{"efta_number": "EFTA00522056", "page_count": 2, "url": "https://epstein-data.com/EFTA00522056", "pdf_url": "https://epstein-data.com/pdf/EFTA00522056.pdf", "pages": [{"efta_number": "EFTA00522056", "page_number": 0, "text_content": "Punch List - May 12, 2012\n1. Flagpole Pool Cabana-\n- Recovering of sofa/chairs - to be completed via JE direction in May - project to commence 5/15\n- Furniture - review another piece of furniture - Sarah\n- Lighting - more down lights outside\n2. Main Compound -\n- Landscaping - purchase goat's foot vine on hillside-investigating options/price forwarded 5/4\n- Entry basket - purchase Bougainvillea (bright red); fill in front of basket with more dirt\n-repairing of coral stone deck areas\n- coral stone thresholds in guest rooms need to be cut\n3. Five Palms - TOP PRIORITY\n- Trenching - in progress\n- Electrical/Phone/Data - reviewing in house option - pull boxes\n- Exterior Door Shutters - require JE approval\n- Interior Doors - install new glazing week of 5/21\n- handles need to be large\n-Painting-final outside coat to be completed once all work is finished\n- Waterproofing\n- Furniture - X2 cannonball lamps, bronze lamp-on site\n- Mirror due on site 5/3 - Brice is this and the mirrored siding the same item? Please confirm\n-Sofa - purchase\n- Rug - on site - will be cleaned before it is installed - Karen\n-Built in Cabinets/shelves - to be completed by Bill - hinges for cabinet doors on LSJ - work ongoing\n- Landscaping-level dirt - continuing\n- relocate grasses - continuing\n- Lights - outside light boxes on the mirror and shutter door side need to be covered\n- light parrots and building - from roof line (rectangular 24 X10)\n- sconces are the same as everywhere else\n- Desk - EDA on STT 5/15\n- Mirrored siding - on LSJ 5/9 - installation to begin week of 5/14\n-Framed Photos - JE to review 4/30\n4. Grotto -\n- Pavilion-painting in progress - white\n- Landscaping - more dirt required on left hand side as you look down, then hydroseed\n-Shutters/generator doors/storage doors - ???\n-Genset wiring - scheduling to be determined\n5. Hangar -\n- Concrete Floor - painting in progress\n- Painting - interior paint selected\n-Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ\n6. Steel Shed - ABC Concepts proposal forwarded to JE 4/24 - redesign in process\n7. Triangle - needs to be reconfigured, with more dirt on top and less around base\n- more concrete required around edge\n- additional road\n8. Entry Tree Lights - lights on site\n9. Solutions for Generators - Sound proofing solution forwarded to JE, require direction\n10. Top of hill - CLEAN UP - remove rocks - ongoing, and hydroseed\n11. Tiki - Shields - with the vendor in Wewak (5/4) - working on the permit to export - will take 1 to 2 weeks\nEFTA00522056\n", "char_count": 2534}, {"efta_number": "EFTA00522056", "page_number": 1, "text_content": "12. Sunken Garden Berm - crusher runs - place inside berm area\n- 4 large planter boxes with small planter inside require construction - size to be\ndetermined by JE\n13. Engineering - Clean Up - area needs to be leveled (Jules) and metal shed to be laid out\n- Landscaping-planting Sea grape\n14. New vehicles - two more Polaris bikes (800's) - Larry/Brice\n15. Dock -\n- Entry-redo entry - Brice to source dock wood locally\n- Decking - discuss pressure treated timber/carpeting\n-Floating Dock - design required\n- Jet ski Docking - review\n-Table-final size/design to be determined - coral stone top - Bill\n- Old floating dock - moved to engineering, requires redesigning\n16. Mooring Permit - estimate to place anchors forwarded to JE 4/10 - awaiting direction\n17. Telephone system - remove/add speed dial - Jermaine on LSJ 5/15 to complete with Danny Vicars\n18. Gates - Thatch needs to be applied to lower gates - both to be painted - completed\n19. Guest House at Beach 3-sited, needs to be roughed out - start after Five Palms\n20. Kite House - review of wooden outside furniture - Sarah\n21. Chillax Room - requires furniture piece for electrical/media equipment - Sarah\n22. Chilax Bathroom - requires blue rugs for bathroom & vanity area - Sarah\n- put weather stripping at a minimum on bathroom door (as it is flooded) or change swing\nwith threshold\n23. Mechanical Building\n- Replacement Transformer - approved to purchase - Rich K awaiting invoice to send wire\n24. Boats\n- Midnight Express - 4/2 approved to purchase Yamaha 300 motors, to be installed by Offshore Marine\n-ship existing motors to FL, LV to sell-shipped 5/10, EDA in FL 5/14\n- PRD - sell\n- Lady G - sell\n- Big N - sell\n- Calypso - refurbish\n25. Sundial -\n26. Hydro seeding - as much as possible especially when it rains\n27. Gym Road-road material & holes in stone wall need to be added for water drainage - holes complete,\nroad grading after Five Palms\n28. Outside Master Bedroom - banana Plantation area requires tidying up - 4/30\n- bedroom door to outside to be adjusted and lock added\n29. Nautilus (Main courtyard) area - requires cement band to continue\n30. Relocate Tom's Trailer - area to be used for employee bathrooms\n31. Move beach trees\n32. Compass-hydroseeded 5/9\n33. Sombrero ramp - completed\n34. Timers - review installing timers on air conditioners, irrigation water systems, and lights\n35. Life vests - new life vests, yellow and black, in men's and women's sizes - at least 2 of each, if not 4 in\nunisex size so they can be exchanged - Sarah\n36. Beach lighting - per JE, replace existing transformers for the beach lighting of palms around the salt pond\nand beach\n- fix large broken light\n*6ft grader - Jules\nEFTA00522057\n", "char_count": 2699}]}