From: Larry Visoski < Sent: Saturday, September 28, 2013 10:35 PM To: Eric Roth Cc: Jeffrey Epstein; Jay Massar Subject: Re: Some of the Squawks - please read GIV will return to Islip Wednesday Oct=3rd evening 7:30pm repairs, The aircraft will be in Islip until Oct 1=th. to complete this list. #1 item Nose Camera nee=s be addressed during this visit. Divan- JE notes that the foam build up=on the GIV is different than the Glib. Main Cabin Area Fluorescent Li=hting- As identified prior to flight, there are certain light= in the upwash / downwash lighting that are inoperative and/or intermittent= this item was working normal on arrival before interior removal.8cnbs=; Doors - There are a couple of door in the galley and aft lavatory=that opened in flight. (doors under bathroom sink.) =span style="font-size: lOpt; font-family: Arial, sans-serif;"> R/H #2 Master Switch Panel-c/=pan> Tables- JE noted difficulty in the deployment / stowing of t=e side ledge tables in flight. The VIP tray table lid does not open DURING f=ight under pressurized flight, works normal on ground, needs more clearance= Entertainment System - Obviously w= need to send the battery back-up out for repair/ replacement so that it ho=ds the institute settings of the head unit. Cockpit Camera- Need=nose camera installed or repair of current system. EFTA_R1_01947451 EFTA02672926