From: jeffrey E. <[email protected]> Sent: Wednesday, April 22, 2015 7:39 PM To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions page 9 elevaion is wrong shoudl extend past te= wall O= Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace < wrote: Gree=ings Sir, Revisions from John for your review and comme=ts. Respectfully, Daphne Forwarded message From: John P. Woods, AIA < Date: Wed, Apr 22, 2015 at 2:03 PM Subject: R=O. & Generator Bldg. Revisions To: Daphne Wallace < <mailto », ann rodriquez < Daphne, 4>=A0 > > Attached are the revised drawings for =he R.O. & Generator Building Roofing project. These changes are based =pon comments from Mr. Epstein at a recent site visit on Friday, April 17, =015. In summary, the changes requested are as follows: 1. =C2* The longer building (R.O. Bldg.) will be expand=d to a width of 60 feet. There will be roll up doors on both of the short =nds. The two long sides will have no openings. The exterior sheathing shal= be a typical metal siding provided by the steel building manufacturer. Th= eave height of the building shall be reduced to 12 feet to minimize the h=ight of the structure. This will also result in the roll up door height be=ng reduced to 10 feet. 2. 4>=A0 The shorter building (Generator Bldg.) will have e=terior sheathing that is the typical metal siding provided by the steel bu=lding manufacturer. The height will be increased to 20 feet to accommodate=a roll up door 16 feet in height. This is the minimum height established b= the LSJ maintenance staff to accommodate the roll on roll off activities =f the dumpsters. qu> EFTA_R1_01631419 EFTA02502891