From: Eric Roth <[email protected]> Sent: Wednesday, June 21, 2017 9:50 PM To: jeffrey E. Cc: Richard Kahn; [email protected] Subject: Preliminary for review Jeffrey, As per our discussion a few minutes ag=, I did not include the work TBD on the pocket door for the cabin side. CHANGE ORDER ITEMS R=QUESTED </=> 316 Fwd Lavato=y Door $ 870 Design and fabricate a wood ven=er overlay cover for the vacant / occupied sign to make it aesthetically blend in with the=interior and not make it so conspicuously obvious. The cover will have one (1) hole that will dis=lay either color green (for vacant) or red (for occupied) and a thin horizontal slot for the lock ov=rride pin. </=> </=> 317 Fwd Crew G=lley $ 15,780 Remove=the existing hot water container and associated wiring. Modify the space t= accept a customer supplied carry on small coffee maker (loose equipment). Relocate existing drawer if possible. All interio= surfaces to be painted to match existing. Install new 110v 60Hz provision=l outlet and associated wiring. 404 Hand Rails=$ 4,820 Unfast=n the cabin area PSU / valence assemblies to gain access to the wood venee=ed hand EFTA_R1_01884090 EFTA02646811