{"efta_number": "EFTA00522043", "page_count": 2, "url": "https://epstein-data.com/EFTA00522043", "pdf_url": "https://epstein-data.com/pdf/EFTA00522043.pdf", "pages": [{"efta_number": "EFTA00522043", "page_number": 0, "text_content": "JE Punch List - December 18th, 2012\n1. Clean Up - make as many barge runs as necessary\n2. Equipment and Vehicles\n- Sell equipment\n- No machinery off the island unless approved\n3. Five Palms\n- Picture Frame (86 x 70) & Canvas on site - contacting framer about coming on site\n- Mirrored Siding - removed, stripping/stucco complete - final top coat due to start 12/19\n4. Berm/Top of Hill\n- Brice investigating a wood/paper combination material for hydro-seeding - on site, will start using\n-Pergola construction for high road benches - David - require design details/number from JE\n5. Triangle\n- Installation of lights - to be completed under JE's direction\n6. Flagpole Pool Cabana\n- Furniture - Desk - still in Paris awaiting ETA\n- Area Rug - JE requested 11/7 either soft white/black design or plain white extra soft rug - Sarah\n- Lights - JE to review lights at parking area with Danny\n7. LSJ Dock\n- Dock Carpet & New Trim - final trim work to be completed by 11/20\n8. Dock Boxes\n- David will fabricate a lighter lid - sample at MC Pool - JE reviewed - investigating resin/plastic option, up to 4 ft high\nwill forward by 11/20\n9. Chillax Room\n- Media Center - on site - will not handle the weight of the equipment - need to investigate other options\n10. Chillax Bathroom\n-Install Robe Hook on bathroom door - will be installed 11/19\n11. Boats\n- Lady G-sell - will remain at Nanny Cay until sold. LV investigating selling in NJ\n- Midnight Express-sell - possible buyer on site 12/21\n-Purchase 20 ft Nautica/Center Consol - sourcing locally\n-Purchase New Boat to replace Midnight - require budget\n12. AC - Set all air conditioning to 80 degrees\n13. Landscaping - Peter's List\n-Line all Roads with Rocks & Rocks for Waterfall\n-Rubbish Dump - regrade, berm placement along side road\n- Transformer area on back high road - plant out\n- David to make planter boxes - in production, 1 complete - require JE approval.\n- Relocate 2 palms from Salt Pond to edge of the road near transformer at 5 Palms\n- Black Heli Under Pads - install at top of bike path at MC - Installation to begin 1/10\n-Sea Grape/Citrus Fertilizer/Mulch - where to come with Palms from PR - invoice expected week of 11/17\n- LV to bring sunflower seeds\n14. Roads\n- General re-grading of roads - ongoing - Peter\n- JE requested investigating surfaces that can handle the weight of the heavy equipment - gravel option\n15. Library\n- Chiller - all questions have been answered, Rich & Brice working on pricing\n16. New Employee Bathrooms\n- need to finalize finish material with JE\nEFTA00522043\n", "char_count": 2548}, {"efta_number": "EFTA00522043", "page_number": 1, "text_content": "17. Gym\n-Shelf - to support bronze sculpture-complete-needs to be raised and base painted same color as walls\n- Entire Gym will be painted after visit\n18. LSJ Mooring\n- Mooring approved - installation 12/18\n19. Hangar\n- Fuel Containment Pad - via Cecile 11/13 Plan ready for submission, waiting for finalization of VIPA Lease. Tom\nMelnick unable to complete, sourcing new bid\n20. Steel shed\n- ETA LSJ 12/19 Container will be emptied on LSJ & stored until installation crew on site, Construction crew ETA 1/18\n- JE approved layout for extra metal sections & roller doors to old engineering area. Drawings/photos forwarded to\nBuck Steel\n21. Equipment/Household Purchase and Delivery\n- Italian Deck Chairs - awaiting shipping/delivery details\n- Pool Towels - on site - JE not happy with \"feel\" prefers previous towels. Will discuss with Sarah\n-Pace Clocks ordered 2 units - shipped to incorrect address - reorder\n22. Containers - RO & Generators in remaining container - no offers for purchase\n24. Stone Walls\n-Repair work to replace missing loose stones & complete Heli Pad wall - Gerry & TJ need to discuss schedule with JE\n25. Heli Pad - Wind sock - to be relocated week of 12/17\n26. Cisterns -\n- Bid approved 11/8 Work to start 1/18 expected completion by 2/6 then back to complete the Great Room cistern\nlate Feb\n27. Solar-\n- Solar Lights - to be placed everywhere under JE's directions\n-Solar Vendors - require update from Jeanne\n29. Movie Screen -\n- Larry investigating purchase Stewart Screen & new Blue Ray DVD Player\n30: Pebble Beach House -\n- Fan ordered-on site to be installed week of 12/17\nEFTA00522044\n", "char_count": 1614}]}