To: [email protected]©gmail.comj: jeffrey epsteinueevacatiomagmail.comj From: Craig Martin Sent Fri 4/27/2012 1:01:53 PM Subject: Re: ok From: jeffrey epstein <[email protected]> To: Craig Martin Sent: Friday, April 27, 2012 1:18 AM Subject: Re: Need breakdown of equipment Sent from my iPad On Apr 26, 2012, at 9:57 PM, Craig Martin wrote: Michael Glidden called back this afternoon. His quote to run electric from the gym to 5 palms was: $21,140 for labor $11,740 for material, his material includes transformer, disconnects, breaker boxes, etc, everything except conduit and cable, $32,880 total LSJ to provide: Cable, Conduit, Trenching, manhole Structures, based on 1500 ft ( Michael wants to verify again) 4/0 cable is 3.84 per ft Ground cable is .78 ft conduit is 11.99 per 10 ft section ( not per ft as we had thought last nite) $8325.50 cost for LSJ on the low end. Brice had suggested we run two extra conduits for future use. That would add to cost. So basic package is $41,205.50 plus LSJ labor and material. Need to verify length and if LSJ wants two extra conduits. I can send this to Tom in the AM to get LSJ labor figures. Hope this helps. Craig From: Jeffrey E ' < m> To: Craig Martin • Sent: Thursday, Apn , Subject: EFTA_R1_00485580 EFTA01992324