus planting. Matt is investigating the possibility of transplanting the cactus bushes.\nThese are to be replanted around the small salt pan.\n9. Sweet smelling plants. These have been planted around the master bedroom and placed\nin pots around the great room. Miles has requested more of the same from Matt and they\nshould be on island next week.\n10. Master bedroom roof. Balance of the material arrived yesterday. The roof should be\ncompleted by Tuesday next week.\n11. Lights. A delivery of stone light fittings arrived yesterday. Please indicate where they\nshould be positioned.\n12. Beach decks and lookouts. These need to be oiled with tung oil. The oil has been\nordered.\n13. Grass path entrance needs to be expanded. You gave Miles the dimensions and this\nwill be done next week.\n14. Massage deck on beach. You wanted the sand raked and stone free. This is scheduled\nfor next week.\n15. Yoga Deck (Curved look-out deck) needs steps - This is completed.\n16. Walking trails. You indicated you want some walking trails combined with steps to\nvarious points on the island (Eg Stony beach below the curved yoga deck). Miles is\nlooking for possible sites and solutions to achieve this.\n17. Telephone systems. Steve Scully is scheduled to be on island next week to deal with\nthe following:\nGM call waiting\nGM line not ringing in the office\nMaster bedroom toilet - install telephone\nReinstall re-dial feature\nEFTA00577731\n", "char_count": 1925}, {"efta_number": "EFTA00577730", "page_number": 2, "text_content": "18. Computers. Mark is sending the island a new computer. It is being sent Mon/Tues.\nThis is to be installed in the cupboard in the office. The existing computer will be\nreinstalled on the office desk. Both to have the same setup and features.\n19. Ruins on hill. Bruce to get as much info as possible before your next visit.\n20. Purchase portable generator as approved. Ordered and awaiting delivery from\nGrainger power tools.\n22. Heli pad. Paint the railings white. As these are stained to match the steps, the stain\ndoes not allow paint to adhere. Please advise?\nEFTA00577732\n", "char_count": 578}]}