To: From: Richard Bamett Sent Wed 10/16/2013 3:02:07 PM Subject: Final Work on Cooling Tower Hi please ask Mr. Epstein If the electrician and I can gain access to 71st tomorrow 10/17 at 7:15 am to work on the roof cooling tower & 6th floor electrical control panel. I will have the electrician come in the side service entrance up to the 5th floor and walk up to the 6th floor mechanical room from the back fire stairs, not to disturb Mr. Epstein if he is on the 6th floor. I am sorry we have to schedule this work while Mr.Epstein is in residence, but I gave the cooling tower people a hard time to come and complete this final piece electrical and control work. Thanks Rich B. EFTA_R1_00759793 EFTA02123934