From: jeffrey E. <[email protected]> Sent: Friday, February 26, 2016 3:39 AM To: Ann Rodriquez Subject: Re: Solar. Great St. James Stand Alone PV system ok On Fri, Feb 26, 2016 at 1:09 AM, Ann Rodriquez wrote: Ann R. Begin forwarded message: From: Date:=/b> February 24, 2016 at 2:52:07 PM AST To: Su=ject: Great St. James Stand Alone PV system Afternoo= Ann, After meeting with Danny and having a look at the existing stand alone=PV system I propose the following: Step 1; Analyze and assess the present system to ensure peak performance and o=tput. 1) Test specific gravity of each cell in every battery. (This is norma=ly performed after "equalizing" the batteries to get the "b=st case" results. Once we open the batteries and get a preliminary in=pection we'll determine procedure) 2) If equalizing is needed fill =ells and pulse charge to desulfate then check the cells 3) Determine which batteries need replacing and build a map to track a=e and deterioration 4) Check all cable and equipment connections and apply Nolox 5) Test combiner box to ensure we have full output from each string of=the solar array 6) Develop cost to bring system back to peak output 7) Recommend site improvements to improve longevity and performance 9) Discuss generator tie in and Auto Transfer Switch via existing Sunn= Islands charge controllers 10) Develop plan to interconnection needs to monitor and track system =hrough existing SMA Webbox. (connectivity required) Cost of initial inspection and report (includes minifuses, Nolox, sulf=ric acid, and distilled water) Date proposed 2/29.3/01, 3 technicians, $1875.00 EFTA_R1_01582906 EFTA02471350