{"efta_number": "EFTA00287124", "page_count": 5, "url": "https://epstein-data.com/EFTA00287124", "pdf_url": "https://epstein-data.com/pdf/EFTA00287124.pdf", "pages": [{"efta_number": "EFTA00287124", "page_number": 0, "text_content": "9 East 71st To List\nupdated 04/18/12\n6th floor & Roof\nKitchen replaces aerator on sink faucet. RB, will repair work completed\n■ Movie room - Sony projector not operational need theater /audio company to\ncheck to see if it can be repaired. JE needs to make decision or repair or\nreplace projector. Scott had cutting edge look at projector for\nproposal.4/11 JE Decision spend 15K to fix system4/18\n5th Floor-\nMovie room middle black out shade not getting proper signal from crestron\nsystem needs to be checked. JE and Scott Dennett to make decision what\naudio company to do repair. Scott had cutting edge look at system to\ngive proposal. 4/11\nJE desk computer speaker wires are they acceptable? Glass table for printer\nis this good or do we need to order proper printer table. JE decision.\nPurchase new patio furniture for terrace? JE decision.\nTerrace-purchase plants spring flowers. Done 4/11\nPressure wash limestone above terrace and terrace pavers RB will do, Work\ncompleted.3/27\nSkylight all glass old and discolored needs to be replaced caulking needs to\nbe changed. RB will solicit proposal to get cost for glass change out\nAll roof pavers need to be pressure washed. RB will do in April.\nPressure wash cooling tower fan enclosure before cooling season. RB will do\nin April\nHallway needs to be repainted wood trim and doors patched and painted, clean\npaint off hardware. RB to solicit proposal for JE approval.\n■ Clean out and organize lift closet next to Sarah's office RB Work completed.\n■ Purchase window shades for rear bedrooms bathrooms and Sarah's, bathroom.JE\napproved girls need to purchase, SK or SH.\n4th Floor -\n■ Yoga room-new speakers, Cardio equipment make room more useable for JE\nand guests .JE decision how to proceed with room.\n■ Yoga room - purchase lighting or change lighting to over head lighting. JE\ndecision how to proceed.\nReplace light fixture over stone head in bathroom dressing area. RB will install\nweek of 3/28 or 3/29 Work complete.\n■ GYM re organize exercise equipment purchase some new equipment? Hang some\nmotivational pictures on walls. Re think TV audio area always appears messy new\nrack or shelf system for audio equipment? JE decision how to proceed with\nroom.\n■ Plaid room bedroom area - needs new leather furniture, or old set needs to be\nrefinished. Upgrade Flat screen TV to HD and HD cable box and new TV stand\nJE decision. If decision to proceed we will solicit proposals.\nEFTA00287124\n", "char_count": 2437}, {"efta_number": "EFTA00287124", "page_number": 1, "text_content": "Elephant room - replace white carpeting, carpeting is worn and discolored around\nall base board areas. Upgrade Flat screen TV to HD and cable box order new TV\nstands. JE decision, IF decision to proceed we will solicit proposals.\n3rd Floor -\n■ Repair all scratched and damaged woodwork in entrance corridor and\nbedroom stair well. RB will solicit proposal for JEE approval.\nBedroom and sitting room area - clean blue chandeliers.\n\"\nClean glass light fixtures in hallway and bedroom staircase. Done 3/25\nFlat screen TV for bathroom area? JE decision.\nPurchase new window shades in dressing room areas due to discoloration and\ndamage to existing shades. SK or SH to purchase.\n■ Re paint over Master bathroom ceiling mural? JE decision\nClean master shower stone and re grout. RB to solicit company to do on\nT&M.\n2nd Floor-\n■ Kitchen area - replace old blue carpet on floor with proper kitchen flooring. JE\ndecision.\n■ Clean chandelier and hanging light fixtures. RB to solicit company to do on\nT&M.\nHidden office behind library - is this room becoming a t.v. area as J.E. discussed\nor breakfast room. I removed all office computer & fax equipment. JE decision.\n1st Floor-\n■ 1st floor security office - touch up black wall paint scratches easy, find protective\ncoating for black walls. Install counter top security console. RB to have Ion to\ngive proposal and solution to problem. Ion solved marks on wall can be\nrubbed off with water and clean sponge.