{"efta_number": "EFTA00577479", "page_count": 14, "url": "https://epstein-data.com/EFTA00577479", "pdf_url": "https://epstein-data.com/pdf/EFTA00577479.pdf", "pages": [{"efta_number": "EFTA00577479", "page_number": 0, "text_content": "ESTATE PROGRESS REPORT - November 28, 2003\n71st STREET\nLOCATION\nSchedule\nCOMMENT\nChanges to Pinto's schedule: Mirrors are expected early Jan, not\nearly Dec.\n5th Floor\n1. Front Room\nNEXT\nACTION BY\nDATE\nREVISED\nBY\nDATE\nPinto - Jean\n6th Floor\nCeiling Speakers\nDining Room\na. Front room to remain GM's office.\nb. Metal table style & 2 arm chairs for GM office.\nc. Carpets to be changed.\nd. Current furniture to remain.\ne. Pinto to specify paint color for trim & interior wall finish.\n2. Back Room\na. Back room to eventually become children / nanny room. Pinto\nhas been informed.\nb. Lynn & Jojo are to move into the basement as soon as\nconstruction is complete.\nc. Bathroom to stay as is for the time being.\nPinto\nPinto\nFax sent to Pinto Nov 24 inquiring when the MBR is to be installed Pinto\n- no response yet.\nRound table: is in the process of being restored. Expected\ncompletion by Nov 28-delay due to miscalculation of time frame.\nNo speaker in MBR. Speaker wire in cornices.\n1. Table-top: Brian Kelly is storing new rectangular table-top in\nhis shop until after construction phase.\n2. Lighting: JE approved three chandeliers instead of spotlights.\n3. Carpet: JE approved green-striped carpet.\nJ Burdine\n11/28\nPinto - Jean\nEFTA00577479\n", "char_count": 1235}, {"efta_number": "EFTA00577479", "page_number": 1, "text_content": "LOCATION\nESTATE PROGRESS REPORT - November 28, 2003\nCOMMENT\n4. Speakers: on dining room ceiling.\nEntry Hall\n1. Entry hall door: not to be moved.\nNEXT\nACTION BY\nDATE REVISED\nBY\nDATE\nMain Stair\nKitchen Service\nCorridor\n2. Entry hall marble floor: to remain.\n3. Original chandelier to remain but be painted white.\n4. JE wants silk banners to hang in front entry hall in front of Pinto\nJapanese paintings. Pinto to source.\n5. JE has samples to select exact shade of pink for the entry hall JE\nwalls.\n1. To be re-carpeted - JE saw sample in Paris & did not approve. JE\nJE to advise if he liked new sample sent by Jean to 71st St.\n2. Sconces to ship from Paris week of Nov 10 - delayed to Dec 8.\n3. JE agreed to spotlights for tapestry.\n4. Alberto to make shelves to place sculptures or china pot on by\ntapestry.\nClark/Doug\nKitchen & corridor painted white. Clark to provide prices on\nlimestone floor. Doug has samples for JE to choose from. Pinto to /Pinto\nsend more samples.\nSpeakers\nSpeakers from Zorro mended & are in basement of 71st.\nGym\n1. To be painted by painters that are at 71st St now not French\npainters. Pinto to advise paint scheme.\n2. Sample carpet expected by Nov 26.\nPinto\n3. Yoga Room is to remain the same.\n4. Gym Bath is to remain the same.\n2\nEFTA00577480\n", "char_count": 1271}, {"efta_number": "EFTA00577479", "page_number": 2, "text_content": "LOCATION\nMBath\nMBR\nMirrors\nOriental Rug\nTechnology\nESTATE PROGRESS REPORT - November 28, 2003\nCOMMENT\n1. MBath carpet: border of original carpet to be left & Jean to\nprovide new insert. JE chose blue & white carpet. Pinto has\nselected carpet & is due to arrive in Feb 2004.\n2. Ceiling: complete; scaffold to be removed week of Dec 1.\nNEXT\nACTION BY\nPinto - Jean\n3. Bed & little table: Pinto to purchase. Pinto has been informed Pinto\nto ensure that the bed is delivered prior to completion of the MBR\nwalls so as to make sure the bed fits.\n4. Skylight bars - JE advised to dispose of bars. Skylight is being\nmended.