From: jeffrey E. <[email protected]> Sent: Sunday, June 12, 2016 9:33 PM To: Larry Visoski Subject: Re: B727 have somoen else check, On Sun, Jun 12, 2016 at 5:3= PM, Larry Visoski < wrote: Jeffrey, Yes, tank issue wou=d be addressed since Aux Tank removal is required during this C Check. Current issue with Aux Tank is operationally we can only use 1 pump =n each tank for six fuel removal, compared to dual pump ops. The C Check no fly deadline is driven by mandatory AD'=s that come due July 12, 2016, we have already asked for extension„ FAA w=ll not extend Mandatory AD., According to Larry Morrison. =br> Thx Larry Sent from my iPhone<=div> On Jun 12, 2016, at 5:13 PM, jeffrey E. <[email protected]> wro=e: can the c =heck be delayed, dont we also have tank issues? On Sat, Jun 11, 2016 a= 5:14 PM, Larry Visoski > wrote: First Engine repai= of both Engines 2 and 3., $150k Estimate, this would allo= us travel until July 12th, 2016 Second Flat rate is $587k <=iv>Plus unknown repairs of $500k estimate, $1M to $1.2M+++ depending on co=rosion findings„ Full interior removal. Third, ADS•B out is required this year,. only guess $80= GIV had completed already., EFTA_R1_01567544 EFTA02461483