\n■ Replace security monitors at side of front door - two burnt out monitors. RB has\nproposal for JE Approved Installed work Completed.\n■ Replace entrance spotlights with proper fixtures for silk/screen oriental paintings\nJEE decision & approval and design? RB repaired light fixtures all four\nworking.\n\"\nReplace cocoa mat Front door? JEE decision\nLounge area Sue's office purchase new furniture. SH to purchase.\nMain Grand Stair case have Ion touch up Venetian plaster walls door entrance to\nelevator corners damaged. Ion working new paint concept.\nEFTA00287125\n", "char_count": 2010}, {"efta_number": "EFTA00287124", "page_number": 2, "text_content": "Entrance stairs-install new carpet runner on stairs?, have stone stairs front door\nlanding cleaned again. Change lighting scheme in entrance. JE decision for\nrunner & lighting .RB to solicit company to clean stone on T&M.\n■ Pantry corridor and kitchen area - replace vinyl wood floor. JE decision.\n■ Re finish front entrance wood doors .RB proposal for JEE approval. Proposal\nfor $10.000.00 same people who did Lutnick front door.\n■ Repaint kitchen and pantry corridor. JE decision RB to have Ion to give\nproposal.\nDining room - Repaint change carpet? JE decision.\nCellar Area -\nLaundry room-Re paint touch up walls, doors, and trim. RB will do week of 4/1\nLynn and Jojo's apartment - repaint entire apartment, kitchen area install all new\nappliances on order, and kitchen exhaust system purchase all new furniture and\ncarpet. RB & SK work in progress.\n■ Catering kitchen - repaint entire room, clean all stainless steel. RB to have Ion to\ngive proposal for paint. Staff to clean stainless steel. Cleaning done.\n■ Entrance to basement from front of house needs to repainted, plastered, steel steps\nneed to be wire brushed work. In progress.\n\"\nOrganize art storage room. RB work complete.3/28\nMaytag washer #1 needs new bearings makes loud noise in spin cycle I have a\n$560.00 proposal for the repair JE approved Work Complete 3/26\n■ Remove all rubbish in yard need to hire carting company, Purchase more fire\nwood and cover with tarp. RB will solicit company and do on T&M Schedule\nrubbish removal week of 4/16\nMechanical-\n■ Replace Stand pipe sprinkler alarm panel defective beyond repair. RB to solicit\nproposal this system is original to house,and is not supported by ADT.Their\nis only one technician in ADT that is familiar with this control panel he had a\nused control board by luck on his repair truck and fixed the panel, it worked\nfor a few months. If I plug in it will alarm randomly and send alarms to all\nhouse key pads and disturb everyone in the middle of the night. In Progress\nelectrical design engineer to review system week of 3/20 .ADT sent email with\nprojected costs.I will look into other alarm companies. Called Sawyers\nsending zone lists. Sawyers to do walk through with electrical engineer week\nof 4/16\n■ Infrared test all steam traps on entire steam system. Replace defective traps. RB\nseasonal maintenance. RB Done\n■ Drain and clean cooling tower sump order suction baffles and filter screens for\nsump from BAC. RB seasonal maintenance RB to solicit proposal to order\nparts needed to be done due to age of cooling tower sump. It will need total\nreplacement in the near future. JE approved parts arrived 04/09/12\nEFTA00287126\n", "char_count": 2650}, {"efta_number": "EFTA00287124", "page_number": 3, "text_content": "■ Remove and clean suction filter screens on all condenser water pumps. RB\nMay1st\n■ Replace three defective steam condensate pumps. Steam condensate pump out\nsystem. RB will get proposal for cost of pumps for JEE approval, I will\ninstall new pumps this system is original to house and failed due to age I\nhave repaired several times over the past 10 years system bypassed to sump\nejector system started to leak on the end of the steam pre heat season. This\nneeds to be replaced before the next heating season. JE approved removal of\npumps on 3/20 Work is completed 3/26\n■ Replace cooling tower chemical pump feed system for biocide and corrosion\ninhibitor with cylinder tablet feed system from clarity chemical co. RB