\n1. Windows: approved to be further sound-proofed. Installation to Doug\nbegin after painting & hoisting of scaffold & carpet through\nwindows.\n2. Plaster sconces are at 71st Street.\n3. Wall paper is due end of Feb.\nPinto\n4. Painting & passageway to be painted to match Bedroom. Pinto Pinto - Jean\nto confirm paint color.\n5. Decorative painting in progress - completion in Dec.\nSecond floor landing: Mirrors to be delivered to house Dec 8 - Pinto\ndelayed to Jan 8. Awaiting response from Pinto re installation.\nExpected completion by Dec.\n1. Security: Surveillance Cameras (3rd Floor): wiring complete.\nCameras to be installed once construction near completion. PTV\ncamera outside building installed. Night vision camera installed &\ntested. Installation is in progress.\nCostikyan\nDATE REVISED\nBY\nDATE\nEFTA00577481\n", "char_count": 1427}, {"efta_number": "EFTA00577479", "page_number": 3, "text_content": "LOCATION\nESTATE PROGRESS REPORT - November 28, 2003\nCOMMENT\nNEXT\nACTION BY\nDATE\nREVISED\nBY\nDATE\nComplete\nTerrace\nBio Gear\n2. Computer: Upgrade for Landis BMS - complete. Software has\nbeen loaded on new computer, new graphics installed & complete.\nStatic IP address for offsite connection installed.\n3. Computer Networking - WIFI entire house. Complete except\nin areas under construction.\n4. MBR A/C Upgrade: JE approved MBR fan & cooling tower\nupgrade revised total of $87,022.66 includes electrical, ABB\nDrive, & engineering fees (with design plans for chiller). Awaiting\ncost for adding a separate control panel for Landis to hook system\nup to BMS-proposal expected by Nov 18 - delayed.\nJean to come up with new suggestion.\nPinto - Jean\ndelay\n2 medium, 1 large biosuits ordered. 1L at 65th St, to be sent to 71st Dupont\nSt. The 2M are backordered until Jan 21. Steve Joslin, who\nordered the suits, not able as of Nov 21 to source other suppliers\nfor earlier delivery.\nBlackout Update Since the Black Out the following Emergency Systems have been\nchecked or tested to assure proper operation in the event of a power\nfailure. The following list contains the results of these tests.\n1. Emergency Generator: cooling radiator to be cleaned & flushed.\nTo be done on next maintenance check - not urgent.\n2. Battery Lighting Inverter - battery racks & all 48 batteries are\nstill on order.\nCummings\nMetro Power\n11/7\nEFTA00577482\n", "char_count": 1422}, {"efta_number": "EFTA00577479", "page_number": 4, "text_content": "LOCATION\nESTATE PROGRESS REPORT - November 28, 2003\nCOMMENT\nNEXT\nACTION BY\nDATE REVISED\nBY\nDATE\nMassage Room\nCeiling\n3. Otis: Inspection of the elevator is complete. FYI: In an\nemergency electrical problem, the lift automatically goes to the\nground floor & the doors stay open.\nA regular phone line needs to be installed in the lift Rich to Rich\norganize.\nCeiling to be painted with clouds by the same painters being used\nfor the MBR woodwork. To be scheduled with painters when Jean\non site Dec 5.\nLiving Room\nFire Screen: Jean was told to order one.\nNextel phones\nThe problem when JE was trying to ring|\nwas that\nPinto - Jean\nhad JE\nforgotten her phone in the bathroom. JE to advise if any further\nproblems with this system exist.\n5\nEFTA00577483\n", "char_count": 748}, {"efta_number": "EFTA00577479", "page_number": 5, "text_content": "DATE REVISED\nBY\nDATE\nLOCATION\nOffice Dividers\nESTATE PROGRESS REPORT - November 28, 2003\n457 MADISON\nCOMMENT\nEstimate & floor plan without new desks is in. Estimate & plan with\nnew desks expected by Nov 12 delayed due to H Miller\naccommodating changes & awaiting window tint selection. JE to\nadvise on window samples which were taken to LSJ on last trip.