From: Gary Kerney < Sent: Wednesday, May 11, 2011 5:24 PM To: Jeffrey Epstein Subject: bathroom Attachments: 002JPG; 003JPG; 004.1PG; 005JPG; 006.1PG; 007JPG; 008JPG; 009JPG; 010JPG; 011JPG; Restroom Floor plan.pdf; Restroom Site plan.pdf =80DY> =DIV>Attached are a site =Ian, a floor plan and pic's of this plan taped on the in the =ield =DIV> =DIV>the breezeway between the buildings is =rawn the same 7+- as the N =reezeway of the relax room =DIV> =DIV>the roof is pitched to flush into the =xisting roof and I see the roof over the breezeway connection to be =tat =DIV> =DIV>if this looks right ,I suggest we get =ejonge to sketch it up, he has a pretty good 3d renderer,there is =ot much of a design issue =DIV> =DIV>l would get $ estimate prior to =tart =DIV> =DIV> =DIV> 1 EFTA_R1_02021876 EFTA02688687