sent to\nRK for E mail with cost for approval, the current pulse feed system does not\ngive the cooling tower water the proper chemical treatment due to low feed\nrates that clog up feed pump system constantly. This is an up grade to assure\nthe high efficiency chiller cleaner water and better electrical efficiency\nduring the summer operation. I asked Clarity chemical to come up with a\nsolution to this issue. JE & RK approved parts on order.4/6 Installation 4/19\n■ Replace siemens steam pre heat valves on AC-2, AC-4.RB found during steam\npre heat operation valves not holding set points. RB will solicit proposal for\nreplacement of valves needs to be done before next heating system this\nsystem operates and is valved on when outside temperatures fall below 32\ndeg.F\nPerform NYCFD .standpipe sprinkler 5 yr test with licensed fire suppression\nplumber RB received proposal for $1800.00 scheduled for August 24th 7:30am\n■ Paint front of house all black steel bars on tree pits, terrace guards, 2nd fl., 3rd fl.,\nrear of house set back railings. RB sent proposal to JE rejected .JE requested\nJoJo and Merwin will paint.\n■ Replace AC-1 fan motor hold down bracket breaking away from motor. RB to get\nprice on motor I will order on week of 3/12 needs to be done! I just found\nproblem motor problem due to age 24 hr operation original to house. JE\napproved parts on order. Received motor Work Completed 3/26\n■ Infrared test and tighten all electrical connections to main MCC high voltage\npanels. RB to solicit proposal from testing company for JEE to approve, this\nshould be done due to age and usage of electrical MCC panels 24 hr use of\nequipment in residence. JE on hold We need to discuss needs to be done AC-\n3 burned out back to 50 amp breaker melted fuse block!! Approved\nscheduled for week of May, 1st\n■ Purchases Nortek humidifier replacement cylinders for AC-1, AC-2, and AC 3.\nRB to do seasonal maintenance item. RB will purchase and install only one\ncylinder in stock. Work completed\n■ Replaced condenser motor for ac unit that supplies ac to basement main security\nroom and helps supply additional ac to server room. RB in process of repair new\nmotor bracket needed will pick up week of 3/26 Work Complete 4/18/12\nEFTA00287127\n", "char_count": 2953}, {"efta_number": "EFTA00287124", "page_number": 4, "text_content": "Pressure wash all cooling coils on all main air fans AC-1, AC-2 AC-3 AC_4 and\nall reheat zones to all rooms. RB to do cooling season start up PM. RB will\ncomplete project by May 1st.\nTest emergency generator ATS switches EPP and emergency life safety\nsystem.RB to solicit proposal for JEE approval for electrical engineering Test\nCompany to assist in testing. We should run in emergency mode at least once\nper year. Scheduled for June, will give cost for project.\nReplace Spence low pressure low volume steam control valve, steam reduction\nstation SC Level .RB replaced valve on 3/23 work complete.\nReplace fan motor for bedroom stair case ac-unit AC-6, replace fan motor for unit\nheater for court yard heater, RB removed motor having problem finding\nreplacement motor manufacturer discontinued line searching for\nreplacement I will forward price when I find proper motor unit failed due to\nage. RB to remove week of April 24\nServer room ac unit needs to be re piped and tied into cooling tower condenser\nwater system and taken off domestic water. RB reviewing nearest condenser\nwater piping for tie in I will give cost to resolve problem this is not legal in\nNYC.\n■ Re paint & plaster leak damaged walls service stairs/fire stair case and dirty staff\ntraffic areas. RB painting Work in progress plastered and sanded 1st floor\ncomplete work will be completed by 4/1\n■ Emergency Repair AC-3 6th floor Motor burned back to main 50 amp\nbreaker Removed old motor and drive,ordered new motor from castallano\nmotors$685.00 Installed found more operational problems .replaced motor\ncontactors checked all voltages .Electrician to come in on 3/26 to check problem\nelectrician found bad service breaker from service switch. Bypassed 30amp\nservice breaker until breaker can be replaced motor ok fan running.3/26\nEFTA00287128\n", "char_count": 1815}]}