From: brice gordon Sent: Saturday, May 5,20183:03 To: jeffrey E. Subject: Re: LS1 SW RO Refurbishment tha=k you <[email protected]</=» wrote: ric= negotiate and do all On Sat, May 5, 2018 at 9:02 AM brice gordon wrote: Rich Attached are proposals from both TS= and GWS (Gemini Water Services) for the refurbishment of the SW RO =n LS1 As shown there are= Immediate Repairs required Replacement of Control Panels, 75 hp =otor, Pump and Media filter service. This is outside of any work TSG have already been ap=roved for. At this time the RO is operational, but=failure of any of the above items would cause the plant to shutdown and th= Repair Time would be Lengthy and could lead to water restricti=ns and or the need to purchase water. The option to Expand the Plant could be done at the s=me time. <=div> My recommendatirn is to proceed with Gemini Water Services. Can we proceed with finalizing contracts with GWS? regards <=iv dir="ltr"> Bric= Gordon The Saint James Group U=VI EFTA_R1_01551234 EFTA02451635