{"efta_number": "EFTA00577256", "page_count": 2, "url": "https://epstein-data.com/EFTA00577256", "pdf_url": "https://epstein-data.com/pdf/EFTA00577256.pdf", "pages": [{"efta_number": "EFTA00577256", "page_number": 0, "text_content": "Memo\nTo: Emod/Darren/Manuela\nFrom: Bill Karr\nDate: January 21, 2005\nRe: Army Corp of Engineers\nOn this date Amy Dempsy and I traveled to Puerto Rico to meet with Vivian Gerena, the\nProject Manager of the Army Corp of Engineers regarding issues of Little St. James.\nMs. Gerena was courteous and professional and seemed willing to assist us with the\nresolution of the outstanding issues.\nMs. Gerena did however have a number of issues that need to be addressed.\n1. There is concern about the installation of the \"floating dock\". It is unlikely that the\nfloating dock would be accepted, in fact; it is possible that the floating dock will\ncreate another NOVA. If the \"floating dock\" were to be called a \"floating platform\"\nfor swimming purposes that would be a fixed to the mooring when in use and\nattached to the existing dock facility when it is not in use, then it is my opinion that\nthe \"floating platform\" would be approved as presented. Amy concurs with this\nopinion.\n2. The drawings presented for the existing NOVA issues require some additional\nalterations and one more section is required. The ACOE requires an additional\nsection (transverse) through the landing craft bulkhead. They also have requested\nthat some of the presented drawings be re-submitted altering their current\ncataloguing. Moseley and Associates have already been directed to provide the\nchanges required by Amy and I have confirmed this with Moseley myself this\nafternoon. The changes primarily involve reformatting to make them legible for the\npublic notice which must be reproduced at 8 ½ x 11.\n3. The ACOE will entertain the filing in of the salt pond behind the beach, but only if\nwe submit this request within 30 days of this date. They do not want to see the\ndevelopment permitting further piecemealed. They want to finalize all the permitting.\nThey will hold off on the finalization of the docks and include the salt pond approval\nat this time and only at this time. If we do not do it now, they will not want to\nentertain it again. Realistically, they would have to entertain it if we submitted it,\nthey would just make the process more difficult for us. In order for us to submit this\nrequest, we would have to inform them of what we intend to build on the site. We\nwould have to justify its location and explain why another location not in a wet land\narea would work and we would need to supply floor plans, site plans and elevations,\nall within the next 30 days. I am concerned that this could be accomplished within\nthe next 30 days. After some discussion, I learned that the ACOE has lost patience\nwith us on the lack of respect regarding executing work without permits and they do\nnot intend on allowing any other permits accept that which will be delivered within\nthe next 30 days. For this reason I recommend that we provide a plan to create a\nlandscaping garden area where the current salt pond is now. We would excavate the\nEFTA00577256\n", "char_count": 2931}, {"efta_number": "EFTA00577256", "page_number": 1, "text_content": "silt out of the pond to actually create a real pond, with an elevated walkway through\nthe pond as well as a fountain to provide aeration etc. I will of course execute as per\nMr. Epstein's desire. If we create the fresh water pond as an enhanced wetland, it will\nbe a credit to us and will go a great way in appeasing the previous transgressions. By\nthis I mean that at this time we are susceptible to having to still remove portions of\nthe riprap. With the re-creation of the wetland, we would obtain credits to mitigate\nthis issue. Also, I would encourage us to use this credit to implement NOW the\ncreation of the second bulkhead access at the great salt pond for construction. This\nwould limit adverse activities to Mr. Epstein during the construction. This is the\ntime, they are in the mood now to work this out.\n4. It turns out that the R/O intake pipe is also not permitted, Amy requested that we\nlocate a new intake line onto the existing dock for use at the R/O plant. She has\nagreed that if we were to add this element to the package, she would approve it with\nthe dock submission. Currently the pipe size is not adequate for the newly proposed\nR/O plant at the mechanical Building, this is a great opportunity to increase the pipe\nsize and to obtain its permit. I am requesting permission to execute this plan. We\nshould extend the pipe out near the end of the dock and create an intake box which\nhas baffles to limit the intake of sand during boat movements. They will approve this\nnow.\n5. With Mr. Hoffman's removal, Ms. Gerena has informed me that she needs a letter\nfrom Mr. Epstein informing her that I am the new Authorized Agent. With this letter\nshe would provide a new \"Tolling Agreement\" that is required to be submitted within\nthis 30 day time we have to add the other items. If you agree to provide her with this\ninformation, I would appreciate a copy for my files. If not, Mr. Hoffman would need\nto be retained to execute the issues being raised.\nThere are a few other issues to be discussed;\n1. I have received only today the phone information that Mr. Epstein has requested it\nwill be sent FedEx on Monday.\n2. I have received additional information from Tom Payette on Thursday and we will be\nsubmitting the cost estimate for the residence next Friday, the 28th of January.\n3. Next week I will be meeting with a number of engineering firms in Boston and\nOrlando to execute the infrastructure engineering documents. Once I have those costs\nand a preliminary plan, I will submit them to you for your consideration.\n4. I have not yet picked up the building permit for the Mechanical Buildings. I have not\ndone so as once they are picked up, we have 6 months to start construction or we have\nto start that process all over again. Please inform me if you wish for me to pick up\nthose documents.\nI will be traveling most of the week next week. I will be available via cell phone at\nRegards - Bill\nEFTA00577257\n", "char_count": 2929}]}