{"efta_number": "EFTA00286410", "page_count": 1, "url": "https://epstein-data.com/EFTA00286410", "pdf_url": "https://epstein-data.com/pdf/EFTA00286410.pdf", "pages": [{"efta_number": "EFTA00286410", "page_number": 0, "text_content": "Landmark Hearing for addition to \nMitchell Home at \nNew York \nOverview: \nDavid and Jamie Mitchell wish to add a small 1000 square foot addition \n(apx) above their existing home, which they built. Previously, Landmarks \nPreservation Committee (LPC) approved a previous applicant of a two-story \naddition. The Mitchell's have only built one-story. Our building's Co-op and \na number of our neighbors have submitted a letter in favor of the addition. \nHowever, we have one neighbor who is opposed and is anticipated to have \nspeakers at the hearing to speak against our proposed addition; therefore, \nyour support is very meaningful and needed. \nProcess: \nAt the public comment section of the presentation, the public is asked if \nthey would like to speak. At this point, you can get up and in your own \nwords, please state that you either work or live in the Upper East Side \nHistoric District and you are speaking in favor of the project. \nNote: it would be helpful if you can say that you work in the design, \narchitectural, engineering or visual field. \nOnce finished, you can either sit and listen to the rest of the speakers or \nleave, as there will be no follow up questions from the Commission. \nPoints to be made in your own words \n1. The mock up that the applicant has constructed is not visible from \nthe cross streets of \nThe mock up \nis slightly visible when you walk blocks north on Madison Avenue \nand only visible from locations east of Park Avenue. \n2. The small bit that is visible is no more visible than recently \napproved additions in the Upper East Side Historic District \n(11 East 68 Street, the Carlton House, among others). \n3. The addition that the Mitchell's are proposing seems like an \nappropriate addition to the existing secondary structure on the \n11th floor east elevation, back to a utility brick and enhances the \nexisting structure. \n4. The proposed yellow brick that matches the existing brickwork of \nthe building is most complementary to the top of this important \nbuilding versus what is up there now, industrial metal panels from \nages ago. \nS. The proposed addition is lower than the existing water tower and \nelevator bulkhead and chimneys. \nIF YOU WOULD LIKE TO EMAIL, PLEASE FORWARD TO \nJenny Fernandez, \nDecember 9, 2014 \n9.30 am \nSign in for Speakers 9.00 am \n1 Center Street, New York NY \n9th floor hearing room \nPlease below the list of the serving \nCommissioners: \nCommissioner \nCommissioner \nCommissioner \nCommissioner \nCommissioner \nCommissioner \nCommissioner \nCommissioner \nCommissioner \nMeenakshi Siinivasan, Chair \nFrederick Bland \nDiana Chapin \nMichael Devonshire \nMichael Goldblum \nChristopher Moore \nRoberta Washington \nAdi Shamir-Baron \nJohn Gustafsson \nLandmark Hearing for addition to Mitchell Home a \nNow York \nEFTA00286410\n", "char_count": 2783}]}