JE Punch List —June 11, 2012 1. Five Palms —TOP PRIORITY - Exterior Door Shutters — removable option - Painting - outside to be completed after visit - Piano - needs tuner - Lights - add two more lights to front of Five Palms in trees - Mirrored siding — Panels sailed 6/8, EDA on STT 6/12 - Glue on site - Tapestry Molding for Ceiling — Ion - Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator - Flooring - Books — books on site will relocate over the week of 6/4 - Benches —one bench to west north of fire pit - Road grading - Piano —at Tropical FL 6/8 — scheduled to sail 6/13, EDA on STT 6/16 2. Grotto- - Floor resin - Genset wiring— scheduling to be determined 3. Berm/Top of Hill - dirt and rock needs on top of hill needs to go ASAP - hydroseed top of hill —4 large planter boxes with small planter inside require construction — size to be determined by JE - cleanup and excavate — continues - remove rock screener — completed - run power to berm center from pull box 4. Engineering/Maintenance Yard - Steel Shed — foundation in progress - Metal Sheets - on old building will be replaced week of 6/4 5. Triangle — landscaping direction required from JE 6. Flagpole Pool Caba°~ - Recovering of sofa/chairs - Furniture — needs new de 7. Entry Tree Lights — installati n complete 8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction, wall built 9. Tiki — Darren is contacting the vendor regarding the shields 10. Dock — - Decking — replace all damaged boards and carpet - complete - Floating Dock - - Jet ski Docking - review - Table/Dock Box — Bill starting 6/4 11. Kite House— review of wooden outside furniture - 12. Chillax Room - requires furniture piece for electrical/media equipment 13. Chillax Bathroom - requires blue rugs for bathroom & vanity area 14. Mechanical Building - Replacement Transformer - estimated date to be shipped from factory (Illin