{"efta_number": "EFTA00522064", "page_count": 2, "url": "https://epstein-data.com/EFTA00522064", "pdf_url": "https://epstein-data.com/pdf/EFTA00522064.pdf", "pages": [{"efta_number": "EFTA00522064", "page_number": 0, "text_content": "Punch List - May 4, 2012\n1. Flagpole Pool Cabana-\n- Recovering of sofa/chairs - to be completed via JE direction in May\n- Furniture - review another piece of furniture - Sarah\nLighting - more down lights outside\n2. Main Compound -\n- Landscaping-purchase goat's foot vine on hillside-investigating options/price forwarded 5/4\n3. Five Palms -\n- purchase Bougainvillea (bright red) for Basket; fill in front of basket with more dirt\n- repairing of coral stone deck areas\n- coral stone thresholds in guest rooms need to be cut\n- Electrical/Phone/Data - reviewing in house option - pull boxes\n- Exterior Door Shutters - require JE approval\n- Interior Doors - due on site 5/21\n-Painting-final outside coat to be completed once all work is finished\n- Waterproofing\n-Furniture - X2 cannonball lamps, bronze lamp-on site\nMirror due on site 5/3 - Brice is this and the mirrored siding the same item? Please confirm\n- Sofa - purchase\n- Rug - on site - will be cleaned before it is installed - Karen\n- Built in Cabinets/shelves - to be completed by Bill - hinges due NYC 4/30 (Karen will bring down)\n- Landscaping-level dirt - continuing\n- relocate grasses - continuing\n-Lights- outside light boxes on back and front walls to be covered over\n- Light parrots and building - from roof line (rectangular 24 X10)\nDesk - at Tropical FL 5/7, scheduled to sail 5/9, EDA on STT 5/12\n- Mirrored siding - sailing from FL 5/4, due on STT 5/8\n-Framed Photos - JE to review 4/30\n4. Grotto -\n- Pavilion - painting to begin 5/1 - white\n- Landscaping - more dirt required on left hand side as you look down, then hydroseed\n-Shutters/generator doors/storage doors - ???\n5. Hangar-\n- Concrete Floor - grinding ongoing\n- Painting - interior paint selected\n- painting floor - completion 5/3-delayed due to power issues\n- Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ\n6. Steel Shed - ABC Concepts proposal forwarded to JE 4/24 - redesign in process\n7. Triangle - needs to be reconfigured, with more dirt on top and less around base\n- more concrete required around edge\n- additional road\n8. Entry Tree Lights - lights on site\n9. Solutions for Generators - Sound proofing solution forwarded to JE, require direction\n10. Top of hill - CLEAN UP - remove rocks - ongoing, and hydroseed\n11. Tiki - Shields - with the vendor in Wewak (5/4) - working on the permit to export - will take 1 to 2 weeks\n12. Sunken Garden Berm - crusher runs - place inside berm area\n- 4 large planter boxes with small planter inside require construction - size to be\ndetermined by JE\n13. Engineering - Clean Up - area needs to be leveled and metal shed to be laid out\n- Landscaping-planting Sea grape\nEFTA00522064\n", "char_count": 2683}, {"efta_number": "EFTA00522064", "page_number": 1, "text_content": "14. New vehicles - two more Polaris bikes (800's) - Larry/Brice\n15. Dock-\n- Entry - redo entry - Brice to source dock wood locally\n- Decking - discuss pressure treated timber/carpeting\n- Floating Dock - design required\n-Jet ski Docking - review\n-Table-final size/design to be determined - coral stone top - Bill\n- Old floating dock - moved to engineering, requires redesigning\n16. Mooring Permit - estimate to place anchors forwarded to JE 4/10 - awaiting direction\n17. Telephone system - remove/add speed dial - programming disc on LSJ 5/1\n18. Gates - Thatch needs to be applied to lower gates - both to be painted\n19. Guest House at Beach 3-sited, needs to be roughed out - start 4/21\n20. Kite House - review of wooden outside furniture - Sarah\n21. Chillax Room - requires furniture piece for electrical/media equipment - Sarah\n22. Chilax Bathroom - requires blue rugs for bathroom & vanity area - Sarah\n- put weather stripping at a minimum on bathroom door (as it is flooded) or change swing\nwith threshold\n23. Mechanical Building\n- Replacement Transformer - approved to purchase, forwarded to Rich K, who has requested an E Mail from JE\nwith approval\n24. Boats\n- Midnight Express - 4/2 approved to purchase Yamaha 300 motors, to be installed by Offshore Marine\n- PRD - sell\n- Lady G - sell\n- Big N - sell\n- ship existing motors to FL, LV to sell - shipping 5/10\n- Calypso - refurbish\n25. Sundial -\n26. Hydro seeding - as much as possible especially when it rains\n27. Gym Road - road material & holes in stone wall need to be added for water drainage-work continues\n28. Outside Master Bedroom - banana Plantation area requires tidying up - 4/30\n-bedroom door to outside to be adjusted and lock added\n29. Entry basket - bougainvillea to be purchased for Basket and dirt added in the front\n30. Nautilus (Main courtyard) area - requires cement band to continue\n31. Relocate Tom's Trailer - area to be used for employee bathrooms\n32. Move beach trees\n33. Compass-hydroseed - 4/30\n34. Sombrero ramp\n35. Landscaping - bananas and bougainvillea\n36. Timers - review installing timers on air conditioners, irrigation water systems, and lights\n37. Life vests - new life vests, yellow and black, in men's and women's sizes - at least 2 of each, if not 4 in\nunisex size so they can be exchanged - Sarah\n38. Beach lighting - per JE, replace existing transformers for the beach lighting of palms around the salt pond\nand beach\n-fix large broken light\n*6ft grader - Jules\nEFTA00522065\n", "char_count": 2473}]}