To: J Epsteinueevacation©gmail.com] From: BMG Sent: Wed 5/29/2013 1:39:38 PM Subject: Fwd: Zorro Ranch Jeffrey Attached is the preliminary report from Beaudin Ganzc for your review Regards Brice Gordon 49 Zorro Ranch Rd Stanley, NM 87056 Ph: Begin forwarded message: From: "Morgan Royce" iMMINIMINE Date: May 28, 2013, 6:05:35 PM MDT To: "Richard Kahn" WI> Cc: "Brice Gordon" Subject: Zorro Ranch Richard, We made our site visit last Thursday to refresh memories, investigate electrical and meet with Brice. Overall the visit was very informative. The Pool Space was within reasonable tolerances even though the pool conditioning system was not functioning in dehumidification but was re-circulating air. We looked for additional drawings of the space and with Brice's help we were able to find a SUP set that showed/implied the system layout of ductwork, etc. Nothing definitive but still helpful. We looked at the Mechanical space in general to determine how the system is currently set up for evaluation. We will begin a detail analysis shortly. We briefly discussed schedule on modifications and are of the understanding that a direction/solution needs to be in place no later than end of August. As you all know there are problems. The most Notable are listed below: 1. The current unit is not functioning and when it is functioning there appears to be a restriction in the air flow. a. We would request that the existing ductwork be investigated by Camera to verify routing and condition of the Ductwork. b. Air flow is critical in controlling condensation and overall pool environmental quality. EFTA_R1_00456723 EFTA01972881