\nOffice Computers 1. Upgrade / change computers, new programs.\nApproved: 20 computers to be re-vamped.\na. LSJ & Z computers ordered & expected by Nov 21 - not arrived\nyet.\nb. Other new computers: 6 to be ordered.\nc. 10 computers remaining to be upgraded as needed.\nNEXT\nACTION BY\nH Miller/JE\nJE to advise fate of replaced computers: Should they go into 301?\nJE\n2. Approved Microsoft Project & hardware upgrades. Solomon Marc / Eric\naccounting system was rejected. Marc is assembling an on-line\ntraining package to familiarize project managers with the new\nsystem. New servers are being installed on Dec 1.\nConference Room Jeff Schantz's room to be turned into a conference room.\n1. 8 Lucite chairs have been ordered week - expected by Dec 12.\n2. Rich to order collapsible table.\n3. Cabinets to be removed from room by Dec 12.\n12/12\nKartell\nRich\nBlackberry's\nAll key personnel,\nhave Blackberry's.\nLarry V, Larry M, Dave Rodgers should\n6\nEFTA00577484\n", "char_count": 1303}, {"efta_number": "EFTA00577479", "page_number": 6, "text_content": "ESTATE PROGRESS REPORT - November 28, 2003\nPALM BEACH\nLOCATION\nCOMMENT\nNEXT\nACTION BY\nDATE\nREVISED\nBY\nDATE\nRenovations\n1. Doug, Pascal, & Marsh met in PB. Doug to interview 4 Doug\nconstruction company candidates on Dec 1 in PB.\nConstruction to commence in Feb 2004 as planned.\n2. Doug has received the plans for enlarging the breakfast room\nfrom Pascal.\n3. JE is considering putting up wooden shutters with in the house.\n4. JE to advise if a house is to be rented.\n5. No work has been done on the Cabana. According to Pascal, he\nwas not aware that any work was requested to be done on it. JE to\nadvise next action.\nJE\nAir Conditioning Approved Cassidy proposal to remove pink room from main Cassidy\nhouse unit & put on a separate unit so that each guest room has\ntheir own unit. To be done during construction phase.\nCassidy has replaced the air ventilator grills in MBR to reduce\nexcess noise.\nPainting\nDock\n1999 Merc S600\nApproved Dock has been sanded & varnished on Nov 21, dry by\nNov 23.\nS600 mechanical work is complete. Currently being worked on\ncosmetically (dent removal & repainting) - expected completion by\nNov 24 delayed to Nov 26.\n11/24\nComplete\nComplete\nJE to view\n11/26\n7\nEFTA00577485\n", "char_count": 1200}, {"efta_number": "EFTA00577479", "page_number": 7, "text_content": "LOCATION\n1997 Merc\nRed Jeep\nLandscaping\nESTATE PROGRESS REPORT - November 28, 2003\nCOMMENT\nStereo is malfunctioning & is being replaced Nov 25. C.D. unit is\nbeing replaced as well since this unit is not compatible with the\nnew stereo.\nJeep is in shop for repairs - expected completion by Dec 5.\nApproved - Stopek has planted aromatic flowers (hedychium) by\nthe pink gate.\nNEXT\nACTION BY BY\nDATE REVISED\nDATE\n12/5\nComplete\nJE to view\nOutside Table\nSection of frosted table top is eroded - replacement panel has been\nordered from Italy & is due in PB by Dec 12.\n12/12\n8\nEFTA00577486\n", "char_count": 581}, {"efta_number": "EFTA00577479", "page_number": 8, "text_content": "ESTATE PROGRESS REPORT - November 28, 2003\nPARIS\nLOCATION\nCOMMENT\nJE office\nHorseshoe table/Ash tray is still expected in December.\nNEXT\nACTION BY\nPinto - Jean\nDATE REVISED\nBY\nDATE\nKitchen\nA/C to be fixed in conjunction with construction. Work to begin\nNov 25 & will take approx 3 weeks.\nPinto\n12/16\nLiving Room\nShower Pump\nPressure\nBath\nSeparation to be added to round end of living room & new section Pinto - Jean\nto be converted into MBR sitting room. Jean met with cabinet\nmaker & decided on custom made light Italian metal covered in\nfabric. FYI: it will take 6 months to make.