{"efta_number": "EFTA00521485", "page_count": 2, "url": "https://epstein-data.com/EFTA00521485", "pdf_url": "https://epstein-data.com/pdf/EFTA00521485.pdf", "pages": [{"efta_number": "EFTA00521485", "page_number": 0, "text_content": "Prime Renovations & Painting\n12 Cora Court\nHampton Bays New York 11946\nU.S.A\n(917) 287-2878\n(631) 680-2238\nBill To\nMerwin Dela Cruz\n9 East 71 St\nNew York\n10021 New York\nItem & Description\n1\nSCOPE OF WORK:\nSite protection\nprotect all work areas using masonite boards\nprotect any walls as needed with plastic covers\nprotect bedroom floors and walls during the duration of the work\n2\nPlumbing\nPrier demolition\n1. shut down water to the steam shower, toilet room and sink\nremove all plumbing fixture\n2. remove toilet water line as well as waste line\n3. relocate water lines including steam head outlet\nrelocate controllers\n3\nDemolition:\n1. Remove 3 brass doors leading into the steam room, shower & toilet\nroom\n4\nSteam Shower\n2. completely demo by removing all the stone and cement boards\nfrom the ceiling, walls, floors and benches\n3. completely remove wall between toilet room and steam shower to\nexpand steam room\nToilet Room\n4. completely demo by removing all stone and drywall boards from\nceiling, walls and floor\nSink area\n5. completely demo sink wall by removing all stone and drywall\nboards and framing\nCart away all debris\nEstimate\n# EST-1176\nEstimate Date :\n10/25/18\nQty\nRate\nAmount\n1.00\n5,000.00\n5,000.00\n1.00\n9,500.00\n9,500.00\n1.00\n11,500.00\n11,500.00\n1.00\n37,000.00\n37,000.00\nEFTA00521485\n", "char_count": 1298}, {"efta_number": "EFTA00521485", "page_number": 1, "text_content": "Item & Description\nFinish Work\n1. frame new bench in stem shower\n2. install 5/8 cement boards to the ceilings, walls and bench\n3. completely waterproof steam shower ceilings, walls and floor\n4. install new tile to the ceiling, walls, bench and floor\n5. grout tiles\nQty\nRate\nAmount\n5\nElectrical\n1.00\n3,800.00\n3,800.00\nsupply and install new exhaust fan exhaust steam into shower\ninstall switch for exhaust fan to turn on when exiting the steam room\ninstall new lighting in steam room\n6\nGLASS\n1.00\n8,500.00\n8,500.00\nsupply and install new glass panels with shower door to the new\nsteam shower\ninstal new glass door to walk-in shower\n7\nPAINT\n1.00\n6,500.00\n6,500.00\ncompletely paint ceiling and walls that are not getting tiles\n8\nCleaning\n1.00\n2,000.00\n2,000.00\nthoroughly clean all the work areas and remove all tools and any\nother debris left\nNotes\nAll tiles and any other fixtures are to be provided by client\nTerms & Conditions\nLooking forward to your business\nEstimate valid for 30 days\n50% deposit required to begin work\nContractor: Prime Renovations & Painting\n(signature).\nClient: Merwin Dela Cruz\n(signature)\nDate:\nDate:\nSub Total\n83,800.00\nTotal\n$83,800.00\nEFTA00521486\n", "char_count": 1176}]}