{"efta_number": "EFTA00521482", "page_count": 3, "url": "https://epstein-data.com/EFTA00521482", "pdf_url": "https://epstein-data.com/pdf/EFTA00521482.pdf", "pages": [{"efta_number": "EFTA00521482", "page_number": 0, "text_content": "Prime Renovations & Painting\n12 Cora Court\nHampton Bays New York 11946\nU.S.A\n(917) 287-2878\n(631) 680-2238\nBill To\nMerwin Dela Cruz\n9 East 71 St\nNew York\n10021 New York\nItem & Description\n1\nSCOPE OF WORK:\nSite protection\nprotect all work areas using masonite boards\nprotect any walls as needed with plastic covers\nprotect bedroom floors and walls during the duration of the work\n2\nPlumbing\nPrier demolition\n3\n1. shut down water to the steam shower, toilet room, walk-in shower\n& sink\nremove all pluming fixture trim\nremove toilet, sink vanity\ntemporary cap all water lines and drains during the duration of work\nAfter all finish work has been completed\n2. reinstall all trim fixtures, toilet, sink and vanity\nDemolition:\n1. Remove 3 brass doors leading into the steam room, shower & toilet\nroom\nafter completion of the work to be reinstalled\nSteam Shower\n2. completely demo by removing all the stone and cement boards\nfrom the ceiling, walls, floors and benches\nWalk-in shower\n3. completely demo by removing all stone and cement boards from\nceiling, walls, and floor\nToilet Room\n4. completely demo by removing all stone and drywall boards from\nceiling, walls and floor\nSink area\n5. completely demo by removing all stone and drywall boards from\nceiling, walls and floor\nCart away all debris\n4\nFinish Work:\nEstimate\n# EST-1172\nEstimate Date :\n10/10/18\nQty\nRate\nAmount\n1.00\n5,000.00\n5,000.00\n1.00\n9,500.00\n9,500.00\n1.00\n24,000.00\n24,000.00\n1.00\n42,000.00\n42,000.00\nEFTA00521482\n", "char_count": 1475}, {"efta_number": "EFTA00521482", "page_number": 1, "text_content": "Item & Description\nSteam Shower\n1. apply 5/8 cement boards to the ceiling, walls and bench\n2. apply Laticrete 9235 with membrane waterproofing to the ceiling,\nwalls, floors and bench\n3. apply tiles to tile to the ceiling, walls and bench\n4. finish grouting tiles\nWalk-in Shower\n1. apply 5/8 cement boards to the ceiling, walls\n2. apply Laticrete 9235 with membrane waterproofing to the ceiling,\nwalls and floor\n3. apply tiles to tile to the ceiling, walls and floor\n4. finish grouting tiles\nToilet Room\n1. apply 5/8 drywall boards to the ceiling, walls\n2. apply Laticrete 9235 with membrane waterproofing to the walls\nand floors\n3. apply tiles to the ceiling, walls and floor\n4. finish grouting tiles\nSink Area\n1. apply 5/8 drywall boards to the ceiling, walls\n2. apply Laticrete 9235 with membrane waterproofing to the walls\nand floor\n3. apply tiles to the walls and floor\n4. finish grouting tiles\nQty\nRate\nAmount\n5\nPAINT\n1.00\n6,500.00\n6,500.00\ncompletely paint ceiling and walls that are not getting tiles\n6\nCleaning\n1.00\n2,000.00\n2,000.00\nthoroughly clean all the work areas and remove all tools and any\nother debris left\nNotes\nAll tiles and any other fixtures are to be provided by client\nTerms & Conditions\nSub Total\n89,000.00\nTotal\n$89,000.00\nEFTA00521483\n", "char_count": 1262}, {"efta_number": "EFTA00521482", "page_number": 2, "text_content": "Looking forward to your business\nEstimate valid for 30 days\n50% deposit required to begin work\nContractor: Prime Renovations & Painting\n(signature).\nClient: Merwin Dela Cruz\n(signature)\nDate:\nDate:\nEFTA00521484\n", "char_count": 211}]}