\n3 valves & 3 shower heads have been installed & according to\nValsdon, there is a \"positive improvement.\"\nJE agreed to new plan for Bath: more cabinets & drawers & a\ndecorative paint scheme on screen.\nComplete\nEFTA00577487\n", "char_count": 805}, {"efta_number": "EFTA00577479", "page_number": 9, "text_content": "ESTATE PROGRESS REPORT - November 28, 2003\nPARIS - NEW APARTMENT\nLOCATION\nConstruction\nGym Room\nCOMMENT\nDemolition has commenced. Expected completion in April 2004.\nOriginal plumber retained. Updated schedule expected by Dec 5-\nSerge said there will be delay in construction due to JE's\nadjustments for the bathroom.\nNEXT\nACTION BY\nPinto - Jean\nDATE\nBY\nREVISED\nDATE\nJE discussed with Pinto on site & decided on wall sconces & Pinto - Jean\ndouble doors.\n10\nEFTA00577488\n", "char_count": 469}, {"efta_number": "EFTA00577479", "page_number": 10, "text_content": "ESTATE PROGRESS REPORT – November 28, 2003\nPLANES\nLOCATION\nCOMMENT\nNEXT\nACTION BY\nDATE REVISED\nBY\nDATE\n727 Boeing\n1. Larry M awaiting fabric selection for office chair. JE to advise. JE\nBell\nHelicopter\n2. Shower water heater & control has removed & is being repaired\nTo be reinstalled while stripe change is being made.\n3. JE requested painted stripe on the exterior to be modified - to\nbe done (except for full length stripe) week of Dec 1 in PB in\nconjunction with shower reassembly & other minor maintenance\ntasks approx 3 day down.\na. The top 1/4\" beige to become a 1/2\" red touching the top\nblue stripe full length.\nb. The blue stripes to be lengthened at the leading edge by 1/2\".\nc. The white stripes to become red.\nd. Changes to fuselage stripe will be duplicated on the tail.\n1. Larry V is confirmed for Bell maintenance course Dec 1-12.\n2. Larry V needs Pilot training for helicopter no later than end of Larry\nJan. Larry to advise re: dates during his maint course training.\n3. Recurrent training: Gary & Maria have completed course.\nNicholas is scheduled for Dec 8-9.\n4. a. Nicholas will be off island Dec 5-9 & Dec 26 - Jan 3.\nb. Maria will be available Dec 1 – 26.\n11\nEFTA00577489\n", "char_count": 1195}, {"efta_number": "EFTA00577479", "page_number": 11, "text_content": "ESTATE PROGRESS REPORT - November 28, 2003\nLOCATION\nCOMMENT\nc. Gary will be available Dec 1 – 30.\nGulfstream\nNo. 2 GIIB engine has been installed. JE advised for Gulfstream\nto be picked up after Thanksgiving\n12\nNEXT\nACTION BY\nDATE\nREVISED\nBY\nDATE\nEFTA00577490\n", "char_count": 260}, {"efta_number": "EFTA00577479", "page_number": 12, "text_content": "LOCATION\nESTATE PROGRESS REPORT – November 28, 2003\nSTAFF\nCOMMENT\nRick Harrington JE to advise if there is any further action to be taken?\nPersonal\nRequests\nNicholas would like to use the Dive Boat that is for sale from\nDec 26 Jan 3 to take his family to Anagada for New Year's. GM\nrecommends no.\n13\nNEXT\nACTION BY BY\nDATE REVISED\nDATE\nJE\nEFTA00577491\n", "char_count": 352}, {"efta_number": "EFTA00577479", "page_number": 13, "text_content": "LOCATION\nDirectories\nNetJets / Flight\nOptions\nSuburban\nESTATE PROGRESS REPORT - November 28, 2003\nMISCELLANEOUS\nCOMMENT\nNEXT\nACTION BY\nDATE\nBY\nREVISED\nDATE\nJE\nPersonalized directories for the houses have been completed.\nJE has revised sample metal binder. JE to confirm approval.\n4 weeks to completion.\nAs of Nov 24, Kocher & other parties are still working on this Kocher\nmatter.\n2004 Suburban for NY has been ordered. Expected by Dec 1.\n14\n12/1\nEFTA00577492\n", "char_count": 460}]}