From: brice gordon Sent: Tuesday, December 18, 2018 3:33 PM To: [email protected] Subject: Fwd: Barge Do wish for me approach Barry Loudermilk?Regarding this work Sent from my iPhone Begin forwarded message: From: michael g=idden Date: December 18, 2018 at 8:15:06 AM MST To: J <[email protected]> Cc:</=> brice gordon m» , Richard Kahn c Kyle reav is ommouppinium Subject:<=b> Re: Barge Good Morning. Wi=h regard to the barge, 3 weeks is the expected time needed for the exhaust w=rk, the rub rail installation, and also inspect and address rudder alignmen= along with propeller inspections. There is also a list of general maintena=ce items Boscoe has that can be attended to while out of the water for that=3 weeks. With reg=rd to the scope of electrical work to be done there are two items on LSJ th=t will be done with a combination of in house labor and local contractors. T=ey would be the duc bank from the generator building to the sea water intak= building that will include the new fiber for the desal system and the repa=r of the 5 palms electric and fiber feeds due to your request that the work=be done as soon as possible. The material for th= duc bank is on island and the material list for 5 palms is going out today=for pricing. I was going to have LSJ purchase all the material and have a l=cal contractor install for which I am going to get two prices. The only area where the amount of potential work is likely to inter=st a stateside company would be GSJ. The issue w=th getting bids at this point is any scope of work that may be put into a l=st is simply an idea with no engineering or design to base an actual bid on= Before you can issue a scope of work to be bid on the=e needs to be a considerable amount of time and money spent with an enginee=ing and design firm to produce drawings and/or designs, on paper, that cont=actors can then put a dollar figure to. I reached out t= Springline for this specific purpose and they declin