{"efta_number": "EFTA00577705", "page_count": 1, "url": "https://epstein-data.com/EFTA00577705", "pdf_url": "https://epstein-data.com/pdf/EFTA00577705.pdf", "pages": [{"efta_number": "EFTA00577705", "page_number": 0, "text_content": "71ST\nGM REPORT\n1. Remco require 4 days to re polish the marble floor and I am waiting for you to tell\nme when that would be best\n2. You need to decide what material you would like to redo the back passage floors\nin so that I can get a sample and you can approve it\n3. Th back passage needs repainting. I have received a quote for $3000. When\nwould you like to shedule this and wou should pick a colour.\n4. When the work is finished at 65th\nthe MBR\nis coming to the hse to fix the ceiling in\n5. The ceiling above the door the walls and ceiling in the exercise room also need re\nplaster and then re painting. I have not shown the additional work to the painters\nyet for a quote.\n6. The door closer was put on today. I will have Rich adjust the strength of it Mon\n7. The carpet from the MBR bath was picked up and will be ready approx\n8. The Dome\n9. The curtains and\nneed to be taken down and cleaned.\n10.\nEFTA00577705\n", "char_count": 916}]}